Framework agreement for replacing and modernising lifts.
Oslo kommune v/ Boligbygg Oslo KF
There is a continual need to replace or modernise lifts in The Municipal Undertaking for Social Housing's (BBY) properties that have reached their lifetime. The objective of the procurement is to safeguard BBY's buildings through proper operation, preventive maintenance, continual development and good management.
FristDeadline 2026-09-14
Hvem? Hva?- • Deler til heiser, elevatorer med heisespann eller rulletrapper › Deler til heiser
- • Heiser › Mekaniske heiser
- • Installasjon av heis og rulletrapp › Installasjon av heis
- • Reparasjon og vedlikehold knyttet til bygninger › Reparasjon og vedlikehold av elektriske og mekaniske installasjoner i bygninger
- • Oslo og Viken › Oslo
Anskaffelseshistorikk
| Dato | Dokument |
|---|---|
| 2026-08-14 | Kunngjøring av konkurranse |
Kunngjøring av konkurranse (2026-08-14)
Gjenstand
Anskaffelsens omfang
Tittel: Framework agreement for replacing and modernising lifts.
Referansenummer:
Kort beskrivelse:
Kontrakttype: Varer
Produkter/tjenester: Heiser 📦
Estimert verdi eksklusive mva: 95 000 000 NOK 💰
Beskrivelse
Intern identifikator:
Tilleggsprodukter/-tjenester:
Formål med strategisk innkjøp: Reduksjon av miljøpåvirkning
Reduction of environmental impact
Land: Norge 🇳🇴
Utførelsessted: Oslo 🏙️
Varighet: 48 måneder
Maksimalt antall fornyelser: 1
Annen informasjon om fornyelser:
Tildelingskriterier
Pris ✅
Pris (vekting): 40
Kvalitetskriterium (navn): Assignment comprehension and progress plan for case assignments.
Kvalitetskriterium (vekting): 40
Kvalitetskriterium (navn): Competence of offered personnel
Kvalitetskriterium (vekting): 20
Kvalitetskriterium (navn): It is in the procurement regulations that the contracting authorities shall assess the procurement ́s total climate footprint or environmental impact. As a main rule, climate and environmental considerations shall be weighted with a minimum of 30%. If the contracting authority sets climate or environmental requirements in the requirement specifications, and these requirements clearly give better climate and environmental effect than the use of award criteria, requirements may replace the use of the award criteria, cf. the Public Procurement Regulations § 7-9 fourth paragraph. The relevant procurement concerns maintenance and manufacturing in connection with lift contracts. The majority of emissions in the lifetime of a lift shall be attributed to operation and maintenance, as well as manufacturing and material extraction. However, it is not appropriate to evaluate based on this, as it is challenging to separate suppliers from this. The larger lift suppliers deliver in accordance with industry standards and will use the same materials for the production of their products. The lifts will also be operated in Norwegian electricity mix. The contracting authority estimates that the procurement ́s climate and environmental impact beyond this is connected to transport to and from the contracting authority, as well as handling waste and materials in connection with the execution. These conditions are concrete, identifiable and are well suited for development through requirements in the requirement specifications and contract. There will not be mass transport in the call-offs, so prizes for emission free mass transport will not be carried out. The contracting authority estimates that the market is sufficiently mature to meet the requirements for the use of emission-free vehicles or other emission-free transport systems when relevant for the execution of the contract. By placing requirements in the contract, the tenderer is guaranteed a commitment to contribute to the use of emission-free vehicles throughout the entire contract period. The use of the requirements also signals to the market that Oslo municipality continues to have strict climate and environmental requirements for transport and therefore contributes to predictability for the supplier market as regards investment costs. Furthermore, the contracting authority will have requirements for waste management and contract follow-up, including that the tenderer shall report data on fulfilment of the requirement so that the environmental effect of the requirement can be efficiently checked and secured. This makes it possible to check and follow-up that the measures in question are actually taken during the contract period. For this procurement, therefore, requirements in the requirement specifications and contract are considered as a more accurate and verifiable means of achieving real climate and environmental effect than the use of climate and environmental considerations as an independent award criterion. Based on this, the contracting authority considers that climate and environmental considerations should be taken care of through concrete requirements and not as an independent award criteria, cf. the Public Procurement Regulations § 7-9 fourth paragraph.
