The Contracting Authority hereby invites tenderers to a competition for contract BA-26-013-VT-OMSORGSSENTER in Vestre. Toten municipality. Vestre Toten municipality shall construct a new welfare centre with a gross area of approx. 8,900 m2. The centre shall be located at Bøverbru on the site of the current nursing home. Drains/title no. 63/15. 48 nursing home places shall be constructed, 16 sheltered accommodation flats and 30 activity places. A flexible building shall be constructed that can take on the coming changes. The sheltered accommodation flats can be converted to institution places if needed. It is also an ambition for the project that the building shall be available and open to the local community. The existing nursing home shall be demolished as a part of this contract. The building shall be constructed with a total of 3 floors with a basement under parts of the building. The building is planned with steel and concrete with wooden facade, facade chip and metal cladding. Sensory gardens shall be developed in connection with the building. The terrain must be adapted to neighbouring buildings and retaining walls shall be established against neighbouring buildings. A superstructure shall be established that binds Gimlevegen sheltered accommodation flats together with the new sheltered accommodation centre. Energy wells shall be established that shall be connected to heat pumps for heating the building. Two parking places shall also be constructed for Gimletun sheltered accommodation flats and Bøverbru nursery school. Gimlevegen sheltered accommodation flats, Gimletun sheltered accommodation flats and Bøverbru nursery school. Access and parking must be taken care of for employees, goods delivery, stretcher vehicle, ambulance. etc. during the entire construction period. See part II - the contract documentation for further information on the project, contract division and the contract work. The start of the contract is autumn 2026, with the expected completion autumn 2028.
Frist
Fristen for mottak av tilbud var 2026-05-29.
Anskaffelsen ble publisert 2026-03-27.
Kunngjøring av konkurranse (2026-03-27) Gjenstand Anskaffelsens omfang
Tittel: BA-26-013-VT WELFARE CENTRE
Referansenummer: 4813
Kort beskrivelse:
The Contracting Authority hereby invites tenderers to a competition for contract BA-26-013-VT-OMSORGSSENTER in Vestre.
Toten municipality.
Vestre Toten municipality shall construct a new welfare centre with a gross area of approx. 8,900 m2. The centre shall be located at
Bøverbru on the site of the current nursing home. Drains/title no. 63/15. 48 nursing home places shall be constructed, 16
sheltered accommodation flats and 30 activity places.
A flexible building shall be constructed that can take on the coming changes. The sheltered accommodation flats can
be converted to institution places if needed.
It is also an ambition for the project that the building shall be available and open to the local community.
The existing nursing home shall be demolished as a part of this contract.
The building shall be constructed with a total of 3 floors with a basement under parts of the building. The building is planned with steel and
concrete with wooden facade, facade chip and metal cladding.
Sensory gardens shall be developed in connection with the building. The terrain must be adapted to neighbouring buildings and
retaining walls shall be established against neighbouring buildings. A superstructure shall be established that binds Gimlevegen sheltered accommodation flats
together with the new sheltered accommodation centre.
Energy wells shall be established that shall be connected to heat pumps for heating the building.
Two parking places shall also be constructed for Gimletun sheltered accommodation flats and Bøverbru nursery school.
Gimlevegen sheltered accommodation flats, Gimletun sheltered accommodation flats and
Bøverbru nursery school. Access and parking must be taken care of for employees, goods delivery, stretcher vehicle, ambulance.
etc. during the entire construction period.
See part II - the contract documentation for further information on the project, contract division and the contract work.
The start of the contract is autumn 2026, with the expected completion autumn 2028.
The Contracting Authority hereby invites tenderers to a competition for contract BA-26-013-VT-OMSORGSSENTER in Vestre.
Toten municipality.
Vestre Toten municipality shall construct a new welfare centre with a gross area of approx. 8,900 m2. The centre shall be located at
Bøverbru on the site of the current nursing home. Drains/title no. 63/15. 48 nursing home places shall be constructed, 16
sheltered accommodation flats and 30 activity places.
A flexible building shall be constructed that can take on the coming changes. The sheltered accommodation flats can
be converted to institution places if needed.
It is also an ambition for the project that the building shall be available and open to the local community.
The existing nursing home shall be demolished as a part of this contract.
The building shall be constructed with a total of 3 floors with a basement under parts of the building. The building is planned with steel and
concrete with wooden facade, facade chip and metal cladding.
