Anskaffelser: Bodø kommune, Byteknikk
4 arkiverte anskaffelser
Bodø kommune, Byteknikk har historisk anskaffet bygge- og anleggsvirksomhet, transportutstyr og hjelpeprodukter til transport og motorkjøretøy.
Historisk har leverandører til Bodø kommune, Byteknikk vært A. Moan as og Fauskebygg AS.
Nyeste anskaffelser av Bodø kommune, Byteknikk
2016-05-23
Bodø municipality — Storm water tunnel. Alberthaugen-Rishaugen (Bodø kommune, Byteknikk)
The Works include blasting of a 680 m tunnel with a cross-section of 15,8 m. The laying of 300 m culvert with a diameter of Ø2 400 (Ø2 500) and a 25 m culvert with a diameter of Ø2 000. The Construction (concrete) of a weir with sand trap, a staircase in the crossing between the culvert and the tunnel (Alberthaugen) and the construction (concrete) of a wall with access in the crossing between the tunnel and the culvert (Rishaugen). Vis anskaffelsen »
The Works include blasting of a 680 m tunnel with a cross-section of 15,8 m. The laying of 300 m culvert with a diameter of Ø2 400 (Ø2 500) and a 25 m culvert with a diameter of Ø2 000. The Construction (concrete) of a weir with sand trap, a staircase in the crossing between the culvert and the tunnel (Alberthaugen) and the construction (concrete) of a wall with access in the crossing between the tunnel and the culvert (Rishaugen). Vis anskaffelsen »
2015-02-02
The hiring of lorries and excavators 2015-2016 (Bodø kommune, Byteknikk)
The hiring of lorries and excavators with drivers for supplementing Byteknikk's own machinery. The contract also include hiring of excavators without driver. Vis anskaffelsen »
The hiring of lorries and excavators with drivers for supplementing Byteknikk's own machinery. The contract also include hiring of excavators without driver. Vis anskaffelsen »
2014-03-12
Water supply North side - Stage 4 (Bodø kommune, Byteknikk)
— Access road from FV834 to new drinking water reservoir, length approx. 1440 metres; — Transfer line to the catchment, and supply pipe from the reservoir, length approx. 1370 metres; — Various water and sewerage pipes in the access road which pass through a zoned future housing area, length approx. 450 metres; — Conduits for electrical and communication cables; — Drinking water catchment and valve chambers. Vis anskaffelsen »
— Access road from FV834 to new drinking water reservoir, length approx. 1440 metres; — Transfer line to the catchment, and supply pipe from the reservoir, length approx. 1370 metres; — Various water and sewerage pipes in the access road which pass through a zoned future housing area, length approx. 450 metres; — Conduits for electrical and communication cables; — Drinking water catchment and valve chambers. Vis anskaffelsen »