Kvalitetskriterium (vekting): 0
Tittel
Identifikasjonsnummer for delkontrakt:
Prosedyre
Prosedyretype
Åpen anbudskonkurranse ✅
Rettslig grunnlag: Direktiv 2014/24/EU
Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2026-09-14 10:00:00.000 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk bokmål 🗣️
Minste tidsramme som tilbyderen må opprettholde tilbudet i: 3 måneder
Informasjon om en rammeavtale eller en dynamisk innkjøpsordning
Rammeavtale med én leverandør ✅
Maksimalt antall deltakere: 2
Anbudsvilkår
Elektronisk fakturering: Påkrevd
Elektronisk bestilling vil bli brukt ✅
Elektronisk betaling vil bli brukt ✅
Tildelingskriterier
Vekttype: Vekting (prosent, eksakt)
Anbudsvilkår
Kontrakten har gjennomføringsvilkår ✅
Juridisk, økonomisk, finansiell og teknisk informasjon
Vilkår for deltakelse
Utvalgskriterium: Innmelding i handelsregister
Liste og kort beskrivelse av regler og kriterier:
Utvalgskriterium: Andre økonomiske eller finansielle krav
Liste og kort beskrivelse av regler og kriterier:
Utvalgskriterium: Tiltak for miljøstyring
Liste og kort beskrivelse av regler og kriterier:
Utvalgskriterium: Tiltak for å sikre kvalitet
Liste og kort beskrivelse av regler og kriterier:
Utvalgskriterium: Forsyningskjedestyring
Liste og kort beskrivelse av regler og kriterier:
Utvalgskriterium: Referanser på spesifiserte leveranser
Liste og kort beskrivelse av regler og kriterier:
Hovedfinansieringsvilkår og betalingsordninger og/eller henvisning til relevante bestemmelser som regulerer dem: N/A
Vilkår knyttet til kontrakten
Vilkår for kontraktoppfyllelse: N/A
Vilkår for deltakelse
Utestengelsesgrunn:
Beskrivelse av utelukkelsesgrunner:
Oppdragsgiver
Navn og adresser
Navn: Oslo kommune v/ Boligbygg Oslo KF
Nasjonalt registreringsnummer:
Postadresse: Nydalen alle 37
Postnummer: 0484
Poststed: Oslo
Region: Oslo 🏙️
Land: Norge 🇳🇴
Kontaktpunkt: Fredrik Christian Rodum Agdestein
E-post: postmottak@bby.oslo.kommune.no 📧
Telefon: +47 21802180 📞
URL: https://www.oslo.kommune.no/etater-foretak-og-ombud/boligbygg-oslo-kf/ 🌏
Adresse til kjøperprofilen: https://www.oslo.kommune.no/etater-foretak-og-ombud/boligbygg-oslo-kf/ 🌏
Type oppdragsgiver
Offentligrettslig organ
Hovedaktivitet
Boliger og samfunnstilbud
Kommunikasjon
Deltakelses-URL: https://app.artifik.no/procurements/7387 🌏
Navn: e-Tendering
Tilgang til konkurransegrunnlaget er begrenset
Elektronisk innsending: Påkrevd
Utfyllende informasjon
Klageinstans
Navn: Oslo tingrett
Nasjonalt registreringsnummer:
Postadresse: Postboks 2106 Vika
Postnummer: 0125
Poststed: Oslo
Region: Oslo 🏙️
Land: Norge 🇳🇴
E-post: oslo.tingrett@domstol.no 📧
Telefon: +47 22035200 📞
URL: https://www.domstol.no/no/domstoler/tingrett/oslo-tingrett/ 🌏
Tjeneste hvor informasjon om klageprosedyren kan innhentes
Samme som: Navn og adresser
Informasjon om elektroniske arbeidsflyter
Elektronisk fakturering vil bli akseptert
Kilde: OJS 2026/S 157-566414 (2026-08-14)
Gjenstand
Anskaffelsens omfang
Tittel: Framework agreement for replacing and modernising lifts.
