The contracting authority shall enter into parallel framework agreements for independent inspection assignments. The framework agreements shall cover all inspection areas that are always in accordanc with applicable laws and regulations, including the Planning and Building Act ́s (PBL) chapter 24. Independent inspections shall be carried out in accordance with the Building Application Regulations (SAK10) § 14 Development class 1: - Humidity assurance of application obliged wet rooms in residences. - Air tightness in new houses Development classes 2 and 3: - Building physics - Structural safety Geotechniques - Fire safety The contracting authority intends to enter into a contract with three tenderers. The framework agreement has an upper economic limit of NOK 6.5 million per annum. The framework agreement does not involve any purchasing obligation. The contracting authority emphasises that the figures are estimates and that the actual volume can vary from year to year. Call-offs will take place as and when the contracting authority's needs materialise. Tenderers must be aware that changes in the economic and/or political framework terms can lead to the estimated number of assignments being increased/reduced.
Frist
Fristen for mottak av tilbud var 2025-12-05.
Anskaffelsen ble publisert 2025-11-04.
Kunngjøring av konkurranse (2025-11-04) Gjenstand Anskaffelsens omfang
Tittel: Framework agreement for independent inspection assignments.
Referansenummer: 25/2870
Kort beskrivelse:
“The contracting authority shall enter into parallel framework agreements for independent inspection assignments. The framework agreements shall cover all...”
Kort beskrivelse
The contracting authority shall enter into parallel framework agreements for independent inspection assignments. The framework agreements shall cover all inspection areas that are always in accordanc with applicable laws and regulations, including the Planning and Building Act ́s (PBL) chapter 24.
Independent inspections shall be carried out in accordance with the Building Application Regulations (SAK10) § 14
Development class 1:
- Humidity assurance of application obliged wet rooms in residences.
- Air tightness in new houses
Development classes 2 and 3:
- Building physics
- Structural safety
Geotechniques
- Fire safety
The contracting authority intends to enter into a contract with three tenderers.
The framework agreement has an upper economic limit of NOK 6.5 million per annum.
The framework agreement does not involve any purchasing obligation. The contracting authority emphasises that the figures are estimates and that the actual volume can vary from year to year. Call-offs will take place as and when the contracting authority's needs materialise. Tenderers must be aware that changes in the economic and/or political framework terms can lead to the estimated number of assignments being increased/reduced.
Vis mer
Kontrakttype: Tjenester
Produkter/tjenester: Kontroll av prosjekt og dokumentasjon📦
Estimert verdi eksklusive mva: 6 500 000 NOK 💰
Beskrivelse
Beskrivelse av anskaffelsen:
“The contracting authority shall enter into parallel framework agreements for independent inspection assignments. The framework agreements shall cover all...”
Beskrivelse av anskaffelsen
The contracting authority shall enter into parallel framework agreements for independent inspection assignments. The framework agreements shall cover all inspection areas that are always in accordanc with applicable laws and regulations, including the Planning and Building Act ́s (PBL) chapter 24.
Independent inspections shall be carried out in accordance with the Building Application Regulations (SAK10) § 14
Development class 1:
- Humidity assurance of application obliged wet rooms in residences.
- Air tightness in new houses
Development classes 2 and 3:
- Building physics
- Structural safety
Geotechniques
- Fire safety
The contracting authority intends to enter into a contract with three tenderers.
The framework agreement has an upper economic limit of NOK 6.5 million per annum.
The framework agreement does not involve any purchasing obligation. The contracting authority emphasises that the figures are estimates and that the actual volume can vary from year to year. Call-offs will take place as and when the contracting authority's needs materialise. Tenderers must be aware that changes in the economic and/or political framework terms can lead to the estimated number of assignments being increased/reduced.
The framework agreement period is two years from the signing of the contract. The contracting authority has an option to extend the contract for a further one year at a time, up to two times (1+1 years) on verbatim terms.
Vis mer Tildelingskriterier
Pris ✅
Pris (vekting): 50
Kvalitetskriterium (navn): Competence
Kvalitetskriterium (vekting): 50
Tittel
Identifikasjonsnummer for delkontrakt: LOT-0000
Prosedyre Prosedyretype
Åpen anbudskonkurranse ✅ Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2025-12-05 11:00:00 📅
Vilkår for åpning av tilbud: 2025-12-05 11:00:00 📅
Vilkår for åpning av tilbud (Informasjon om autoriserte personer og åpningsprosedyre):
“The tenders will not be opening in public.”
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Minste tidsramme som tilbyderen må opprettholde tilbudet i: 3
Informasjon om en rammeavtale eller en dynamisk innkjøpsordning
Rammeavtale med flere leverandører ✅