Brief main elements of the assignment, but not exhaustively are: Here the name is brief and not exhaustive: Demolition and removal of stores/carport/workshop/garage with the accompanying technical facilities, parts of the retaining wall and some other minor building parts in/by technical central F Establishment of a pipe wall that is preparing for a construction pit for F2Phases alterations to road installations and the establishment of partially time-limited and partially permanent road installations around future buildings F2- Establishment of a new Water and Sewage facility for F2. handling surface water and time limited installations, Alteration and alteration of supply installations for medical gases, including conducive roads, Facility technical and construction auxiliary works for high voltage (electricity for the main project) Testing, commissioning, in the use of altered/new technical installations and infrastructure.
Frist
Fristen for mottak av tilbud var 2025-07-01.
Anskaffelsen ble publisert 2025-05-23.
Kunngjøring av konkurranse (2025-05-23) Gjenstand Anskaffelsens omfang
Tittel: Contract 7042 Road north of F2 and Q site, limited time - New Rikshospitalet
Referansenummer: NRH-7042-25-0001
Kort beskrivelse:
Brief main elements of the assignment, but not exhaustively are: Here the name is brief and not exhaustive: Demolition and removal of stores/carport/workshop/garage with the accompanying technical facilities, parts of the retaining wall and some other minor building parts in/by technical central F Establishment of a pipe wall that is preparing for a construction pit for F2Phases alterations to road installations and the establishment of partially time-limited and partially permanent road installations around future buildings F2- Establishment of a new Water and Sewage facility for F2. handling surface water and time limited installations, Alteration and alteration of supply installations for medical gases, including conducive roads, Facility technical and construction auxiliary works for high voltage (electricity for the main project) Testing, commissioning, in the use of altered/new technical installations and infrastructure.
Brief main elements of the assignment, but not exhaustively are: Here the name is brief and not exhaustive: Demolition and removal of stores/carport/workshop/garage with the accompanying technical facilities, parts of the retaining wall and some other minor building parts in/by technical central F Establishment of a pipe wall that is preparing for a construction pit for F2Phases alterations to road installations and the establishment of partially time-limited and partially permanent road installations around future buildings F2- Establishment of a new Water and Sewage facility for F2. handling surface water and time limited installations, Alteration and alteration of supply installations for medical gases, including conducive roads, Facility technical and construction auxiliary works for high voltage (electricity for the main project) Testing, commissioning, in the use of altered/new technical installations and infrastructure.
Brief main elements of the assignment, but not exhaustively are: Here the name is brief and not exhaustive: Demolition and removal of stores/carport/workshop/garage with the accompanying technical facilities, parts of the retaining wall and some other minor building parts in/by technical central F Establishment of a pipe wall that is preparing for a construction pit for F2Phases alterations to road installations and the establishment of partially time-limited and partially permanent road installations around future buildings F2- Establishment of a new Water and Sewage facility for F2. handling surface water and time limited installations, Alteration and alteration of supply installations for medical gases, including conducive roads, Facility technical and construction auxiliary works for high voltage (electricity for the main project) Testing, commissioning, in the use of altered/new technical installations and infrastructure.
Brief main elements of the assignment, but not exhaustively are: Here the name is brief and not exhaustive: Demolition and removal of stores/carport/workshop/garage with the accompanying technical facilities, parts of the retaining wall and some other minor building parts in/by technical central F Establishment of a pipe wall that is preparing for a construction pit for F2Phases alterations to road installations and the establishment of partially time-limited and partially permanent road installations around future buildings F2- Establishment of a new Water and Sewage facility for F2. handling surface water and time limited installations, Alteration and alteration of supply installations for medical gases, including conducive roads, Facility technical and construction auxiliary works for high voltage (electricity for the main project) Testing, commissioning, in the use of altered/new technical installations and infrastructure.
Rettslig grunnlag:
The procurement will be made in accordance with the Public Procurement Act of 17 June 2016 (LOA) and the Public Procurement Regulations (FOA) dated 12 August 2016 no. 974 parts I and part III.
Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2025-07-01 10:00:00 📅
Vilkår for åpning av tilbud: 2025-07-01 10:00:00 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Minste tidsramme som tilbyderen må opprettholde tilbudet i: 6 måneder Anbudsvilkår
Avansert eller kvalifisert elektronisk signatur eller segl (som definert i forordning (EU) nr. 910/2014) er påkrevd
Åpningsdato: 2025-07-01 10:00:00 📅
Elektronisk fakturering: Påkrevd
Elektronisk bestilling vil bli brukt ✅
Elektronisk betaling vil bli brukt ✅
Frist for å be om tilleggsinformasjon: 2025-06-16 10:00:00 📅
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Utvalgskriterium: Finansielt nøkkeltall
Liste og kort beskrivelse av regler og kriterier:
For financial key figures stated in the notice or in the procurement documents, the tenderer declares that the actual value(s) of the requested key figures are as follows:
Minimum qualification requirements
Economy
Tenderers shall have sufficient economic and financial capacity to fulfil the contractual obligations.
