2012-03-20   Complete process equipment forl Nordre Ål heat plant (NÅVS), Lillehammer (Eidsiva Bioenergi AS)
Eidsiva plan to construct a heat plant in Lillehammer that shall cover all the heat need in the district heating network that is now being established in Lillehammer. This contract is for: Complete process equipment for the bioenergy plant (incineration of wood chippings) and a gas fired plant with auxiliary equipment (such as top load and back up plant) for the production of hot water/district heating. The procurement procedure is “negotiated procedure”. The procurement will be made in two stages: Stage … Vis anskaffelsen »
Nevnte leverandører: Järnforsen Energi System Ab
2012-02-21   Contractor/excavation services for laying of district heating network (Hedmark and Oppland) (Eidsiva Bioenergi AS)
The objective of the tender contest is to enter into framework agreements in relation to the Awarding Authority’s requirements for professional and competitive contractors for contractor/excavation services in connection with development of district heating network. The selected tender procedure is “tender competition with negotiations”. The procurement shall be executed in 2 stages: — Stage 1: qualification and selection of qualified contractors, — Stage 2: access to tender request/tender documents for … Vis anskaffelsen »
Nevnte leverandører: 918808574 Dobloug Entreprenør As Maskinanlegg As S & B Stenersen As Veflen Entreprenør As
2012-02-21   Contractor/excavation services for laying of district heating network (Hedmark and Oppland counties) (Eidsiva Bioenergi AS)
The objective of the tender contest is to enter into framework agreements in relation to the Awarding Authority’s requirements for professional and competitive contractors for contractor/excavation services in connection with development of district heating network. The selected tender procedure is “tender competition with negotiations”. The procurement shall be executed in 2 stages: — Stage 1: qualification and selection of qualified contractors, — Stage 2: access to tender request/tender documents for … Vis anskaffelsen »
2011-08-12   041-2011: process equipment for combined heat & power plant (CHP) using waste wood (Eidsiva Bioenergi AS)
Process equipment for combined heat & power plant (CHP) to produce power, process steam and district heating. This means for example boiler, furnace (bio and gas) equipment for flue gas treatment, ash handling, necessary purification equipment, electrical installation, piping system and necessary completions inside the energy central. Bio-power plant approx. 25 MW. The plant will deliver approximately 200 GWh energy. The fuel is based on recycled wood and logging waste. (This procurement does not include … Vis anskaffelsen »