Referansenummer:
7387
Kort beskrivelse:
There is a continual need to replace or modernise lifts in The Municipal Undertaking for Social Housing's (BBY) properties that have reached their lifetime. The objective of the procurement is to safeguard BBY's buildings through proper operation, preventive maintenance, continual development and good management.
Vis mer
Produkter/tjenester: Heiser 📦
Estimert verdi eksklusive mva: 95 000 000 NOK 💰
Beskrivelse
Intern identifikator:
9690
Tilleggsprodukter/-tjenester:
+ 9 til
Reduction of environmental impact
Land: Norge 🇳🇴
Utførelsessted: Oslo 🏙️
Varighet: 48 måneder
Maksimalt antall fornyelser: 1
Annen informasjon om fornyelser:
Two years.
The framework agreement period is two years. Boligbygg has the right to extend the framework agreement for a further one year at a time, up to 2 times. Boligbygg will notify the Contractor about whether the option will be taken up at the latest three months before the framework agreement expires.
The total duration of the framework agreement can, therefore, be 4 years (2+1+1).
Vis mer
Pris ✅
Pris (vekting): 40
Kvalitetskriterium (navn): Assignment comprehension and progress plan for case assignments.
Kvalitetskriterium (vekting): 40
Kvalitetskriterium (navn): Competence of offered personnel
Kvalitetskriterium (vekting): 20
Kvalitetskriterium (navn): It is in the procurement regulations that the contracting authorities shall assess the procurement ́s total climate footprint or environmental impact. As a main rule, climate and environmental considerations shall be weighted with a minimum of 30%. If the contracting authority sets climate or environmental requirements in the requirement specifications, and these requirements clearly give better climate and environmental effect than the use of award criteria, requirements may replace the use of the award criteria, cf. the Public Procurement Regulations § 7-9 fourth paragraph. The relevant procurement concerns maintenance and manufacturing in connection with lift contracts. The majority of emissions in the lifetime of a lift shall be attributed to operation and maintenance, as well as manufacturing and material extraction. However, it is not appropriate to evaluate based on this, as it is challenging to separate suppliers from this. The larger lift suppliers deliver in accordance with industry standards and will use the same materials for the production of their products. The lifts will also be operated in Norwegian electricity mix. The contracting authority estimates that the procurement ́s climate and environmental impact beyond this is connected to transport to and from the contracting authority, as well as handling waste and materials in connection with the execution. These conditions are concrete, identifiable and are well suited for development through requirements in the requirement specifications and contract. There will not be mass transport in the call-offs, so prizes for emission free mass transport will not be carried out. The contracting authority estimates that the market is sufficiently mature to meet the requirements for the use of emission-free vehicles or other emission-free transport systems when relevant for the execution of the contract. By placing requirements in the contract, the tenderer is guaranteed a commitment to contribute to the use of emission-free vehicles throughout the entire contract period. The use of the requirements also signals to the market that Oslo municipality continues to have strict climate and environmental requirements for transport and therefore contributes to predictability for the supplier market as regards investment costs. Furthermore, the contracting authority will have requirements for waste management and contract follow-up, including that the tenderer shall report data on fulfilment of the requirement so that the environmental effect of the requirement can be efficiently checked and secured. This makes it possible to check and follow-up that the measures in question are actually taken during the contract period. For this procurement, therefore, requirements in the requirement specifications and contract are considered as a more accurate and verifiable means of achieving real climate and environmental effect than the use of climate and environmental considerations as an independent award criterion. Based on this, the contracting authority considers that climate and environmental considerations should be taken care of through concrete requirements and not as an independent award criteria, cf. the Public Procurement Regulations § 7-9 fourth paragraph.