The contracting authority will undertake an overall assessment of whether the qualification requirement is fulfilled. Documentation requirement: A credit rating based on the most recent available accounting figures. The credit rating must not be older than six months calculated from the deadline for receipt of tenders. The rating shall be carried out by a credit rating company with licence to conduct this service.
Tenderers shall submit annual accounts for the last 3 years.
The contracting authority reserves the right to obtain a credit report in order to verify that the tenderer fulfils the requirement.
If the tenderer has a justifiable reason for not submitting the documentation that the Builder has demanded, he can document his economic and financial capacity by presenting any other document that the Builder deems suitable.
For financial key figures stated in the notice or in the procurement documents, the tenderer declares that the actual value(s) of the requested key figures are as follows:
Minimum qualification requirements
Economy
Tenderers shall have sufficient economic and financial capacity to fulfil the contractual obligations.
The contracting authority will undertake an overall assessment of whether the qualification requirement is fulfilled. Documentation requirement: A credit rating based on the most recent available accounting figures. The credit rating must not be older than six months calculated from the deadline for receipt of tenders. The rating shall be carried out by a credit rating company with licence to conduct this service.
Tenderers shall submit annual accounts for the last 3 years.
The contracting authority reserves the right to obtain a credit report in order to verify that the tenderer fulfils the requirement.
If the tenderer has a justifiable reason for not submitting the documentation that the Builder has demanded, he can document his economic and financial capacity by presenting any other document that the Builder deems suitable.
Utvalgskriterium: Andre økonomiske eller finansielle krav
Liste og kort beskrivelse av regler og kriterier:
Regarding any other economic and financial requirements that have been stated in the notice or in the procurement documents, the tenderer declares that:
Minimum qualification requirements
Tax and duties
Tenderers shall have their tax and VAT payments in order. Documentation requirement: Tax and VAT certificate, not older than 6 months calculated from the deadline for submitting a tender. Tenderers with offices in other EEA countries shall submit certificates or other legal documentation in accordance with EEA public procurement regulations. Other international tenderers shall submit equivalent documentation.
Regarding any other economic and financial requirements that have been stated in the notice or in the procurement documents, the tenderer declares that:
Minimum qualification requirements
Tax and duties
Tenderers shall have their tax and VAT payments in order. Documentation requirement: Tax and VAT certificate, not older than 6 months calculated from the deadline for submitting a tender. Tenderers with offices in other EEA countries shall submit certificates or other legal documentation in accordance with EEA public procurement regulations. Other international tenderers shall submit equivalent documentation.
Utvalgskriterium: Referanser på spesifiserte arbeider
Liste og kort beskrivelse av regler og kriterier:
Only for public building and construction works: During the reference period the tenderer has carried out the following work of the requested type. The contracting authority can require up to five years experience and allow experience from the previous five years to be taken into consideration.
Minimum qualification requirements
Experience
Tenderers shall have sufficient relevant experience.
Documentation requirement: Relevant reference projects in the last 8 years must be described.
The following account shall be included in the description of each reference project that the tenderer would like to plead:
• The tenderer ́s role (main or sub-supplier)
• The central work assignments in the contract
• The size of the contract, measured in NOK
• The contract period
The description of each reference project shall be in a separate form, cf. Annex 2.
The builder will undertake a total assessment of the submitted reference project from the tenderer and from any sub-suppliers that the tenderer has relied on, cf. point 5.3.
Only for public building and construction works: During the reference period the tenderer has carried out the following work of the requested type. The contracting authority can require up to five years experience and allow experience from the previous five years to be taken into consideration.
Minimum qualification requirements
Experience
Tenderers shall have sufficient relevant experience.
Documentation requirement: Relevant reference projects in the last 8 years must be described.
The following account shall be included in the description of each reference project that the tenderer would like to plead:
• The tenderer ́s role (main or sub-supplier)
• The central work assignments in the contract
• The size of the contract, measured in NOK
• The contract period
The description of each reference project shall be in a separate form, cf. Annex 2.
The builder will undertake a total assessment of the submitted reference project from the tenderer and from any sub-suppliers that the tenderer has relied on, cf. point 5.3.
Utvalgskriterium: Attester fra uavhengige organer om kvalitetsstandarder
Liste og kort beskrivelse av regler og kriterier:
Can tenderers submit certificates issued by independent bodies that document that the tenderer fulfils the stated quality assurance standards, including universal design requirements?
