The framework agreement shall cover fire alarm systems (including alarm organisation) and emergency lighting and escape route guidance systems in connection with urgent remedial works, planned maintenance works and minor rehabilitation projects. Properties may be added to or removed from the framework agreement during the contract period. Reasons for this may include new construction, rehabilitation and demolition. New systems added to the framework agreement shall be subject to the same terms and conditions. Framework agreement suppliers will be assigned a fixed portfolio. However, this may be adjusted in response to changes in the needs of both the contracting authority and the supplier.
Frist
Fristen for mottak av tilbud var 2026-10-31.
Anskaffelsen ble publisert 2026-09-28.
Kunngjøring av konkurranse (2026-09-28) Gjenstand Anskaffelsens omfang
Tittel: Fire alarm, emergency and escape route lighting systems (maintenance)
Referansenummer: 9359
Kort beskrivelse:
The framework agreement shall cover fire alarm systems (including alarm organisation) and emergency lighting and escape route guidance systems in connection with urgent remedial works, planned maintenance works and minor rehabilitation projects.
Properties may be added to or removed from the framework agreement during the contract period. Reasons for this may include new construction, rehabilitation and demolition. New systems added to the framework agreement shall be subject to the same terms and conditions.
Framework agreement suppliers will be assigned a fixed portfolio. However, this may be adjusted in response to changes in the needs of both the contracting authority and the supplier.
The framework agreement shall cover fire alarm systems (including alarm organisation) and emergency lighting and escape route guidance systems in connection with urgent remedial works, planned maintenance works and minor rehabilitation projects.
Properties may be added to or removed from the framework agreement during the contract period. Reasons for this may include new construction, rehabilitation and demolition. New systems added to the framework agreement shall be subject to the same terms and conditions.
Framework agreement suppliers will be assigned a fixed portfolio. However, this may be adjusted in response to changes in the needs of both the contracting authority and the supplier.
Kontrakttype: Bygge- og anleggsarbeid
Produkter/tjenester: Installasjon av brann- og tyverialarmer samt antenneanlegg📦
Estimert verdi eksklusive mva: 400 000 000 NOK 💰
Beskrivelse
Intern identifikator: 12224
Tilleggsprodukter/-tjenester:
Formål med strategisk innkjøp: Reduksjon av miljøpåvirkning
Reduction of environmental impact
Land: Norge 🇳🇴
Utførelsessted: Oslo
🏙️
Varighet: 48 måneder Tildelingskriterier
Pris ✅
Pris (vekting): 40
Kvalitetskriterium (navn): Understanding of the assignment
Kvalitetskriterium (vekting): 60
Kvalitetskriterium (navn): Pursuant to Section 5b of the Norwegian Public Procurement Act, award criteria relating to the environment may be replaced or combined with climate and environmental requirements where this results in a better climate and environmental impact.
The framework agreement primarily covers maintenance of fire alarm systems. The performance of such assignments involves significant transport activity, and it has been assessed that this constitutes by far the largest source of environmental impact associated with the agreement. In order to reduce these emissions, Oslo Municipality's standard contractual requirements for transport have been applied, requiring suppliers to use zero-emission vehicles when carrying out all contract works.
By establishing the use of zero-emission vehicles as a binding contractual requirement, rather than using it as an award criterion, it is ensured that all suppliers entering into the framework agreement actually operate using zero-emission vehicles. A model in which the proportion of a supplier's zero-emission vehicle fleet is rewarded in the evaluation would not provide the same guarantee, as suppliers with partially fossil-fuel-powered vehicle fleets could still be awarded a contract.
This approach therefore contributes to minimising the framework agreement's main source of emissions in a more effective and predictable manner. On this basis, it is considered that including the environmental requirement as a contractual requirement rather than as an award criterion provides a better environmental impact.
Kvalitetskriterium (vekting): 0
Tittel
Identifikasjonsnummer for delkontrakt: LOT-0001
Prosedyre Prosedyretype
Åpen anbudskonkurranse ✅
Rettslig grunnlag: Direktiv 2014/24/EU
Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2026-10-31 22:59:00.000 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Minste tidsramme som tilbyderen må opprettholde tilbudet i: 3 måneder Informasjon om en rammeavtale eller en dynamisk innkjøpsordning
Rammeavtale med flere leverandører ✅
Maksimalt antall deltakere: 6
Anbudsvilkår
Elektronisk fakturering: Påkrevd
Elektronisk bestilling vil bli brukt ✅
Elektronisk betaling vil bli brukt ✅ Tildelingskriterier
Vekttype: Vekting (prosent, eksakt)
Anbudsvilkår
Kontrakten har gjennomføringsvilkår ✅
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Utvalgskriterium: Innmelding i et relevant fagregister
Liste og kort beskrivelse av regler og kriterier:
Requirements relating to the supplier's registration, authorisations, etc.
