The work consists of replacing the shaft ventilation on the E39 Fløyfjell tunnel. The existing ventilation is from the construction year (1989) and has reached the expected lifetime. The tunnel consists of two lanes where shaft ventilation is located at the end of the individual lanes seen from the direction of travel. The work to be carried out consists of demolition of the existing installation and the establishment of of a new installation. The existing installation includes i.a. shaft fans, concrete walls, damper arrangements, temporary scaffolding, electrical installation and cables. The new installations include i.a. shaft ventilators, technical buildings, new electrical installations and cabling, dividing walls and fences. There is no option for locks downtime in the form of a closure of the tunnel. This is both to reduce the load on bypass routes and auka traffic in the central area. The tunnel is high traffic (ANNUAL DAILY traffic of approx. 45,000 for both lanes).
Frist
Fristen for mottak av tilbud var 2025-03-17.
Anskaffelsen ble publisert 2025-02-10.
Kunngjøring av konkurranse (2025-02-10) Gjenstand Anskaffelsens omfang
Tittel: E39 Fløyfjellstunnelen - replacement of shaft ventilation
Referansenummer: 23/45164
Kort beskrivelse:
“The work consists of replacing the shaft ventilation on the E39 Fløyfjell tunnel. The existing ventilation is from the construction year (1989) and has...”
Kort beskrivelse
The work consists of replacing the shaft ventilation on the E39 Fløyfjell tunnel. The existing ventilation is from the construction year (1989) and has reached the expected lifetime.
The tunnel consists of two lanes where shaft ventilation is located at the end of the individual lanes seen from the direction of travel. The work to be carried out consists of demolition of the existing installation and the establishment of
of a new installation. The existing installation includes i.a. shaft fans, concrete walls, damper arrangements, temporary scaffolding, electrical installation and cables. The new installations include i.a. shaft ventilators, technical buildings, new electrical installations and cabling, dividing walls and fences.
There is no option for locks downtime in the form of a closure of the tunnel. This is both to reduce the load on bypass routes and auka traffic in the central area. The tunnel is high traffic (ANNUAL DAILY traffic of approx. 45,000 for both lanes).
Vis mer
Kontrakttype: Bygge- og anleggsarbeid
Produkter/tjenester: Bygge- og anleggsvirksomhet📦 Beskrivelse
Beskrivelse av anskaffelsen:
“The work consists of replacing the shaft ventilation on the E39 Fløyfjell tunnel. The existing ventilation is from the construction year (1989) and has...”
Beskrivelse av anskaffelsen
The work consists of replacing the shaft ventilation on the E39 Fløyfjell tunnel. The existing ventilation is from the construction year (1989) and has reached the expected lifetime.
The tunnel consists of two lanes where shaft ventilation is located at the end of the individual lanes seen from the direction of travel. The work to be carried out consists of demolition of the existing installation and the establishment of
of a new installation. The existing installation includes i.a. shaft fans, concrete walls, damper arrangements, temporary scaffolding, electrical installation and cables. The new installations include i.a. shaft ventilators, technical buildings, new electrical installations and cabling, dividing walls and fences.
There is no option for locks downtime in the form of a closure of the tunnel. This is both to reduce the load on bypass routes and auka traffic in the central area. The tunnel is high traffic (ANNUAL DAILY traffic of approx. 45,000 for both lanes).
Vis mer
Tilleggsinformasjon:
“A tender conference will be held 2025-02-19, meet at Team meeting 12:00.”
Tilleggsprodukter/-tjenester: Kjøle- og ventilasjonsutstyr📦
Tilleggsprodukter/-tjenester: Øvrig elektrisk installasjonsarbeid📦
Tilleggsprodukter/-tjenester: Maskininstallasjoner📦
Tilleggsprodukter/-tjenester: Installasjon av elektrisk og mekanisk utstyr📦
Hovedsted eller utførelsessted:
“Fløyfjells tunnel”
Utførelsessted: Vestland🏙️
Varighet: 1 (YEAR)
Tidsrammen nedenfor er uttrykt i antall år.
Tildelingskriterier
Pris ✅
Pris (vekting): 100
Kvalitetskriterium (navn): Justification for the use of climate and environmental requirements in the requirement specifications.
Kvalitetskriterium (vekting): 0
Tittel
Identifikasjonsnummer for delkontrakt: LOT-0000
Prosedyre Prosedyretype
Åpen anbudskonkurranse ✅ Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2025-03-17 11:00:00 📅
Vilkår for åpning av tilbud: 2025-03-17 11:00:00 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Juridisk, økonomisk, finansiell og teknisk informasjon Økonomisk og finansiell stilling
Liste og kort beskrivelse av utvelgelseskriterier:
“Economic and financial capacity: 1. Tenderers must have sufficient economic and financial capacity to fulfil the contract.
