Main fire station located at Kringleskjæret shall be established on a partially completed sea filling and fulfilled area, with associated roads. E 5 is responsible for the execution of all electro and automation work. It must be followed-up with system control in the entire construction phase and be the technical construction manager ́s point of contact in order to achieve good coordination and result. The main station is defined as a society critical building and a backup power installation shall be prepared, located externally by building 2.
Frist
Fristen for mottak av tilbud var 2026-01-22.
Anskaffelsen ble publisert 2025-12-14.
Kunngjøring av konkurranse (2025-12-14) Gjenstand Anskaffelsens omfang
Tittel: Main fire station Florø – E5 Electro and automation
Referansenummer: 25/12025
Kort beskrivelse:
“Main fire station located at Kringleskjæret shall be established on a partially completed sea filling and fulfilled area, with associated roads. E 5 is...”
Kort beskrivelse
Main fire station located at Kringleskjæret shall be established on a partially completed sea filling and fulfilled area, with associated roads. E 5 is responsible for the execution of all electro and automation work. It must be followed-up with system control in the entire construction phase and be the technical construction manager ́s point of contact in order to achieve good coordination and result. The main station is defined as a society critical building and a backup power installation shall be prepared, located externally by building 2.
Vis mer
Kontrakttype: Bygge- og anleggsarbeid
Produkter/tjenester: Elektroteknisk installasjonsarbeid📦
Estimert verdi eksklusive mva: 8 000 000 NOK 💰
Beskrivelse
Beskrivelse av anskaffelsen:
“Main fire station located at Kringleskjæret shall be established on a partially completed sea filling and fulfilled area, with associated roads. E 5 is...”
Beskrivelse av anskaffelsen
Main fire station located at Kringleskjæret shall be established on a partially completed sea filling and fulfilled area, with associated roads. E 5 is responsible for the execution of all electro and automation work. It must be followed-up with system control in the entire construction phase and be the technical construction manager ́s point of contact in order to achieve good coordination and result. The main station is defined as a society critical building and a backup power installation shall be prepared, located externally by building 2.
Prosedyre Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2026-01-22 11:00:00 📅