The supplier shall be a legally established business.
Documentation requirements:
Norwegian companies: Certificate of Registration.
Foreign companies: Documentation confirming that the company is registered in a business register or company register as required by the legislation of the country in which the supplier is established.:…
… Requirements relating to the supplier's registration, authorisations, etc.
The supplier shall be a legally established business.
Documentation requirements:
Norwegian companies: Certificate of Registration.
Foreign companies: Documentation confirming that the company is registered in a business register or company register as required by the legislation of the country in which the supplier is established.
… The supplier shall be registered in the Electrical Undertakings Register (Elvirksomhetsregisteret).
Documentation requirements:
The contracting authority will verify the registration and status in the Electrical Undertakings Register. The supplier may additionally attach an extract from the Electrical Undertakings Register as documentation.
Utvalgskriterium: Attester fra kvalitetskontrollinstitutter
Liste og kort beskrivelse av regler og kriterier:
Requirements relating to the supplier's technical and professional qualifications.: The supplier shall have at least five personnel with valid FG-750 certification for automatic fire alarm systems.
Documentation requirements:
Valid FG-750 certificates for the personnel, showing their validity.
Requirements relating to the supplier's technical and professional qualifications.: The supplier shall have at least five personnel with valid FG-750 certification for automatic fire alarm systems.
Documentation requirements:
Valid FG-750 certificates for the personnel, showing their validity.
Requirements relating to the supplier's registration, authorisations, etc.
The supplier shall be a legally established business.
Documentation requirements:
Norwegian companies: Certificate of Registration.
Foreign companies: Documentation confirming that the company is registered in a business register or company register as required by the legislation of the country in which the supplier is established.: The supplier shall be a validly certified company under FG-760.
Documentation requirements:
Valid FG certificate for the company.
Requirements relating to the supplier's registration, authorisations, etc.
The supplier shall be a legally established business.
Documentation requirements:
Norwegian companies: Certificate of Registration.
Foreign companies: Documentation confirming that the company is registered in a business register or company register as required by the legislation of the country in which the supplier is established.: The supplier shall be a validly certified company under FG-760.
Documentation requirements:
Valid FG certificate for the company.
Utvalgskriterium: Andre økonomiske eller finansielle krav
Liste og kort beskrivelse av regler og kriterier:
Requirements relating to the supplier's economic and financial capacity.
The supplier shall have sufficient financial capacity to perform the assignment.
Documentation requirements:
The contracting authority will obtain a credit rating based on the latest available financial statements.
The contracting authority reserves the right to request annual accounts or other documentation if necessary to assess the requirement.
The supplier may submit any documentation it considers relevant to the assessment of its financial capacity.: Requirements relating to the supplier's economic and financial capacity.
The supplier shall have sufficient financial capacity to perform the assignment.
Documentation requirements:
The contracting authority will obtain a credit rating based on the latest available financial statements.
The contracting authority reserves the right to request annual accounts or other documentation if necessary to assess the requirement.
The supplier may submit any documentation it considers relevant to the assessment of its financial capacity.
Requirements relating to the supplier's economic and financial capacity.
The supplier shall have sufficient financial capacity to perform the assignment.
Documentation requirements:
The contracting authority will obtain a credit rating based on the latest available financial statements.
The contracting authority reserves the right to request annual accounts or other documentation if necessary to assess the requirement.
The supplier may submit any documentation it considers relevant to the assessment of its financial capacity.: Requirements relating to the supplier's economic and financial capacity.
The supplier shall have sufficient financial capacity to perform the assignment.
Documentation requirements:
The contracting authority will obtain a credit rating based on the latest available financial statements.
The contracting authority reserves the right to request annual accounts or other documentation if necessary to assess the requirement.
The supplier may submit any documentation it considers relevant to the assessment of its financial capacity.
Requirements relating to the supplier's registration, authorisations, etc.
The supplier shall be a legally established business.
Documentation requirements:
Norwegian companies: Certificate of Registration.
Foreign companies: Documentation confirming that the company is registered in a business register or company register as required by the legislation of the country in which the supplier is established.: The supplier shall be authorised by the Norwegian Communications Authority (Nkom).
Documentation requirements:
The contracting authority will verify the registration and status with Nkom. The supplier may additionally attach an extract from Nkom as documentation.
Requirements relating to the supplier's registration, authorisations, etc.
The supplier shall be a legally established business.
Documentation requirements:
Norwegian companies: Certificate of Registration.
Foreign companies: Documentation confirming that the company is registered in a business register or company register as required by the legislation of the country in which the supplier is established.: The supplier shall be authorised by the Norwegian Communications Authority (Nkom).