Kvalitetskriterium (vekting): 0
Tittel
Identifikasjonsnummer for delkontrakt:
LOT-0001
Prosedyre
Prosedyretype
Åpen anbudskonkurranse ✅
Rettslig grunnlag: Direktiv 2014/24/EU
Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2026-09-14 10:00:00.000 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk bokmål 🗣️
Minste tidsramme som tilbyderen må opprettholde tilbudet i: 3 måneder
Informasjon om en rammeavtale eller en dynamisk innkjøpsordning
Rammeavtale med én leverandør ✅
Maksimalt antall deltakere: 2
Anbudsvilkår
Elektronisk fakturering: Påkrevd
Elektronisk bestilling vil bli brukt ✅
Elektronisk betaling vil bli brukt ✅
Tildelingskriterier
Vekttype: Vekting (prosent, eksakt)
Anbudsvilkår
Kontrakten har gjennomføringsvilkår ✅
Juridisk, økonomisk, finansiell og teknisk informasjon
Vilkår for deltakelse
Utvalgskriterium: Innmelding i handelsregister
Liste og kort beskrivelse av regler og kriterier:
Company Registration Certificate: The tenderer shall be a legally established company.
Documentation requirements:
Norwegian companies: Company Registration Certificate.
Foreign companies: Proof that the company is registered in a trade or business register as prescribed by the law of the country where the company is established.
Vis mer
Liste og kort beskrivelse av regler og kriterier:
Economic and financial capacity: The tenderer shall have sufficient economic and financial capacity to be able to fulfil the contract.
Documentation requirements:
The contracting authority will obtain a credit rating.
The contracting authority reserves the right to request other financial information if needed.
Vis mer
Liste og kort beskrivelse av regler og kriterier:
Environmental management system: Tenderers are required to have implemented environmental management measures that ensure that the tenderer is suitable to fulfil the contract ́s environmental provisions (see the framework agreement point 11 with further referrals).
This means that the tenderer has methods for working actively and systematically to reduce negative environmental impact from activities connected to the execution of this contract.
Documentation requirements:
A description of the tenderer's environmental management measures. If a tenderer has certificates from independent bodies that document the environmental management system, they can be presented as documentation.
Refer to the EU Scheme for Environmental Management and Environmental Audit (EMAS), other recognised environmental management systems in regulation (EF) no. 1221/2009 article 45, or equivalent, and other environmental management standards based on relevant European or international standards from accredited bodies such as ISO 14001 or equivalent.
Vis mer
Liste og kort beskrivelse av regler og kriterier:
Quality assurance system: Tenderers shall have a relevant quality assurance system for the content of the contract.
Documentation requirements:
A description of the tenderer's quality assurance methods.
Alternatively: Certificate for the company's quality assurance system issued by independent bodies that confirms the tenderer fulfils certain quality assurance standards, for example ISO 9001:2015.
Vis mer
Liste og kort beskrivelse av regler og kriterier:
Due diligence assessments: Tenderers shall be suitable to fulfil contract requirements for due diligence assessments for responsible businesses.
This means that the Tenderer has implemented measures and systems that are used in the Tenderer's work to safeguard basic human rights and decent working conditions, as well as prevent environmental degradation and corruption.
Documentation requirements:
A description of the tenderer's systems for working with due diligence assessments in accordance with the UN ́s guiding principles for business and human rights (UNGP) and OECD ́s guidelines for multinational companies. The documentation shall include:
* Formal policies/policies that cover an obligation to comply with the requirements of responsible businesses.
* Formal policy/guidelines for accountability for sub-suppliers/the supplier chain, (Supplier Code of Conduct). [This shall only be delivered if sub-suppliers are used.]
* Descriptions of the tenderer's processes and routines for how the company works with due diligence assessments.