Sensory gardens shall be developed in connection with the building. The terrain must be adapted to neighbouring buildings and
retaining walls shall be established against neighbouring buildings. A superstructure shall be established that binds Gimlevegen sheltered accommodation flats
together with the new sheltered accommodation centre.
Energy wells shall be established that shall be connected to heat pumps for heating the building.
Two parking places shall also be constructed for Gimletun sheltered accommodation flats and Bøverbru nursery school.
Gimlevegen sheltered accommodation flats, Gimletun sheltered accommodation flats and
Bøverbru nursery school. Access and parking must be taken care of for employees, goods delivery, stretcher vehicle, ambulance.
etc. during the entire construction period.
See part II - the contract documentation for further information on the project, contract division and the contract work.
The start of the contract is autumn 2026, with the expected completion autumn 2028.
Kontrakttype: Bygge- og anleggsarbeid
Produkter/tjenester: Bygge- og anleggsvirksomhet📦 Beskrivelse
Intern identifikator: 6265
Tilleggsprodukter/-tjenester:
Land: Norge 🇳🇴
Utførelsessted: Innlandet
🏙️ Varighet
Startdato: 2026-08-15 📅
Sluttdato: 2028-09-30 📅
Tildelingskriterier
Pris ✅
Pris (vekting): 80
Kvalitetskriterium (navn): Turnkey contractor ́s organisation
Kvalitetskriterium (vekting): 20
Kvalitetskriterium (navn): The exclusion provisions in the Public Procurement Regulations § 7-9 (4) are used, as it is clear that climate and
the environmental requirements in the procurement will result in a better climate and environmental effect than the use of
award criterium. The climate impact identified for the procurement is connected to all the environmental themes.
The largest impact will be on climate gas emissions connected to materials and energy use, so that measures that are implemented here have the greatest impact on reducing the climate and environmental impact of the procurement.
In order to reduce greenhouse gas emissions from materials, a minimum of 20% reduction of
climate gas emissions for materials in relation to the emission limit and the extent defined by DFØ for a nursing home.
Climate gas emissions from energy are reduced by passive house levels and energy requirements being 20% lower than TEK 17. In addition the building ́s heating and cooling need shall be covered by energy wells connected to the heat pump and solar panels shall be installed on the roof.
TEK 17 barracks, fossile free, are required in order to reduce climate and the environmental impact from the construction site.
building dry/heating, emission free lifting cranes and an approximate mass balance and the use of excess matter at
Plot.
An existing site is to be constructed and occurrences of stained pigs have been found that will be moved and kept. In the gardens to be established there will be requirements for native species.
Tenderers are required not to inflict pollution on the area in connection with their activities in
The contractor must also have emission reduction measures in the event of severe pollution.
The building is raised to achieve a mass balance on the site. In addition there are requirements regarding the use of surplus matter on the site.
Low-emitting materials are required for materials that are used in the rooms and that can be used in
seem indoor air. Products containing health and environmentally hazardous substances shall not be used.
In order to reduce the environmental impact of waste production, a maximum of 25 kg/m2 waste is required (except
demolition waste), and the source sorting shall be at least 95%.
The passive house level requirements, 20 % reduction as regards TEK 17 and reductions in greenhouse gas emissions from materials in relation to reference value, represent best practice for these topics. When using these
requirements together with the other requirements in the contract, it is, according to our knowledge and experience, that it is considered that
unlikely that the market can deliver systems that in a competition can clearly document better overall
climate and environmental effect.
Vestre Toten ́s assessment is therefore that in order to reduce the climate and environmental impact of this procurement
the exclusion provisions in the Public Procurement Regulations §7-9 (4), as it is clear that the use of climate and environmental requirements has a better
climate and environmental effect than the use of award criteria as described in PPR § 7-9 (2).