Documentation requirements:
The contracting authority will verify the registration and status with Nkom. The supplier may additionally attach an extract from Nkom as documentation.
Requirements relating to the supplier's technical and professional qualifications.: When designing and carrying out the works, the supplier shall be able to document the competence required to declare and fulfil statutory responsibility for all risk classes and fire classes specified in the applicable building regulations (currently TEK17), Section 11-2, Risk Classes, and Section 11-3, Fire Classes.
Documentation requirements:
* The supplier's description of its competence to declare and fulfil statutory responsibility for all risk classes and fire classes specified in the applicable building regulations (currently TEK17), Sections 11-2 and 11-3; or
* Approval certificate issued by the Norwegian Building Authority (DiBK).
Requirements relating to the supplier's technical and professional qualifications.: When designing and carrying out the works, the supplier shall be able to document the competence required to declare and fulfil statutory responsibility for all risk classes and fire classes specified in the applicable building regulations (currently TEK17), Section 11-2, Risk Classes, and Section 11-3, Fire Classes.
Documentation requirements:
* The supplier's description of its competence to declare and fulfil statutory responsibility for all risk classes and fire classes specified in the applicable building regulations (currently TEK17), Sections 11-2 and 11-3; or
* Approval certificate issued by the Norwegian Building Authority (DiBK).
Utvalgskriterium: Referanser på spesifiserte tjenester
Liste og kort beskrivelse av regler og kriterier:
Requirements relating to the supplier's technical and professional qualifications.: The supplier shall have competence and experience from assignments of comparable complexity.
Documentation requirements:
Description of the supplier's three most relevant assignments carried out during the last five years. The description must include the value of the assignment, date/time period, recipient/client and relevant experience gained. It is the supplier's responsibility to document the relevance through the description.
The reference form shall be used.
The contracting authority reserves the right to contact the references provided.
Requirements relating to the supplier's technical and professional qualifications.: The supplier shall have competence and experience from assignments of comparable complexity.
Documentation requirements:
Description of the supplier's three most relevant assignments carried out during the last five years. The description must include the value of the assignment, date/time period, recipient/client and relevant experience gained. It is the supplier's responsibility to document the relevance through the description.
The reference form shall be used.
The contracting authority reserves the right to contact the references provided.
Utvalgskriterium: Teknikere eller tekniske organer som skal utføre arbeidet
Liste og kort beskrivelse av regler og kriterier:
Requirements relating to the supplier's technical and professional qualifications.: The supplier shall have sufficient capacity to handle ongoing assignments under the framework agreement.
Documentation requirements:
Completed competence matrix.
Utvalgskriterium: Tiltak for å sikre kvalitet
Liste og kort beskrivelse av regler og kriterier:
Requirements relating to the supplier's technical and professional qualifications.: The supplier shall have a satisfactory quality assurance system.
Documentation requirements:
The supplier's description of its quality assurance system.
or
Certificate for the supplier's quality assurance system issued by independent bodies confirming that the supplier complies with certain quality standards, e.g. ISO 9001:2015.
Requirements relating to the supplier's technical and professional qualifications.: The supplier shall have a satisfactory quality assurance system.
Documentation requirements:
The supplier's description of its quality assurance system.
or
Certificate for the supplier's quality assurance system issued by independent bodies confirming that the supplier complies with certain quality standards, e.g. ISO 9001:2015.
Utvalgskriterium: Tiltak for miljøstyring
Liste og kort beskrivelse av regler og kriterier:
Requirements relating to the supplier's technical and professional qualifications.: The supplier shall have a satisfactory environmental management system.
Documentation requirements:
The supplier's description of its environmental management system.
or
Certificate for the supplier's environmental management system or environmental management standards issued by independent bodies, e.g. ISO 14001, Eco-Lighthouse (Miljøfyrtårn) or EMAS.
Requirements relating to the supplier's technical and professional qualifications.: The supplier shall have a satisfactory environmental management system.
Documentation requirements:
The supplier's description of its environmental management system.
or
Certificate for the supplier's environmental management system or environmental management standards issued by independent bodies, e.g. ISO 14001, Eco-Lighthouse (Miljøfyrtårn) or EMAS.
