Tokke municipality is the project owner for the construction of a new foot and cycle path at Vistadmoen in Tokke municipality. The current route runs along county road 38 and goes from the intersection/exit to Gullkopp and up to the skidding area/pocket just before Vistad bridge. New lighting will be installed along the foot and cycle path. Water and sewage will also be built into the new foot and cycle path. Existing high-voltage lines will be altered and a new high-voltage route is planned that crosses county road 38.
Stærk & Co AS has been engaged as the responsible engineering designer for a new foot and cycle path with associated water and sewage.
Otera Traftec AS has been engaged as the responsible engineering designer for the lighting along the new foot and cycle path.
Frist
Fristen for mottak av tilbud var 2023-09-29.
Anskaffelsen ble publisert 2023-09-05.
Kunngjøring av konkurranse (2023-09-05) Gjenstand Anskaffelsens omfang
Tittel: Foundation work for highways, roads, streets and footpaths
Referansenummer: 2023/1401
Kort beskrivelse:
“Tokke municipality is the project owner for the construction of a new foot and cycle path at Vistadmoen in Tokke municipality. The current route runs along...”
Kort beskrivelse
Tokke municipality is the project owner for the construction of a new foot and cycle path at Vistadmoen in Tokke municipality. The current route runs along county road 38 and goes from the intersection/exit to Gullkopp and up to the skidding area/pocket just before Vistad bridge. New lighting will be installed along the foot and cycle path. Water and sewage will also be built into the new foot and cycle path. Existing high-voltage lines will be altered and a new high-voltage route is planned that crosses county road 38.