2. Tenderers shall have an equity...”
Liste og kort beskrivelse av utvelgelseskriterier
Economic and financial capacity: 1. Tenderers must have sufficient economic and financial capacity to fulfil the contract.
2. Tenderers shall have an equity percentage of at least 10%.
3. The average annual turnover in the last three years shall as a minimum correspond to annual turnover for the contract.
Documentation requirement:
Tenderers shall present the following documentation if requested by the contracting authority:
1. The tenderer's annual financial statement, annual report and auditor's report for the last three years and recent information (quarterly accounts) that is of importance to the tenderer's fiscal numbers.
2. A brief account of information on economic conditions or losses that are not documented elsewhere and which is required to be documented in accordance with Norwegian and/or international accounting standards.
3. An overview of any recently executed, ongoing or pending tax or public reviews of the tenderer's activities.
4. An overview of any events of significance that has taken place after publication of the last revised annual accounts.
If a tenderer has a justifiable reason for not submitting the documentation that the contracting authority has required, he can document his economic and financial capacity by presenting any other document of relevance to the company's fiscal figures/economy. Tenderers shall justify why they cannot submit the documentation that the contracting authority has required.
Vis mer Vilkår for deltakelse
Liste og kort beskrivelse av regler og kriterier:
“Accident frequency rate (H1-verdi): Tenderers and key contract helpers should have an average H1 for the last three years lower than 15.
If the H1-value is...”
Liste og kort beskrivelse av regler og kriterier
Accident frequency rate (H1-verdi): Tenderers and key contract helpers should have an average H1 for the last three years lower than 15.
If the H1-value is higher than 15, an account shall be given of the developing trend of the H1-value and possibly the F-value, which will express the severity of any high H1-value.
If the tenderer is a working partnership (supplier consortium), the requirements apply for each of the participants.
The H1-value is defined as the number of work accidents with absence in relation to the hours work multiplied by 10 exalted in 6.
Documentation requirement:
1. Overview of the company ́s H1-value and central contractual partners in the last three years.
2. If the H1-value is higher than 15, an account shall be given of the developing trend of the H1-value and possibly the F-value, which will express the severity of any high H1-value. In addition a separate account shall then be provided as to whether improvement measures have been implemented, and if so also documentation on the effectiveness of these measures.
Vis mer
Liste og kort beskrivelse av regler og kriterier:
“Support from other entities for fulfilment of the qualification requirements.: The tenderer can, if necessary, rely on other companies' capacity to fulfil...”
Liste og kort beskrivelse av regler og kriterier
Support from other entities for fulfilment of the qualification requirements.: The tenderer can, if necessary, rely on other companies' capacity to fulfil the requirements for economic and financial capacity and/or the requirements for technical and professional qualifications.
Documentation requirement:
Tenderers shall confirm that they fulfil this requirement when submitting their tender. In addition, each individual entity that the tenderer will use to submit a separate ESPD form when submitting a tender.
Tenderers shall, upon request from the contracting authority:
• Documentation that shows that the tenderer can use the necessary resources for the entities that they will use, for example, a commitment statement from these businesses.
• Documentation that shows that the company(s), that the tenderer will use, fulfil the qualification requirement 'the tenderer ́s organisational and legal position'.
• Documentation that shows that the company(s), that the tenderer will use, fulfil the relevant qualification requirements.
• If a tenderer will use the capacity of other companies to fulfil the requirements for economic and financial capacity, a signed joint and several liability statement must be enclosed.
If a tenderer will use the capacity of other companies to fulfil the requirements of relevant experience, these entities shall carry out the services or the building and construction work that requires such qualifications.
Vis mer
Liste og kort beskrivelse av regler og kriterier:
“Suppliers who participate in a working partnership: Several tenderers can participate in the competition jointly. The community must see to the necessary...”
Liste og kort beskrivelse av regler og kriterier
Suppliers who participate in a working partnership: Several tenderers can participate in the competition jointly. The community must see to the necessary documentation that all the qualification requirements are met.
The contracting authority will assess each individual supplier in the community against the provisions on rejection, cf. § 9-5 and § 24-2, this except the provision in § 9-5 (1) letter a) and § 24-2 (1) letter a) fulfilment of the qualification requirements, which will be applied to the jointly combined set.