Hovedfinansieringsvilkår og betalingsordninger og/eller henvisning til relevante bestemmelser som regulerer dem: N/A
Vilkår knyttet til kontrakten
Vilkår for kontraktoppfyllelse: N/A
Vilkår for deltakelse
Utestengelsesgrunn:
Akkord med kreditorer
Avtaler med andre økonomiske aktører som har til formål å vri konkurransen
Barnearbeid og andre former for menneskehandel
+ 23 til
Bedrageri
Brudd på forpliktelser fastsatt i nasjonale utelukkelsesgrunner
Brudd på forpliktelser på arbeidsrettens område
Brudd på forpliktelser på miljørettens område
Brudd på forpliktelser på sosialrettens område
Brudd på plikt til å betale skatter
Brudd på plikt til å betale trygdeavgifter
Brudd på yrkesetiske regler innen forsvarsanskaffelser
Deltakelse i en kriminell organisasjon
Direkte eller indirekte deltakelse i forberedelsen av denne anskaffelsen
Eiendeler under administrasjon av bobestyrer
Forretningsvirksomheten er suspendert
Grov yrkesfeil
Hvitvasking eller terrorfinansiering
Insolvens
Interessekonflikt på grunn av deltakelse i anskaffelsesprosedyren
Konkurs
Korrupsjon
Manglende pålitelighet som utgjør risiko for nasjonal sikkerhet
Terrorhandlinger eller handlinger knyttet til terrorvirksomhet
Tidlig oppsigelse, erstatning eller andre tilsvarende sanksjoner
Tilsvarende situasjon som konkurs, insolvens eller akkord etter nasjonal rett
Uriktige opplysninger, tilbakeholdt informasjon, manglende evne til å fremlegge nødvendige dokumenter, eller å ha skaffet seg fortrolige opplysninger om denne anskaffelsesprosedyren
Beskrivelse av utelukkelsesgrunner:
Is the economic operator in a situation of bankruptcy? Please indicate why the economic operator is nevertheless able to perform the contract, taking into account the applicable national rules and measures concerning the continuation of business activities under these circumstances. It is not necessary to provide this information if the exclusion of economic operators in such situations is mandatory under applicable national law without any possibility of derogation, where the economic operator is nevertheless able to perform the contract.
Is the economic operator in a situation of bankruptcy? Please indicate why the economic operator is nevertheless able to perform the contract, taking into account the applicable national rules and measures concerning the continuation of business activities under these circumstances. It is not necessary to provide this information if the exclusion of economic operators in such situations is mandatory under applicable national law without any possibility of derogation, where the economic operator is nevertheless able to perform the contract.
Has the economic operator itself, or any person who is a member of the economic operator's administrative, management or supervisory body, or who has powers of representation, decision or control within those bodies, been convicted by a final judgment of corruption by a judgment rendered no more than five years ago, or has an exclusion period established directly in the judgment that continues to apply?
Corruption as defined in Article 3 of the Convention on the fight against corruption involving officials of the European Communities or officials of Member States of the European Union (OJ C 195, 25.6.1997, p. 1), and Article 2(1) of Council Framework Decision 2003/568/JHA of 22 July 2003 on combating corruption in the private sector (OJ L 192, 31.7.2003, p. 54). This ground for exclusion also covers corruption as defined in the national law of the contracting authority or the economic operator.
Has the economic operator itself, or any person who is a member of the economic operator's administrative, management or supervisory body, or who has powers of representation, decision or control within those bodies, been convicted by a final judgment of corruption by a judgment rendered no more than five years ago, or has an exclusion period established directly in the judgment that continues to apply?
Corruption as defined in Article 3 of the Convention on the fight against corruption involving officials of the European Communities or officials of Member States of the European Union (OJ C 195, 25.6.1997, p. 1), and Article 2(1) of Council Framework Decision 2003/568/JHA of 22 July 2003 on combating corruption in the private sector (OJ L 192, 31.7.2003, p. 54). This ground for exclusion also covers corruption as defined in the national law of the contracting authority or the economic operator.
Is the economic operator in a situation of having entered into a compulsory arrangement with creditors? Please indicate why the economic operator is nevertheless able to perform the contract, taking into account the applicable national rules and measures concerning the continuation of business activities under these circumstances. It is not necessary to provide this information if the exclusion of economic operators in such situations is mandatory under applicable national law without any possibility of derogation, where the economic operator is nevertheless able to perform the contract.
Is the economic operator in a situation of having entered into a compulsory arrangement with creditors? Please indicate why the economic operator is nevertheless able to perform the contract, taking into account the applicable national rules and measures concerning the continuation of business activities under these circumstances. It is not necessary to provide this information if the exclusion of economic operators in such situations is mandatory under applicable national law without any possibility of derogation, where the economic operator is nevertheless able to perform the contract.
Has the economic operator itself, or any person who is a member of the economic operator's administrative, management or supervisory body, or who has powers of representation, decision or control within those bodies, been convicted by a final judgment of participation in a criminal organisation by a judgment rendered no more than five years ago, or has an exclusion period established directly in the judgment that continues to apply?