The attached reply form, cf. annex 7 to the tender documentation, is to be used to document fulfilment of the requirement.
The reply form contains guidance that the tenderer is expected to use in order to minimise the risk of deviations from the tender requirements. Tenderers can submit other documentation for the requirements, but the contracting authority strongly encourages to use the form to document fulfilment of the qualification requirements.
If a tenderer would like to use other companies to document fulfilment of the qualification requirement, a completed and signed commitment statement must be enclosed with the tender. The template for the commitment statement is attached in the tender documentation.
Documents can be enclosed in English, Swedish and Danish in order to document fulfilment of the qualification requirements for due diligence assessments for responsible businesses.
Vis mer
Liste og kort beskrivelse av regler og kriterier:
Experience from equivalent assignments: Tenderers shall have experience from equivalent assignments.
Equivalent means assignments of an equivalent nature, complexity, degree of difficulty and scope.
Documentation requirements:
Overview of the tenderer's maximum 5 most important, relevant deliveries during the last five years, including information on:
· The Contracting Authority
· The value of the contract work
· Contract form
· Role in reference project
· Date of execution
· Contact person (name and telephone number)
The attached reference form, cf. annex 6 of the tender documentation, shall be used. The contracting authority reserves the right to contact the references.
Vis mer
Vilkår knyttet til kontrakten
Vilkår for kontraktoppfyllelse: N/A
Vilkår for deltakelse
Utestengelsesgrunn:
Akkord med kreditorer
Avtaler med andre økonomiske aktører som har til formål å vri konkurransen
Barnearbeid og andre former for menneskehandel
+ 23 til
Bedrageri
Brudd på forpliktelser fastsatt i nasjonale utelukkelsesgrunner
Brudd på forpliktelser på arbeidsrettens område
Brudd på forpliktelser på miljørettens område
Brudd på forpliktelser på sosialrettens område
Brudd på plikt til å betale skatter
Brudd på plikt til å betale trygdeavgifter
Brudd på yrkesetiske regler innen forsvarsanskaffelser
Deltakelse i en kriminell organisasjon
Direkte eller indirekte deltakelse i forberedelsen av denne anskaffelsen
Eiendeler under administrasjon av bobestyrer
Forretningsvirksomheten er suspendert
Grov yrkesfeil
Hvitvasking eller terrorfinansiering
Insolvens
Interessekonflikt på grunn av deltakelse i anskaffelsesprosedyren
Konkurs
Korrupsjon
Manglende pålitelighet som utgjør risiko for nasjonal sikkerhet
Terrorhandlinger eller handlinger knyttet til terrorvirksomhet
Tidlig oppsigelse, erstatning eller andre tilsvarende sanksjoner
Tilsvarende situasjon som konkurs, insolvens eller akkord etter nasjonal rett
Uriktige opplysninger, tilbakeholdt informasjon, manglende evne til å fremlegge nødvendige dokumenter, eller å ha skaffet seg fortrolige opplysninger om denne anskaffelsesprosedyren
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Vis mer
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, by enforceable judgement been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, involving European Communities or European Union member states (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier.
Vis mer
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Vis mer
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted verdict of participation in a criminal organisation by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Participation in a criminal organisation as defined in Article 2 of the Council ́s framework decision 2008/841/RIA of 24 October 2008 on control of organised crime (EUT L 300 of 11.11.2008, p. 42).
Vis mer
Has the tenderer entered into agreement(s) with other tenderers with the intention of turning the competition?
Is the tenderer aware of breaches of environmental provisions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies,…
… in the event a legal verdict has been convicted of money laundering or financing terrorism by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Money laundering or financing terrorism As defined in Article 1 of the European Parliament and Council Directive 2005/60/EF of 26 October 2005 on preventive measures against the use of the financial system for money laundering and financing terrorism (EUT L 309 of 25.11.2005, p. 15).