Tenderers who participate as a working partnership will be assessed collectively for the qualification requirements, with the exception of the requirements for the tenderer's organisational and legal position, documentation for absence of rejection reasons, tax certificates and authority for information on tax and duties (OSA).
Documentation requirement:
Tenderers shall confirm that they fulfil this requirement when submitting their tender. In addition, each individual entity in the (work) group shall submit separate ESPD forms when submitting a tender.
Tenderers shall, upon request from the contracting authority:
• An account of the group (including each participant's role), each participant's organisation number, address and nationality.
• The same documentation as individual tenderers shall be provided for each individual tenderer who participate in the group.
• Declaration of joint and several liability to the contracting authority.
The community of suppliers can, if necessary, rely on other entities to fulfil the qualification requirements, see the point on support from other companies to fulfil the qualification requirements.
The contracting authority requires that the tenderer who fulfils the requirements for relevant experience shall carry out the services or the building and construction work that requires such qualifications.
Vis mer
Liste og kort beskrivelse av regler og kriterier:
“Particularly on newly established tenderers: A tenderer who is newly established and cannot present all the required documentation must be particularly...”
Liste og kort beskrivelse av regler og kriterier
Particularly on newly established tenderers: A tenderer who is newly established and cannot present all the required documentation must be particularly careful to document and substantiate that they still have the prerequisites required to fulfil the contract.
It is particularly important that such tenderers can document a sufficiently large workforce for the execution of the contract, including technical and professional qualifications. Newly established tenderers emphasise that it is the tenderer's ability as such to carry out the contract that is assessed, not individual persons ́ competence in isolation.
If a newly established tenderer has experience from contracts, the most relevant contracts from which the tenderer has experience must be completed in accordance with the documentation requirements regarding relevant experience. This is even if the contracts are of such a nature that they do not fulfil the specified requirements.
Missing or inadequate documentation in one or more of the requirements can result in the tenderer being rejected. Insufficient or incorrect completed response form can also lead to rejection.
Tenderers who have established themselves within a new discipline can also be seen as newly established.
Vis mer
Liste og kort beskrivelse av vilkår:
“ESPD: The European Self-Declaration Form (ESPD)
The tenderer shall submit the European self-declaration form (ESPD) together with the tender.
The...”
Liste og kort beskrivelse av vilkår
ESPD: The European Self-Declaration Form (ESPD)
The tenderer shall submit the European self-declaration form (ESPD) together with the tender.
The provisions on rejection due to conditions at the tenderer are stated in the procurement regulations § 24-2. The European Self-Declaration Form (ESPD) applies as provisional documentation, among other things, so that there are no such reasons for rejection.
Further documentation requirements for absence of rejection reasons are in the procurement regulations § 24-7, possibly also § 24-5 (1) if documentation of such measures is relevant. The documentation shall be submitted in accordance with the communication terms stated in chapter B1 and in accordance with the deadline set by the Contracting Authority, in the event that the Contracting Authority requires this. The certificates mentioned in § 24-7 (1) letter a) and b) must not be older than 6 months calculated from the deadline for submitting a request for participation in the competition or a tender.
If the necessary certificates/documents for documenting the absence of rejection reasons are not issued in the tenderer's home country or the country where they are established, or if they do not cover all the rejection reasons mentioned in the procurement regulations § 24-2 (1) letter b, (2) and (3) letters a and b, the completed ESPD form applies as documentation for these conditions.
The contracting authority will be able to conduct separate surveys related to the tenderer's activities, including participants in a supplier partnership and supported entities to the tenderer, as well as other conditions that are relevant to assess whether the tenderer can be qualified.
Vis mer
Liste og kort beskrivelse av vilkår:
“Tax Certificate: Tenderers shall, upon request by the contracting authority, submit a tax certificate for VAT and tax certificates issued by a competent...”
Liste og kort beskrivelse av vilkår
Tax Certificate: Tenderers shall, upon request by the contracting authority, submit a tax certificate for VAT and tax certificates issued by a competent body in the tenderer's home country or the country where the tenderer is established.
The certificate shall document whether the tenderer has fulfilled his obligations to pay taxes, duties and social security contributions.
The certificate must not be older than 6 months calculated from the deadline for submitting a request for participation in the competition or a tender.
Vis mer
Liste og kort beskrivelse av vilkår:
“Authority for information on tax and duties (OSA): As a part of the Norwegian Public Roads Administration's struggle against labour crime, including black...”