Participation in a criminal organisation as defined in Article 2 of Council Framework Decision 2008/841/JHA of 24 October 2008 on the fight against organised crime (OJ L 300, 11.11.2008, p. 42).
Has the economic operator itself, or any person who is a member of the economic operator's administrative, management or supervisory body, or who has powers of representation, decision or control within those bodies, been convicted by a final judgment of participation in a criminal organisation by a judgment rendered no more than five years ago, or has an exclusion period established directly in the judgment that continues to apply?
Participation in a criminal organisation as defined in Article 2 of Council Framework Decision 2008/841/JHA of 24 October 2008 on the fight against organised crime (OJ L 300, 11.11.2008, p. 42).
Has the economic operator entered into agreements with other economic operators aimed at distorting competition?
Is the economic operator aware of any breach of obligations in the field of environmental law, as referred to in national law, the relevant notice or procurement documents, or Article 18(2) of Directive 2014/24/EU?
Has the economic operator itself, or any person who is a member of the economic operator's administrative, management or supervisory body, or who has powers of representation, decision or control within those bodies, been convicted by a final judgment of…
… money laundering or terrorist financing by a judgment rendered no more than five years ago, or has an exclusion period established directly in the judgment that continues to apply?
Money laundering or terrorist financing as defined in Article 1 of Directive 2005/60/EC of the European Parliament and of the Council of 26 October 2005 on the prevention of the use of the financial system for the purpose of money laundering and terrorist financing (OJ L 309, 25.11.2005, p. 15).
… fraud by a judgment rendered no more than five years ago, or has an exclusion period established directly in the judgment that continues to apply?
Fraud as referred to in Article 1 of the Convention on the protection of the European Communities' financial interests (OJ C 316, 27.11.1995, p. 48).
… child labour and other forms of trafficking in human beings by a judgment rendered no more than five years ago, or has an exclusion period established directly in the judgment that continues to apply?
Child labour and other forms of trafficking in human beings as defined in Article 2 of Directive 2011/36/EU of the European Parliament and of the Council of 5 April 2011 on preventing and combating trafficking in human beings and protecting its victims, and replacing Council Framework Decision 2002/629/JHA (OJ L 101, 15.4.2011, p. 1).
Is the economic operator in an insolvency situation? Please indicate why the economic operator is nevertheless able to perform the contract, taking into account the applicable national rules and measures concerning the continuation of business activities under these circumstances. It is not necessary to provide this information if the exclusion of economic operators in such situations is mandatory under applicable national law without any possibility of derogation, where the economic operator is nevertheless able to perform the contract.
Is the economic operator in an insolvency situation? Please indicate why the economic operator is nevertheless able to perform the contract, taking into account the applicable national rules and measures concerning the continuation of business activities under these circumstances. It is not necessary to provide this information if the exclusion of economic operators in such situations is mandatory under applicable national law without any possibility of derogation, where the economic operator is nevertheless able to perform the contract.
Please indicate why the economic operator is nevertheless able to perform the contract under the circumstances referred to above, taking into account the applicable national rules and measures concerning the continuation of business activities. It is not necessary to provide this information if the exclusion of economic operators in such situations is mandatory under applicable national law without any possibility of derogation, where the economic operator is nevertheless able to perform the contract.
Please indicate why the economic operator is nevertheless able to perform the contract under the circumstances referred to above, taking into account the applicable national rules and measures concerning the continuation of business activities. It is not necessary to provide this information if the exclusion of economic operators in such situations is mandatory under applicable national law without any possibility of derogation, where the economic operator is nevertheless able to perform the contract.
Has the economic operator:
a) provided seriously misleading information when communicating the information required for verification of the absence of grounds for exclusion or the fulfilment of the selection criteria;
b) withheld such information;
c) been unable to submit, without delay, the supporting documents required by the contracting authority; or
d) improperly influenced the contracting authority's decision-making process in order to obtain confidential information that may give the economic operator an undue advantage in the procurement procedure, or negligently provided misleading information that may have a material influence on decisions concerning exclusion, selection or award?
a) provided seriously misleading information when communicating the information required for verification of the absence of grounds for exclusion or the fulfilment of the selection criteria;
b) withheld such information;
c) been unable to submit, without delay, the supporting documents required by the contracting authority; or
d) improperly influenced the contracting authority's decision-making process in order to obtain confidential information that may give the economic operator an undue advantage in the procurement procedure, or negligently provided misleading information that may have a material influence on decisions concerning exclusion, selection or award?
Is the economic operator aware of any conflict of interest as referred to in national law, the relevant notice or procurement documents?
Has the economic operator, or an undertaking related to the economic operator, provided advice to the contracting authority or otherwise been involved in the preparation of the procurement procedure?