… at the time a legally convicted of fraud has been convicted of fraud by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Fraud included in Article 1 of the Convention on protection of the Financial Interests of the European Communities (EFT C 316 of 27.11.1995, p. 48).
… in the event a legal verdict has been convicted of child labour and other forms of human trafficking by a verdict handed down no more than five years ago, or a rejection period determined directly in the judgement that still applies? Child labour and other forms of human trafficking as defined in Article 2 of the European Parliament and council directive 2011/36/EU of 5. 1 April 2011 on the prevention and control of human trafficking and the protection of its victims and for compensation of the Council ́s framework decision 2002/629/RIA (EUT L 101 of 15.4.2011, p. 1).
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Vis mer
Is the tenderer aware of breaches of provisions on working conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Vis mer
Has the tenderer: a) given grossly incorrect information with the notification of the information required to verify that there is no basis for rejection, or of the qualification requirements being fulfilled, b) failed to provide such information, c) made reservations immediately to present the supporting documents requested by the contracting authority, or d) improperly affected the contracting authority ́s decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award?
Vis mer
Is the tenderer aware of a conflict of interest as stated in national law, the relevant notice or procurement documents?
Has the tenderer or an entity associated with the supplier advised the contracting authority or in another way been involved in the planning of the competition?
Has the tenderer committed serious errors in professional practice? If relevant, see the definitions in national law, the relevant notice or procurement documents.
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
Vis mer
Is the tenderer aware of breaches of provisions on social conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Have tenderers failed to fulfil all their social security obligations in the country where they are established and in their member state, if this is a different country than what he is established in?
Has the tenderer not fulfilled all of his tax and duty obligations in both the country where he is established and in the contracting authority's member state, if this is a different country than what he is established in?
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies,…
… in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.
… have been legally convicted of offences regarding professional behaviour in defence procurements?
Is the tenderer assessed to lack the reliability necessary to exclude the risk of national security?
The contracting authority shall state that in Norway there are national rejection reasons. These shall be described in the procurement documents. Tenderers must respond to whether they are in one or more of the situations described in the national rejection reasons.
Vis mer
Oppdragsgiver
Navn og adresser
Navn: Oslo kommune v/ Boligbygg Oslo KF
Nasjonalt registreringsnummer:
974780747
Postadresse: Nydalen alle 37
Postnummer: 0484
Poststed: Oslo
Region: Oslo 🏙️
Land: Norge 🇳🇴
Kontaktpunkt: Fredrik Christian Rodum Agdestein
E-post: postmottak@bby.oslo.kommune.no 📧
Telefon: +47 21802180 📞
URL: https://www.oslo.kommune.no/etater-foretak-og-ombud/boligbygg-oslo-kf/ 🌏
Adresse til kjøperprofilen: https://www.oslo.kommune.no/etater-foretak-og-ombud/boligbygg-oslo-kf/ 🌏
Type oppdragsgiver
Offentligrettslig organ
Hovedaktivitet
Boliger og samfunnstilbud
Kommunikasjon
Deltakelses-URL: https://app.artifik.no/procurements/7387 🌏
Navn: e-Tendering
Tilgang til konkurransegrunnlaget er begrenset
Elektronisk innsending: Påkrevd
Utfyllende informasjon
Klageinstans
Navn: Oslo tingrett
Nasjonalt registreringsnummer:
926725939
Postadresse: Postboks 2106 Vika
Postnummer: 0125
Poststed: Oslo
Region: Oslo 🏙️
Land: Norge 🇳🇴
E-post: oslo.tingrett@domstol.no 📧
Telefon: +47 22035200 📞
URL: https://www.domstol.no/no/domstoler/tingrett/oslo-tingrett/ 🌏
Tjeneste hvor informasjon om klageprosedyren kan innhentes
Samme som: Navn og adresser
Informasjon om elektroniske arbeidsflyter
Elektronisk fakturering vil bli akseptert
Kilde: OJS 2026/S 157-566414 (2026-08-14)
Nye anskaffelser i relaterte kategorier 🆕