Liste og kort beskrivelse av vilkår
Authority for information on tax and duties (OSA): As a part of the Norwegian Public Roads Administration's struggle against labour crime, including black work and social dumping, a cooperation agreement has been signed between the Norwegian Public Roads Administration and the Norwegian Tax Administration. In connection with this, the Norwegian Public Roads Administration requires a signed authority for all of its suppliers, which gives the Norwegian Public Roads Administration an expanded right to an unlimited number of times to obtain information about the tax and sub-contractor's tax and duty conditions, as stated in the authority.
If the winning tenderer does not already have a valid signed authority registered with the Norwegian Public Roads Administration/contracting authority, the authority shall be signed by the winning tenderer after the award of contract letter has been received, but before the contract is signed. The authorisation form is to be sent to the winning tenderer together with the award letter. Signed authority together with a colour copy of a passport, driving licence or national ID card (the latter for citizens within the EU/EEA/EFTA), shall be returned to the contracting authority as soon as possible and within 3 days. The date of birth can be deleted on a copy of the ID documentation, so that only the date of birth is given.
Please note that the signed authority requirement also applies for all of the main service provider's sub-suppliers. The main service provider shall fulfil the contractual obligation downwards in the supplier chain. Prior to signing the contract, however, only signed authority is required from the main supplier, unless the sub-contractor is used to fulfil a qualification requirement in the competition. If so, the signed authority must be presented from both the main supplier and the sub-supplier. Signed authority from other sub-suppliers must be submitted and approved by the contracting authority before they can be used in the contract/project.
The contracting authority draws attention to the fact that it may be necessary to reject the tenderer and any sub-suppliers who in the award letter are chosen as the winner of the competition, if, after the award, but prior to signing the contract, information will be received from the Norwegian Tax Administration regarding non fulfilment of tax and duty obligations etc. The award cannot, therefore, be considered final until there is an assessment of the obtained information that does not change the contracting authority ́s award decision.
Emphasis is put on the fact that if no authority is signed from the main supplier and any sub-suppliers used in the qualification, this could be seen as a significant reservation to the contract which will result in both the main supplier and any sub-suppliers being rejected from the competition.
Requirements of the tenderer ́s organisational and legal position.
Tenderers shall be a legally established company or consist of a community of suppliers who are legally established companies.
The requirement also applies to entities that the tenderer will use.
Documentation requirement:
Tenderers shall, upon request from the contracting authority, enclose a certificate from the Register of Business Enterprises or an equivalent certificate for statutory registration in the country where the tenderer or the entities that jointly constitute the tenderer are established, as well as certificates for all supporting entities.
Vis mer
Liste og kort beskrivelse av vilkår:
“The organisational and legal position of the tenderer.: Tenderers shall be a legally established company or consist of a community of suppliers who are...”
Liste og kort beskrivelse av vilkår
The organisational and legal position of the tenderer.: Tenderers shall be a legally established company or consist of a community of suppliers who are legally established companies.
The requirement also applies to entities that the tenderer will use.
Documentation requirement:
Tenderers shall, upon request from the contracting authority, enclose a certificate from the Register of Business Enterprises or an equivalent certificate for statutory registration in the country where the tenderer or the entities that jointly constitute the tenderer are established, as well as certificates for all supporting entities.
Vis mer Teknisk og faglig kapasitet
Liste og kort beskrivelse av utvelgelseskriterier:
“Relevant experience: Tenderers shall have sufficient experience of a relevant nature and degree of difficulty from:
• Electrical installation works in...”
Liste og kort beskrivelse av utvelgelseskriterier
Relevant experience: Tenderers shall have sufficient experience of a relevant nature and degree of difficulty from:
• Electrical installation works in tunnels
Documentation requirement:
Tenderers shall present the following documentation if requested by the contracting authority:
An overview of 3-5 contracts that the tenderer has carried out or executes during the last five years calculated from the tender deadline. The overview shall, cf. the form included in chapter E2, include, among other things, the following for each of the contracts:
• Name of the recipient (contracting authority).
• Contact person/reference person at the contracting authority with contact data (telephone number and email address) and a statement of
their role at the contracting authority during the contract.
• Date of the delivery.
• The contract ́s value.
• Which work was carried out by the tenderer, including as the main contractor or sub-contractor, and which work
that were carried out by sub-contractors.
• A description of what the contractual works were about, including relevance to the qualification requirement.
Vis mer
Liste og kort beskrivelse av utvelgelseskriterier:
“Implementation ability:: The tenderer shall:
1. Have the capacity and ability to handle predicted and unforeseen conditions in the contract.
2. Offer...”
Liste og kort beskrivelse av utvelgelseskriterier
Implementation ability:: The tenderer shall:
1. Have the capacity and ability to handle predicted and unforeseen conditions in the contract.
2. Offer sufficient manpower to carry out the contract.
3. Have technical and professional competence and relevant experience with the key personnel offered for fulfilling the contract.
Documentation requirement:
Tenderers shall present the following documentation if requested by the contracting authority:
1. An overview of the tenderer's average workforce and the number of employees in the management in the last three years.
2. An overview of the manpower that the tenderer offers to carry out the contract, including an organisation plan for the contract.
3. CVs and job descriptions for key personnel, cf. chapter C, including the following resources:
-Manager
- Site Manager
- HSE manager
“A tender conference will be held 2025-02-19, meet at Team meeting 12:00.” Klageinstans
Navn: Oslo tingrett
Nasjonalt registreringsnummer: 926725939
Postadresse: C.J. Hambros plass 4
Postnummer: 0125
Poststed: Oslo
Land: Norge 🇳🇴
E-post: oslo.tingrett@domstol.no📧
Telefon: +47 22035200📞 Informasjon om elektroniske arbeidsflyter
Elektronisk fakturering vil bli akseptert
Elektronisk bestilling vil bli brukt
Elektronisk betaling vil bli brukt
Kilde: OJS 2025/S 029-092402 (2025-02-10)
Kunngjøring av konkurranse (2025-03-05) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
“The work consists of replacing the shaft ventilation on the E39 Fløyfjell tunnel. The existing ventilation is from the construction year (1989) and has...”
Kort beskrivelse
The work consists of replacing the shaft ventilation on the E39 Fløyfjell tunnel. The existing ventilation is from the construction year (1989) and has reached the expected lifetime. The tunnel consists of two lanes where shaft ventilation is located at the end of the individual lanes seen from the direction of travel. The work to be carried out consists of demolition of the existing installation and the establishment of of a new installation. The existing installation includes i.a. shaft fans, concrete walls, damper arrangements, temporary scaffolding, electrical installation and cables. The new installations include i.a. shaft ventilators, technical buildings, new electrical installations and cabling, dividing walls and fences. There is no option for locks downtime in the form of a closure of the tunnel. This is both to reduce the load on bypass routes and auka traffic in the central area. The tunnel is high traffic (ANNUAL DAILY traffic of approx. 45,000 for both lanes).
Vis mer Beskrivelse
Beskrivelse av anskaffelsen:
“The work consists of replacing the shaft ventilation on the E39 Fløyfjell tunnel. The existing ventilation is from the construction year (1989) and has...”
Beskrivelse av anskaffelsen
The work consists of replacing the shaft ventilation on the E39 Fløyfjell tunnel. The existing ventilation is from the construction year (1989) and has reached the expected lifetime. The tunnel consists of two lanes where shaft ventilation is located at the end of the individual lanes seen from the direction of travel. The work to be carried out consists of demolition of the existing installation and the establishment of of a new installation. The existing installation includes i.a. shaft fans, concrete walls, damper arrangements, temporary scaffolding, electrical installation and cables. The new installations include i.a. shaft ventilators, technical buildings, new electrical installations and cabling, dividing walls and fences. There is no option for locks downtime in the form of a closure of the tunnel. This is both to reduce the load on bypass routes and auka traffic in the central area. The tunnel is high traffic (ANNUAL DAILY traffic of approx. 45,000 for both lanes).
Prosedyre Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2025-04-25 10:00:00 📅
Vilkår for åpning av tilbud: 2025-04-25 10:00:00 📅
Juridisk, økonomisk, finansiell og teknisk informasjon Økonomisk og finansiell stilling
Liste og kort beskrivelse av utvelgelseskriterier:
“Economic and financial capacity: 1. Tenderers must have sufficient economic and financial capacity to fulfil the contract. 2. Tenderers shall have an equity...”
Liste og kort beskrivelse av utvelgelseskriterier
Economic and financial capacity: 1. Tenderers must have sufficient economic and financial capacity to fulfil the contract. 2. Tenderers shall have an equity percentage of at least 10%. 3. The average annual turnover in the last three years shall as a minimum correspond to annual turnover for the contract. Documentation requirement: Tenderers shall present the following documentation if requested by the contracting authority: 1. The tenderer's annual financial statement, annual report and auditor's report for the last three years and recent information (quarterly accounts) that is of importance to the tenderer's fiscal numbers. 2. A brief account of information on economic conditions or losses that are not documented elsewhere and which is required to be documented in accordance with Norwegian and/or international accounting standards. 3. An overview of any recently executed, ongoing or pending tax or public reviews of the tenderer's activities. 4. An overview of any events of significance that has taken place after publication of the last revised annual accounts. If a tenderer has a justifiable reason for not submitting the documentation that the contracting authority has required, he can document his economic and financial capacity by presenting any other document of relevance to the company's fiscal figures/economy. Tenderers shall justify why they cannot submit the documentation that the contracting authority has required.