Has the economic operator been guilty of grave professional misconduct? Where applicable, please see the definitions in national law, the relevant notice or procurement documents.
Has the economic operator experienced significant or persistent deficiencies in the performance of a substantive requirement under a previous public contract, a previous contract with a contracting authority or a previous concession contract, where such deficiencies have led to termination of that contract, damages or other comparable sanctions?
Has the economic operator experienced significant or persistent deficiencies in the performance of a substantive requirement under a previous public contract, a previous contract with a contracting authority or a previous concession contract, where such deficiencies have led to termination of that contract, damages or other comparable sanctions?
Is the economic operator aware of any breach of obligations in the field of social law, as referred to in national law, the relevant notice or procurement documents, or Article 18(2) of Directive 2014/24/EU?
Has the economic operator failed to fulfil all its obligations relating to the payment of…
… social security contributions, both in the country in which it is established and in the contracting authority's Member State, if different from the country of establishment?
… taxes and duties, both in the country in which it is established and in the contracting authority's Member State, if different from the country of establishment?
Has the economic operator itself, or any person who is a member of the economic operator's administrative, management or supervisory body, or who has powers of representation, decision or control within those bodies, been convicted by a final judgment of…
… terrorist offences or offences linked to terrorist activities by a judgment rendered no more than five years ago, or has an exclusion period established directly in the judgment that continues to apply?
Terrorist offences or offences linked to terrorist activities as defined in Articles 1 and 3 of Council Framework Decision 2002/475/JHA of 13 June 2002 on combating terrorism (OJ L 164, 22.6.2002, p. 3). This ground for exclusion also covers inciting, aiding or abetting, or attempting to commit such offences as referred to in Article 4 of that Framework Decision.
… an offence concerning professional conduct in the field of defence procurement?
Has the economic operator been assessed as lacking the reliability necessary to exclude risks to national security?
The contracting authority shall indicate that national grounds for exclusion apply in Norway. These shall be described in the procurement documents. The economic operator must state whether it is in one or more of the situations described under the national grounds for exclusion.
The contracting authority shall indicate that national grounds for exclusion apply in Norway. These shall be described in the procurement documents. The economic operator must state whether it is in one or more of the situations described under the national grounds for exclusion.
Utfyllende informasjon Klageinstans
Navn: Oslo District Court
Nasjonalt registreringsnummer: 926725939
Postadresse: Postboks 2106 Vika
Postnummer: 0125
Poststed: Oslo
Region: Oslo
🏙️
Land: Norge 🇳🇴
E-post: oslo.tingrett@domstol.no📧
Telefon: +47 22035200📞
URL: https://www.domstol.no/no/domstoler/tingrett/oslo-tingrett/🌏 Tjeneste hvor informasjon om klageprosedyren kan innhentes Samme som: Navn og adresser Informasjon om elektroniske arbeidsflyter
Elektronisk fakturering vil bli akseptert
Kilde: OJS 2026/S 189-672559 (2026-09-28)
Kunngjøring av konkurranse (2026-10-27) Gjenstand Anskaffelsens omfang
Tittel: Fire alarms, emergency and guiding lighting systems (maintenance).
Kort beskrivelse:
The framework agreement shall cover fire alarm systems (including alarm organisation) and emergency lights and management systems for emergency improvement work, planned maintenance work and minor rehabilitation projects.
Properties can be added to or taken out of the framework agreement during the contract period, and the reason for this could be, for example, new buildings, renovations and demolition. New installations that come into the framework agreement shall have verbatim terms.
The framework agreement suppliers will be awarded a fixed portfolio. However, this can deviate from changed needs for both the Contracting Authority and the service provider.
The framework agreement shall cover fire alarm systems (including alarm organisation) and emergency lights and management systems for emergency improvement work, planned maintenance work and minor rehabilitation projects.
Properties can be added to or taken out of the framework agreement during the contract period, and the reason for this could be, for example, new buildings, renovations and demolition. New installations that come into the framework agreement shall have verbatim terms.
The framework agreement suppliers will be awarded a fixed portfolio. However, this can deviate from changed needs for both the Contracting Authority and the service provider.
Estimert verdi eksklusive mva: 400 000 000 NOK 💰
Beskrivelse
Intern identifikator: 13746 Tildelingskriterier
Kvalitetskriterium (navn): Assignment comprehension
It is in accordance with the Public Procurement Act §5b that the award criteria for the environment can be replaced or combined with climate and environmental requirements, if this gives a better climate and environmental effect.
The framework agreement mainly includes maintenance of fire alarm systems. The execution of such assignments involves significant transport activity, and it is considered that this is by far the largest source of environmental impact for this agreement. In order to reduce these emissions, Oslo municipality ́s standard contractual requirements for transport are used, which means that the tenderers are obliged to use emission-free vehicles when carrying out all contract works.