Kvalitetskriterium (vekting): 0
Tittel
Identifikasjonsnummer for delkontrakt: LOT-0001
Prosedyre Prosedyretype
Åpen anbudskonkurranse ✅
Rettslig grunnlag: Direktiv 2014/24/EU
Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2026-05-29 12:00:00.000 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: engelsk 🗣️
norsk 🗣️
Minste tidsramme som tilbyderen må opprettholde tilbudet i: 3 måneder Anbudsvilkår
Elektronisk fakturering: Påkrevd
Elektronisk bestilling vil bli brukt ✅
Elektronisk betaling vil bli brukt ✅ Tildelingskriterier
Vekttype: Vekting (prosent, eksakt)
Anbudsvilkår
Kontrakten har gjennomføringsvilkår ✅
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Hovedfinansieringsvilkår og betalingsordninger og/eller henvisning til relevante bestemmelser som regulerer dem: N/A
Vilkår knyttet til kontrakten
Vilkår for kontraktoppfyllelse: N/A
Vilkår for deltakelse
Utestengelsesgrunn:
Akkord med kreditorer
Avtaler med andre økonomiske aktører som har til formål å vri konkurransen
Barnearbeid og andre former for menneskehandel
+ 23 til
Bedrageri
Brudd på forpliktelser fastsatt i nasjonale utelukkelsesgrunner
Brudd på forpliktelser på arbeidsrettens område
Brudd på forpliktelser på miljørettens område
Brudd på forpliktelser på sosialrettens område
Brudd på plikt til å betale skatter
Brudd på plikt til å betale trygdeavgifter
Brudd på yrkesetiske regler innen forsvarsanskaffelser
Deltakelse i en kriminell organisasjon
Direkte eller indirekte deltakelse i forberedelsen av denne anskaffelsen
Eiendeler under administrasjon av bobestyrer
Forretningsvirksomheten er suspendert
Grov yrkesfeil
Hvitvasking eller terrorfinansiering
Insolvens
Interessekonflikt på grunn av deltakelse i anskaffelsesprosedyren
Konkurs
Korrupsjon
Manglende pålitelighet som utgjør risiko for nasjonal sikkerhet
Terrorhandlinger eller handlinger knyttet til terrorvirksomhet
Tidlig oppsigelse, erstatning eller andre tilsvarende sanksjoner
Tilsvarende situasjon som konkurs, insolvens eller akkord etter nasjonal rett
Uriktige opplysninger, tilbakeholdt informasjon, manglende evne til å fremlegge nødvendige dokumenter, eller å ha skaffet seg fortrolige opplysninger om denne anskaffelsesprosedyren
Beskrivelse av utelukkelsesgrunner:
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, in the event a enforceable verdict has been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, Involving European Communities or European Union Member States (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, in the event a enforceable verdict has been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, Involving European Communities or European Union Member States (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier.
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted verdict of participation in a criminal organisation by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Participation in a criminal organisation as defined in Article 2 of the Council ́s framework decision 2008/841/RIA of 24 October 2008 on combating organised crime (EUT L 300 of 11.11.2008, p. 42).
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted verdict of participation in a criminal organisation by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Participation in a criminal organisation as defined in Article 2 of the Council ́s framework decision 2008/841/RIA of 24 October 2008 on combating organised crime (EUT L 300 of 11.11.2008, p. 42).
Has the tenderer entered into agreement(s) with other tenderers with the intention of turning the competition?
Is the tenderer aware of breaches of environmental provisions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies,…
… in the event a legal verdict has been convicted of money laundering or financing terrorism by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Money laundering or financing terrorism As defined in Article 1 of the European Parliament and Council Directive 2005/60/EF of 26 October 2005 on preventive measures against the use of the financial system for money laundering and financing terrorism (EUT L 309 of 25.11.2005, p. 15).
… at the time a legally convicted of fraud has been convicted of fraud by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Fraud included in Article 1 of the Convention on protection of the Financial Interests of the European Communities (EFT C 316 of 27.11.1995, p. 48).
… in the event a legal verdict has been convicted of child labour and other forms of human trafficking by a verdict handed down no more than five years ago, or a rejection period determined directly in the judgement that still applies? Child labour and other forms of human trafficking as defined in Article 2 of the European Parliament and council directive 2011/36/EU of 5. 1 April 2011 on the prevention and control of human trafficking and the protection of its victims and for compensation of the Council ́s framework decision 2002/629/RIA (EUT L 101 of 15.4.2011, p. 1).
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Is the tenderer aware of breaches of provisions on working conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Has the tenderer: a) given grossly incorrect information with the notification of the information required to verify that there is no basis for rejection, or of the qualification requirements being fulfilled, b) failed to provide such information, c) made reservations immediately to present the supporting documents requested by the contracting authority, or d) improperly affected the contracting authority ́s decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award?