Vis mer Vilkår for deltakelse
Liste og kort beskrivelse av regler og kriterier:
“Accident frequency rate (H1-verdi): Tenderers and key contract helpers should have an average H1 for the last three years lower than 15. If the H1-value is...”
Liste og kort beskrivelse av regler og kriterier
Accident frequency rate (H1-verdi): Tenderers and key contract helpers should have an average H1 for the last three years lower than 15. If the H1-value is higher than 15, an account shall be given of the developing trend of the H1-value and possibly the F-value, which will express the severity of any high H1-value. If the tenderer is a working partnership (supplier consortium), the requirements apply for each of the participants. The H1-value is defined as the number of work accidents with absence in relation to the hours work multiplied by 10 exalted in 6. Documentation requirement: 1. Overview of the company ́s H1-value and central contractual partners in the last three years. 2. If the H1-value is higher than 15, an account shall be given of the developing trend of the H1-value and possibly the F-value, which will express the severity of any high H1-value. In addition a separate account shall then be provided as to whether improvement measures have been implemented, and if so also documentation on the effectiveness of these measures.
Vis mer
Liste og kort beskrivelse av regler og kriterier:
“Support from other entities for fulfilment of the qualification requirements.: The tenderer can, if necessary, rely on other companies' capacity to fulfil...”
Liste og kort beskrivelse av regler og kriterier
Support from other entities for fulfilment of the qualification requirements.: The tenderer can, if necessary, rely on other companies' capacity to fulfil the requirements for economic and financial capacity and/or the requirements for technical and professional qualifications. Documentation requirement: Tenderers shall confirm that they fulfil this requirement when submitting their tender. In addition, each individual entity that the tenderer will use to submit a separate ESPD form when submitting a tender. Tenderers shall, upon request from the contracting authority: • Documentation that shows that the tenderer can use the necessary resources for the entities that they will use, for example, a commitment statement from these businesses. The template for the commitment statement is published on: https://www.vegvesen.no/fag/veg-og-gate/konkurranser-og-kontraktsdokumenter/generelle-kontraktsdokumenter/. • Documentation that shows that the company(s), that the tenderer will use, fulfil the qualification requirement 'the tenderer ́s organisational and legal position'. • Documentation that shows that the company(s), that the tenderer will use, fulfil the relevant qualification requirements. • If a tenderer will use the capacity of other companies to fulfil the requirements for economic and financial capacity, a signed joint and several liability statement must be enclosed. The template for a joint and several liability statement is published on: https://www.vegvesen.no/fag/veg-og-gate/konkurranser-og-kontraktsdokumenter/generelle-kontraktsdokumenter/. If a tenderer will use the capacity of other companies to fulfil the requirements of relevant experience, these entities shall carry out the services or the building and construction work that requires such qualifications.
Vis mer
Liste og kort beskrivelse av regler og kriterier:
“Suppliers who participate in a working partnership: Several tenderers can participate in the competition jointly. The community must see to the necessary...”
Liste og kort beskrivelse av regler og kriterier
Suppliers who participate in a working partnership: Several tenderers can participate in the competition jointly. The community must see to the necessary documentation that all the qualification requirements are met. The contracting authority will assess each individual supplier in the community against the provisions on rejection, cf. § 9-5 and § 24-2, this except the provision in § 9-5 (1) letter a) and § 24-2 (1) letter a) fulfilment of the qualification requirements, which will be applied to the jointly combined set. Tenderers who participate as a working partnership will be assessed collectively for the qualification requirements, with the exception of the requirements for the tenderer's organisational and legal position, documentation for absence of rejection reasons, tax certificates and authority for information on tax and duties (OSA). Documentation requirement: Tenderers shall confirm that they fulfil this requirement when submitting their tender. In addition, each individual entity in the (work) group shall submit separate ESPD forms when submitting a tender. Tenderers shall, upon request from the contracting authority: • An account of the group (including each participant's role), each participant's organisation number, address and nationality. • The same documentation as individual tenderers shall be provided for each individual tenderer who participate in the group. • Declaration of joint and several liability to the contracting authority. The template for a joint and several liability statement is published on: https://www.vegvesen.no/fag/veg-og-gate/konkurranser-og-kontraktsdokumenter/generelle-kontraktsdokumenter/. The community of suppliers can, if necessary, rely on other entities to fulfil the qualification requirements, see the point on support from other companies to fulfil the qualification requirements. The contracting authority requires that the tenderer who fulfils the requirements for relevant experience shall carry out the services or the building and construction work that requires such qualifications.
Vis mer
Liste og kort beskrivelse av regler og kriterier:
“Particularly on newly established tenderers: A tenderer who is newly established and cannot present all the required documentation must be particularly...”
Liste og kort beskrivelse av regler og kriterier
Particularly on newly established tenderers: A tenderer who is newly established and cannot present all the required documentation must be particularly careful to document and substantiate that they still have the prerequisites required to fulfil the contract. It is particularly important that such tenderers can document a sufficiently large workforce for the execution of the contract, including technical and professional qualifications. Newly established tenderers emphasise that it is the tenderer's ability as such to carry out the contract that is assessed, not individual persons ́ competence in isolation. If a newly established tenderer has experience from contracts, the most relevant contracts from which the tenderer has experience must be completed in accordance with the documentation requirements regarding relevant experience. This is even if the contracts are of such a nature that they do not fulfil the specified requirements. Missing or inadequate documentation in one or more of the requirements can result in the tenderer being rejected. Insufficient or incorrect completed response form can also lead to rejection. Tenderers who have established themselves within a new discipline can also be seen as newly established.
Vis mer
Liste og kort beskrivelse av vilkår:
“ESPD: The European Self-Declaration Form (ESPD) The tenderer shall submit the European self-declaration form (ESPD) together with the tender. The provisions...”
Liste og kort beskrivelse av vilkår
ESPD: The European Self-Declaration Form (ESPD) The tenderer shall submit the European self-declaration form (ESPD) together with the tender. The provisions on rejection due to conditions at the tenderer are stated in the procurement regulations § 24-2. The European Self-Declaration Form (ESPD) applies as provisional documentation, among other things, so that there are no such reasons for rejection. Further documentation requirements for absence of rejection reasons are in the procurement regulations § 24-7, possibly also § 24-5 (1) if documentation of such measures is relevant. The documentation shall be submitted in accordance with the communication terms stated in chapter B1 and in accordance with the deadline set by the Contracting Authority, in the event that the Contracting Authority requires this. The certificates mentioned in § 24-7 (1) letter a) and b) must not be older than 6 months calculated from the deadline for submitting a request for participation in the competition or a tender. If the necessary certificates/documents for documenting the absence of rejection reasons are not issued in the tenderer's home country or the country where they are established, or if they do not cover all the rejection reasons mentioned in the procurement regulations § 24-2 (1) letter b, (2) and (3) letters a and b, the completed ESPD form applies as documentation for these conditions. The contracting authority will be able to conduct separate surveys related to the tenderer's activities, including participants in a supplier partnership and supported entities to the tenderer, as well as other conditions that are relevant to assess whether the tenderer can be qualified.
Vis mer
Liste og kort beskrivelse av vilkår:
“Tax Certificate: Tenderers shall, upon request by the contracting authority, submit a tax certificate for VAT and tax certificates issued by a competent...”
Liste og kort beskrivelse av vilkår
Tax Certificate: Tenderers shall, upon request by the contracting authority, submit a tax certificate for VAT and tax certificates issued by a competent body in the tenderer's home country or the country where the tenderer is established. The certificate shall document whether the tenderer has fulfilled his obligations to pay taxes, duties and social security contributions. The certificate must not be older than 6 months calculated from the deadline for submitting a request for participation in the competition or a tender.
Vis mer
Liste og kort beskrivelse av vilkår:
“Authority for information on tax and duties (OSA): As a part of the Norwegian Public Roads Administration's struggle against labour crime, including black...”