By establishing the use of zero emission vehicles as a binding contract requirement, rather than using it as the award criteria, it is ensured that all tenderers who enter into the framework agreement actually operate emission-free. A model awarded in the evaluation where the degree of emission-free vehicles will not be awarded the same guarantee, as suppliers with partially fossile vehicles could still be awarded a contract.
This approach thus contributes to minimising the framework agreement's main source of emissions in a more efficient and predictable way, and it is assessed on this basis that adopting the environment as a contractual requirement rather than as the award criterion provides better environmental effect.
Prosedyre Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2026-11-03 11:00:00.000 📅
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Liste og kort beskrivelse av regler og kriterier:
Requirements connected to the tenderer's registrations, authorisations, etc.:…
… The tenderer shall be a legally established company.
Documentation requirements:
Norwegian companies: Company Registration Certificate.
Foreign companies: Proof that the company is registered in a trade or business register as prescribed by the law of the country where the company is established.
… Tenderers shall be registered in the Electrical Enterprise Register.
Documentation requirements:
The Contracting Authority will check the registration and status in the Electrical Company Register. Tenderers can also enclose a printout from the Electrical Company Register as documentation.
Requirements connected to the tenderer's technical and professional qualifications.: Tenderers shall have at least five resources with valid FG-750 certification for automatic fire alarm systems.
Documentation requirements:
Valid FG 750 certificate for resources, demonstrating validity.
Requirements connected to the tenderer's technical and professional qualifications.: Tenderers shall have at least five resources with valid FG-750 certification for automatic fire alarm systems.
Documentation requirements:
Valid FG 750 certificate for resources, demonstrating validity.
Requirements connected to the tenderer's registrations, authorisations, etc.: The tenderer shall be a valid certified company in accordance with FG 760.
Documentation requirements:
Valid FG certificate for the company.
Requirements connected to the tenderer's registrations, authorisations, etc.: The tenderer shall be a valid certified company in accordance with FG 760.
Documentation requirements:
Valid FG certificate for the company.
Requirements connected to the tenderer's economic and financial capacity.: The tenderer must have the financial capacity to carry out the assignment.
Documentation requirements:
The contracting authority will obtain a credit rating based on the last known accounting figures.
The contracting authority reserves the right to obtain annual accounts or other documentation if this is necessary to evaluate the requirement.
Tenderers can submit all documentation that they believe is relevant for assessing their financial capacity.
Requirements connected to the tenderer's economic and financial capacity.: The tenderer must have the financial capacity to carry out the assignment.
Documentation requirements:
The contracting authority will obtain a credit rating based on the last known accounting figures.
The contracting authority reserves the right to obtain annual accounts or other documentation if this is necessary to evaluate the requirement.
Tenderers can submit all documentation that they believe is relevant for assessing their financial capacity.
Requirements connected to the tenderer's registrations, authorisations, etc.: The tenderer shall be authorised by the Norwegian Communications Authority (NKOM).
Documentation requirements:
The contracting authority will check the registration and status in NKOM. The tenderer can also enclose a printout from NKOM as documentation.
Requirements connected to the tenderer's registrations, authorisations, etc.: The tenderer shall be authorised by the Norwegian Communications Authority (NKOM).
Documentation requirements:
The contracting authority will check the registration and status in NKOM. The tenderer can also enclose a printout from NKOM as documentation.
Requirements connected to the tenderer's technical and professional qualifications.:…
… When engineering design and execution, the tenderer shall be able to document competence to declare and fulfil the right to accept responsibility for all risk classes and fire classes named in the current building engineering regulations (p.t. TEK 17) § 11-2, risk classes and § 11 3 fire classes.
Documentation requirements:
•The tenderer ́s description of competence in order to declare and fulfil the right to accept responsibility for all risk classes and fire classes named in the current building engineering regulations (currently TEK 17) § 11-2, risk classes and § 11-3 fire classes.
or
•Certificate of approval issued by the Agency for Building Quality (DiBK)
… Tenderers shall have competence and experience from assignments of comparable complexity.
Documentation requirements:
Description of the tenderer's three most relevant contracts in the course of the last 5 years. The description must include a statement of the contract ́s value, date, recipient and relevant experience acquired. It is the tenderer ́s responsibility to document relevance through the description.
The reference form shall be used.
The contracting authority reserves the right to contact the stated references.
… Tenderers shall have sufficient capacity to handle ongoing assignments under the framework agreement.
Documentation requirements:
Completed competence matrix.
… Tenderers shall have a satisfactory quality assurance system.