Has the tenderer: a) given grossly incorrect information with the notification of the information required to verify that there is no basis for rejection, or of the qualification requirements being fulfilled, b) failed to provide such information, c) made reservations immediately to present the supporting documents requested by the contracting authority, or d) improperly affected the contracting authority ́s decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award?
Is the tenderer aware of a conflict of interest as stated in national law, the relevant notice or procurement documents?
Has the tenderer or an entity associated with the supplier advised the contracting authority or in another way been involved in the planning of the competition?
Has the tenderer committed serious errors in professional practice? If relevant, see the definitions in national law, the relevant notice or procurement documents.
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
Is the tenderer aware of breaches of provisions on social conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Have tenderers failed to fulfil all their social security obligations in the country where they are established and in their member state, if this is a different country than what he is established in?
Has the tenderer not fulfilled all of his tax and duty obligations in both the country where he is established and in the contracting authority's member state, if this is a different country than what he is established in?
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies,…
… in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.
… have been legally convicted of offences regarding professional behaviour in defence procurements?
Is the tenderer assessed to lack reliability that is necessary to exclude the risk of national security?
The contracting authority shall state that in Norway there are national rejection reasons. These shall be described in the procurement documents. Tenderers must respond to whether they are in one or more of the situations described in the national rejection reasons.
The contracting authority shall state that in Norway there are national rejection reasons. These shall be described in the procurement documents. Tenderers must respond to whether they are in one or more of the situations described in the national rejection reasons.
Oppdragsgiver Navn og adresser
Navn: Vestre Toten Kommune
Nasjonalt registreringsnummer: 971028300
Postadresse: Postboks 84
Postnummer: 2830
Poststed: Vestre Toten
Region: Innlandet
🏙️
Land: Norge 🇳🇴
Kontaktpunkt: Andreas Skjærbekk
E-post: post@vestre-toten.kommune.no📧
Telefon: +47 61153300📞
URL: https://vestre-toten.kommune.no🌏
Adresse til kjøperprofilen: https://vestre-toten.kommune.no🌏 Type oppdragsgiver
Offentligrettslig organ
Hovedaktivitet
Alminnelige offentlige tjenester
Kommunikasjon
Deltakelses-URL: https://app.artifik.no/procurements/4813🌏
Navn: e-Tendering
Tilgang til konkurransegrunnlaget er begrenset
Elektronisk innsending: Påkrevd
Startdato: 2026-08-15 📅
Sluttdato: 2028-09-30 📅
Utfyllende informasjon Klageinstans
Navn: Vestoppland og Valdres tingrett
Nasjonalt registreringsnummer: 926723758
Postadresse: Postboks 69
Postnummer: 2801
Poststed: Gjøvik
Region: Innlandet
🏙️
Land: Norge 🇳🇴
E-post: vestre.innlandet.tingrett@domstol.no📧
Telefon: +47 61020200📞
URL: https://www.domstol.no/no/domstoler/tingrett/vestoppland-og-valdres-tingrett/🌏 Tjeneste hvor informasjon om klageprosedyren kan innhentes Samme som: Navn og adresser Informasjon om elektroniske arbeidsflyter
Elektronisk fakturering vil bli akseptert
Kilde: OJS 2026/S 062-214774 (2026-03-27)
Kunngjøring av konkurranse (2026-04-13) Gjenstand Beskrivelse
Intern identifikator: 6440
Formål med strategisk innkjøp: Reduksjon av miljøpåvirkning
Reduction of environmental impact
Prosedyre Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2026-06-05 12:00:00.000 📅
Endringer Tekst som skal korrigeres i den opprinnelige kunngjøringen
Identifikasjonsnummer for delkontrakt: LOT-0001 Annen tilleggsinformasjon
The deadline for submitting tenders is updated the Contracting Authority has uploaded a new version of "Part I Annex 2.1a (price comparison)". The first version contained information that resisted the point on price changes in the contract documentation.
The deadline for submitting tenders is updated the Contracting Authority has uploaded a new version of "Part I Annex 2.1a (price comparison)". The first version contained information that resisted the point on price changes in the contract documentation.
Hovedårsak til endring: Rettelse fra oppdragsgiver
Informasjon om endringer
Identifikator for endret kunngjøringsversjon: 302f7b1d-ddfa-48f4-8116-c6af1f613f0c-01
Kilde: OJS 2026/S 072-251106 (2026-04-13)