Liste og kort beskrivelse av vilkår
Authority for information on tax and duties (OSA): As a part of the Norwegian Public Roads Administration's struggle against labour crime, including black work and social dumping, a cooperation agreement has been signed between the Norwegian Public Roads Administration and the Norwegian Tax Administration. In connection with this, the Norwegian Public Roads Administration requires a signed authority for all of its suppliers, which gives the Norwegian Public Roads Administration an expanded right to an unlimited number of times to obtain information about the tax and sub-contractor's tax and duty conditions, as stated in the authority. If the winning tenderer does not already have a valid signed authority registered with the Norwegian Public Roads Administration/contracting authority, the authority shall be signed by the winning tenderer after the award of contract letter has been received, but before the contract is signed. The authorisation form is to be sent to the winning tenderer together with the award letter. Signed authority together with a colour copy of a passport, driving licence or national ID card (the latter for citizens within the EU/EEA/EFTA), shall be returned to the contracting authority as soon as possible and within 3 days. The date of birth can be deleted on a copy of the ID documentation, so that only the date of birth is given. Please note that the signed authority requirement also applies for all of the main service provider's sub-suppliers. The main service provider shall fulfil the contractual obligation downwards in the supplier chain. Prior to signing the contract, however, only signed authority is required from the main supplier, unless the sub-contractor is used to fulfil a qualification requirement in the competition. If so, the signed authority must be presented from both the main supplier and the sub-supplier. Signed authority from other sub-suppliers must be submitted and approved by the contracting authority before they can be used in the contract/project. The contracting authority draws attention to the fact that it may be necessary to reject the tenderer and any sub-suppliers who in the award letter are chosen as the winner of the competition, if, after the award, but prior to signing the contract, information will be received from the Norwegian Tax Administration regarding non fulfilment of tax and duty obligations etc. The award cannot, therefore, be considered final until there is an assessment of the obtained information that does not change the contracting authority ́s award decision. Emphasis is put on the fact that if no authority is signed from the main supplier and any sub-suppliers used in the qualification, this could be seen as a significant reservation to the contract which will result in both the main supplier and any sub-suppliers being rejected from the competition. The template for authorisation for tax and duty information (OSA) has been published in: https://www.vegvesen.no/fag/veg-og-gate/konkurranser-og-kontraktsdokumenter/generelle-kontraktsdokumenter/ Requirements of the tenderer ́s organisational and legal position. Tenderers shall be a legally established company or consist of a community of suppliers who are legally established companies. The requirement also applies to entities that the tenderer will use. Documentation requirement: Tenderers shall, upon request from the contracting authority, enclose a certificate from the Register of Business Enterprises or an equivalent certificate for statutory registration in the country where the tenderer or the entities that jointly constitute the tenderer are established, as well as certificates for all supporting entities.
Vis mer
Liste og kort beskrivelse av vilkår:
“The organisational and legal position of the tenderer.: Tenderers shall be a legally established company or consist of a community of suppliers who are...”
Liste og kort beskrivelse av vilkår
The organisational and legal position of the tenderer.: Tenderers shall be a legally established company or consist of a community of suppliers who are legally established companies. The requirement also applies to entities that the tenderer will use. Documentation requirement: Tenderers shall, upon request from the contracting authority, enclose a certificate from the Register of Business Enterprises or an equivalent certificate for statutory registration in the country where the tenderer or the entities that jointly constitute the tenderer are established, as well as certificates for all supporting entities.
Vis mer Teknisk og faglig kapasitet
Liste og kort beskrivelse av utvelgelseskriterier:
“Relevant experience: Tenderers shall have sufficient experience of a relevant nature and degree of difficulty from: • Electrical installation works in...”
Liste og kort beskrivelse av utvelgelseskriterier
Relevant experience: Tenderers shall have sufficient experience of a relevant nature and degree of difficulty from: • Electrical installation works in tunnels Documentation requirement: Tenderers shall present the following documentation if requested by the contracting authority: An overview of 3-5 contracts that the tenderer has carried out or executes during the last five years calculated from the tender deadline. The overview shall, cf. the form included in chapter E2, include, among other things, the following for each of the contracts: • Name of the recipient (contracting authority). • Contact person/reference person at the contracting authority with contact data (telephone number and email address) and a statement of their role at the contracting authority during the contract. • Date of the delivery. • The contract ́s value. • Which work was carried out by the tenderer, including as the main contractor or sub-contractor, and which work that were carried out by sub-contractors. • A description of what the contractual works were about, including relevance to the qualification requirement.
Vis mer
Liste og kort beskrivelse av utvelgelseskriterier:
“Implementation ability:: The tenderer shall: 1. Have the capacity and ability to handle predicted and unforeseen conditions in the contract. 2. Offer...”
Liste og kort beskrivelse av utvelgelseskriterier
Implementation ability:: The tenderer shall: 1. Have the capacity and ability to handle predicted and unforeseen conditions in the contract. 2. Offer sufficient manpower to carry out the contract. 3. Have technical and professional competence and relevant experience with the key personnel offered for fulfilling the contract. Documentation requirement: Tenderers shall present the following documentation if requested by the contracting authority: 1. An overview of the tenderer's average workforce and the number of employees in the management in the last three years. 2. An overview of the manpower that the tenderer offers to carry out the contract, including an organisation plan for the contract. 3. CVs and job descriptions for key personnel, cf. chapter C, including the following resources: -Manager - Site Manager - HSE manager