Documentation requirements:
The tenderer ́s description of the quality assurance system.
or
Certificate for the tenderer's quality assurance system issued by independent bodies which certify that the tenderer fulfils certain quality assurance standards, f.eks. ISO 9001:2015.
… Tenderers shall have a satisfactory environmental management system.
Documentation requirements:
The tenderer ́s description of the environmental management system.
or
Certificate for the tenderer's environmental management system or environmental management standards issued by independent bodies, f.eks. ISO 14001, Miljøfyrtårn ,EMAS.
Beskrivelse av utelukkelsesgrunner:
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, by enforceable judgement been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, involving European Communities or European Union member states (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, by enforceable judgement been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, involving European Communities or European Union member states (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier.
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted verdict of participation in a criminal organisation by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Participation in a criminal organisation as defined in Article 2 of the Council ́s framework decision 2008/841/RIA of 24 October 2008 on control of organised crime (EUT L 300 of 11.11.2008, p. 42).
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted verdict of participation in a criminal organisation by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Participation in a criminal organisation as defined in Article 2 of the Council ́s framework decision 2008/841/RIA of 24 October 2008 on control of organised crime (EUT L 300 of 11.11.2008, p. 42).
Has the tenderer entered into agreement(s) with other tenderers with the intention of turning the competition?
Is the tenderer aware of breaches of environmental provisions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies,…
… in the event a legal verdict has been convicted of money laundering or financing terrorism by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Money laundering or financing terrorism As defined in Article 1 of the European Parliament and Council Directive 2005/60/EF of 26 October 2005 on preventive measures against the use of the financial system for money laundering and financing terrorism (EUT L 309 of 25.11.2005, p. 15).
… at the time a legally convicted of fraud has been convicted of fraud by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Fraud included in Article 1 of the Convention on protection of the Financial Interests of the European Communities (EFT C 316 of 27.11.1995, p. 48).
… in the event a legal verdict has been convicted of child labour and other forms of human trafficking by a verdict handed down no more than five years ago, or a rejection period determined directly in the judgement that still applies? Child labour and other forms of human trafficking as defined in Article 2 of the European Parliament and council directive 2011/36/EU of 5. 1 April 2011 on the prevention and control of human trafficking and the protection of its victims and for compensation of the Council ́s framework decision 2002/629/RIA (EUT L 101 of 15.4.2011, p. 1).
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Is the tenderer aware of breaches of provisions on working conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract.
Has the tenderer: a) given grossly incorrect information with the notification of the information required to verify that there is no basis for rejection, or of the qualification requirements being fulfilled, b) failed to provide such information, c) made reservations immediately to present the supporting documents requested by the contracting authority, or d) improperly affected the contracting authority ́s decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award?
Has the tenderer: a) given grossly incorrect information with the notification of the information required to verify that there is no basis for rejection, or of the qualification requirements being fulfilled, b) failed to provide such information, c) made reservations immediately to present the supporting documents requested by the contracting authority, or d) improperly affected the contracting authority ́s decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award?
Is the tenderer aware of a conflict of interest as stated in national law, the relevant notice or procurement documents?
Has the tenderer or an entity associated with the supplier advised the contracting authority or in another way been involved in the planning of the competition?
Has the tenderer committed serious errors in professional practice? If relevant, see the definitions in national law, the relevant notice or procurement documents.
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
Is the tenderer aware of breaches of provisions on social conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Have tenderers failed to fulfil all their social security obligations in the country where they are established and in their member state, if this is a different country than what he is established in?
Has the tenderer not fulfilled all of his tax and duty obligations in both the country where he is established and in the contracting authority's member state, if this is a different country than what he is established in?
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies,…
… in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.
… have been legally convicted of offences regarding professional behaviour in defence procurements?
Is the tenderer assessed to lack the reliability necessary to exclude the risk of national security?
The contracting authority shall state that in Norway there are national rejection reasons. These shall be described in the procurement documents. Tenderers must respond to whether they are in one or more of the situations described in the national rejection reasons.
The contracting authority shall state that in Norway there are national rejection reasons. These shall be described in the procurement documents. Tenderers must respond to whether they are in one or more of the situations described in the national rejection reasons.
Oppdragsgiver Navn og adresser
Navn: Oslo kommune v/ Oslobygg KF
Utfyllende informasjon Klageinstans
Oslo tingrett
Tjeneste hvor informasjon om klageprosedyren kan innhentes
Oslo kommune v/ Oslobygg KF
Endringer Tekst som skal korrigeres i den opprinnelige kunngjøringen
Identifikasjonsnummer for delkontrakt: LOT-0001 Annen tilleggsinformasjon
The tender deadline has been postponed. The new tender deadline is 03.11.26, 12:00.