Vestland County is building a new road to bypass the landslide-prone Heilevang area on county road 609 The project will take place in Sunnfjord and Askvoll Municipalities. The project includes engineering design and construction of new roads with a tunnel through rock and loose soil, a new bridge and the existing road.
Frist
Fristen for mottak av tilbud var 2023-11-17.
Anskaffelsen ble publisert 2023-10-17.
Kunngjøring av konkurranse (2023-10-17) Gjenstand Anskaffelsens omfang
Tittel: Construction work
Referansenummer: VLFK/23/296
Kort beskrivelse:
“Vestland County is building a new road to bypass the landslide-prone Heilevang area on county road 609 The project will take place in Sunnfjord and Askvoll...”
Kort beskrivelse
Vestland County is building a new road to bypass the landslide-prone Heilevang area on county road 609 The project will take place in Sunnfjord and Askvoll Municipalities. The project includes engineering design and construction of new roads with a tunnel through rock and loose soil, a new bridge and the existing road.
Vis mer Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsvirksomhet📦
Tilleggs-CPV: Anleggsarbeid i forbindelse med tunneler📦 Utførelsessted
NUTS-region: Vestland🏙️
Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet