NTNU shall enter into a framework agreement for the inspection and maintenance of a gas alarm system for NTNU ́s buildings in Trondheim. The delivery and place of work for the deliveries will be NTNU in Trondheim. See Annex 1c Site Overview for a more detailed description of the different installations, including location and type. The framework agreement includes the following works: Annual inspections The annual inspection includes two meetings, in one turn, a check of the gas warning system + one calibration is carried out in the second turn-out, only one calibration will be carried out. Maintenance Maintenance means repairs, replacements and improvements of deviations (errors and shortcomings) on the installations in order for them to function as intended. See the requirement specifications for a comprehensive description of the delivery. The planned start-up for the new contract is in the medio August, so that the autumn inspections shall be carried out under this agreement.
Kunngjøring av konkurranse (2026-04-28) Gjenstand Anskaffelsens omfang
Tittel: Framework agreement for inspections and maintenance of gas alarms.
Referansenummer: 26-0068
Kort beskrivelse:
“NTNU shall enter into a framework agreement for the inspection and maintenance of a gas alarm system for NTNU ́s buildings in Trondheim. The delivery and...”
Kort beskrivelse
NTNU shall enter into a framework agreement for the inspection and maintenance of a gas alarm system for NTNU ́s buildings in Trondheim. The delivery and place of work for the deliveries will be NTNU in Trondheim. See Annex 1c Site Overview for a more detailed description of the different installations, including location and type.
The framework agreement includes the following works:
Annual inspections
The annual inspection includes two meetings, in one turn, a check of the gas warning system + one calibration is carried out in the second turn-out, only one calibration will be carried out.
Maintenance
Maintenance means repairs, replacements and improvements of deviations (errors and shortcomings) on the installations in order for them to function as intended.
See the requirement specifications for a comprehensive description of the delivery.
The planned start-up for the new contract is in the medio August, so that the autumn inspections shall be carried out under this agreement.
Vis mer
Kontrakttype: Tjenester
Produkter/tjenester: Reperasjons- og vedlikeholdstjenester📦
Estimert verdi eksklusive mva: 2 000 000 NOK 💰
Beskrivelse
Beskrivelse av anskaffelsen:
“NTNU shall enter into a framework agreement for the inspection and maintenance of a gas alarm system for NTNU ́s buildings in Trondheim. The delivery and...”
Beskrivelse av anskaffelsen
NTNU shall enter into a framework agreement for the inspection and maintenance of a gas alarm system for NTNU ́s buildings in Trondheim. The delivery and place of work for the deliveries will be NTNU in Trondheim. See Annex 1c Site Overview for a more detailed description of the different installations, including location and type.
The framework agreement includes the following works:
Annual inspections
The annual inspection includes two meetings, in one turn, a check of the gas warning system + one calibration is carried out in the second turn-out, only one calibration will be carried out.
Maintenance
Maintenance means repairs, replacements and improvements of deviations (errors and shortcomings) on the installations in order for them to function as intended.
See the requirement specifications for a comprehensive description of the delivery.
The planned start-up for the new contract is in the medio August, so that the autumn inspections shall be carried out under this agreement.
Vis mer
Tilleggsinformasjon:
“In accordance with the Public Procurement Regulations § 7-9 (2), climate and environmental considerations shall as a main rule be weighted with a minimum of...”
Tilleggsinformasjon
In accordance with the Public Procurement Regulations § 7-9 (2), climate and environmental considerations shall as a main rule be weighted with a minimum of 30% in the award criteria. The requirement can be waived if it is clear that the requirements in the requirement specifications give a better climate - and environmental effect than the award criteria, cf. the Public Procurement Regulations § 7-9 (4).
The procurement primarily includes the procurement of services (control and maintenance of gas alarms), which are carried out in the contracting authority ́s locations. The central climate and environmental footprint of this procurement is, thus, passenger transport to and from the contracting authority ́s locations in connection with services performed.
The contracting authority has assessed how the contracting authority can achieve the lowest climate and environment for the services included in this procurement, and concluded that the absolute requirement for the use of zero emission vehicles for passenger cars and small goods vans will clearly have a lower environmental impact than setting award criteria and evaluating the different types of fuel used in the service.
There are also minimum requirements for products, packaging and waste management in the requirement specification.
The contracting authority therefore believes that the condition for using the exemption provision in the PUBLIC Procurement Regulations § 7-9 (4) is fulfilled.
Prosedyre Prosedyretype
Åpen anbudskonkurranse ✅ Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2026-05-29 10:00:00 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Minste tidsramme som tilbyderen må opprettholde tilbudet i: 3
Informasjon om en rammeavtale eller en dynamisk innkjøpsordning
Rammeavtale med flere leverandører ✅
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår knyttet til kontrakten
Vilkår for kontraktoppfyllelse:
“The contract will include requirements for wages and working conditions, documentation and sanctions in accordance with the regulations on wage and working...”
Vilkår for kontraktoppfyllelse
The contract will include requirements for wages and working conditions, documentation and sanctions in accordance with the regulations on wage and working conditions dated 8 February 2008 no. 112.
“In accordance with the Public Procurement Regulations § 7-9 (2), climate and environmental considerations shall as a main rule be weighted with a minimum of...”
In accordance with the Public Procurement Regulations § 7-9 (2), climate and environmental considerations shall as a main rule be weighted with a minimum of 30% in the award criteria. The requirement can be waived if it is clear that the requirements in the requirement specifications give a better climate - and environmental effect than the award criteria, cf. the Public Procurement Regulations § 7-9 (4).
The procurement primarily includes the procurement of services (control and maintenance of gas alarms), which are carried out in the contracting authority ́s locations. The central climate and environmental footprint of this procurement is, thus, passenger transport to and from the contracting authority ́s locations in connection with services performed.
The contracting authority has assessed how the contracting authority can achieve the lowest climate and environment for the services included in this procurement, and concluded that the absolute requirement for the use of zero emission vehicles for passenger cars and small goods vans will clearly have a lower environmental impact than setting award criteria and evaluating the different types of fuel used in the service.
There are also minimum requirements for products, packaging and waste management in the requirement specification.
The contracting authority therefore believes that the condition for using the exemption provision in the PUBLIC Procurement Regulations § 7-9 (4) is fulfilled.
Vis mer Klageinstans
Navn: Trøndelag Tingrett
Nasjonalt registreringsnummer: 926 722 794
Postnummer: 7004
Poststed: Trondheim
Region: Trøndelag🏙️
Land: Norge 🇳🇴
E-post: trondelag.tingrett@domstol.no📧
URL: https://www.domstol.no/no/domstoler/tingrett/trondelag-tingrett/🌏 Klageprosedyre
Presis informasjon om frister for klageprosedyrer:
“Stated in the contract award notification. Ten days.” Informasjon om elektroniske arbeidsflyter
Elektronisk fakturering vil bli akseptert
Elektronisk bestilling vil bli brukt
Elektronisk betaling vil bli brukt
Kilde: OJS 2026/S 083-294580 (2026-04-28)