Minimum qualification requirements
Quality Assurance System
The tenderer shall have a suitable and implemented quality assurance system. Documentation requirement: A general account of the tenderer ́s quality system as well as a copy of the table of contents. The account shall be on approx. two sides.
If a tenderer is certified in accordance with ISO 9001 or equivalent certification schemes, it will be sufficient to fulfil the requirement.
Can tenderers submit certificates issued by independent bodies that document that the tenderer fulfils the stated quality assurance standards, including universal design requirements?
Minimum qualification requirements
Quality Assurance System
The tenderer shall have a suitable and implemented quality assurance system. Documentation requirement: A general account of the tenderer ́s quality system as well as a copy of the table of contents. The account shall be on approx. two sides.
If a tenderer is certified in accordance with ISO 9001 or equivalent certification schemes, it will be sufficient to fulfil the requirement.
Utvalgskriterium: Attester fra uavhengige organer om miljøstyringssystemer eller -standarder
Liste og kort beskrivelse av regler og kriterier:
Is the tenderer able to submit certificates issued by independent bodies as documentation that the tenderer fulfils the stated environmental management systems or standards?
Minimum qualification requirements
Environmental management system
Tenderers shall have a suitable and implemented system for environmental management. Documentation requirement: A general account of the tenderer's system for ensuring that the service is carried out in accordance with environmentally relevant requirements in the contract, as well as a copy of the table of contents. The account shall be on approx. three sides.
If the tenderer is certified in accordance with ISO 14001:2015, Miljøfyrtårnet [The Environmental Lighthouse] or equivalent certification schemes, this will be sufficient to fulfil the requirement.
Is the tenderer able to submit certificates issued by independent bodies as documentation that the tenderer fulfils the stated environmental management systems or standards?
Minimum qualification requirements
Environmental management system
Tenderers shall have a suitable and implemented system for environmental management. Documentation requirement: A general account of the tenderer's system for ensuring that the service is carried out in accordance with environmentally relevant requirements in the contract, as well as a copy of the table of contents. The account shall be on approx. three sides.
If the tenderer is certified in accordance with ISO 14001:2015, Miljøfyrtårnet [The Environmental Lighthouse] or equivalent certification schemes, this will be sufficient to fulfil the requirement.
Utestengelsesgrunn:
Akkord med kreditorer
Avtaler med andre økonomiske aktører som har til formål å vri konkurransen
Barnearbeid og andre former for menneskehandel
+ 21 til
Bedrageri
Brudd på forpliktelser fastsatt i nasjonale utelukkelsesgrunner
Brudd på forpliktelser på arbeidsrettens område
Brudd på forpliktelser på miljørettens område
Brudd på forpliktelser på sosialrettens område
Brudd på plikt til å betale skatter
Brudd på plikt til å betale trygdeavgifter
Deltakelse i en kriminell organisasjon
Direkte eller indirekte deltakelse i forberedelsen av denne anskaffelsen
Eiendeler under administrasjon av bobestyrer
Forretningsvirksomheten er suspendert
Grov yrkesfeil
Hvitvasking eller terrorfinansiering
Insolvens
Interessekonflikt på grunn av deltakelse i anskaffelsesprosedyren
Konkurs
Korrupsjon
Terrorhandlinger eller handlinger knyttet til terrorvirksomhet
Tidlig oppsigelse, erstatning eller andre tilsvarende sanksjoner
Tilsvarende situasjon som konkurs, insolvens eller akkord etter nasjonal rett
Uriktige opplysninger, tilbakeholdt informasjon, manglende evne til å fremlegge nødvendige dokumenter, eller å ha skaffet seg fortrolige opplysninger om denne anskaffelsesprosedyren
Beskrivelse av utelukkelsesgrunner:
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory…
… body or has the competence to represent or control or make decisions in such bodies, in the event a enforceable verdict has been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, Involving European Communities or European Union Member States (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier.
… body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted of fraud has been convicted of fraud by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Fraud included in Article 1 of the Convention on protection of the Financial Interests of the European Communities (EFT C 316 of 27.11.1995, p. 48).
… body or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of money laundering or financing terrorism by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Money laundering or financing terrorism As defined in Article 1 of the European Parliament and Council Directive 2005/60/EF of 26 October 2005 on preventive measures against the use of the financial system for money laundering and financing terrorism (EUT L 309 of 25.11.2005, p. 15).
… body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted verdict of participation in a criminal organisation by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Participation in a criminal organisation as defined in Article 2 of the Council ́s framework decision 2008/841/RIA of 24 October 2008 on control of organised crime (EUT L 300 of 11.11.2008, p. 42)
… body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.
… body or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of child labour and other forms of human trafficking by a verdict handed down no more than five years ago, or a rejection period determined directly in the judgement that still applies? Child labour and other forms of human trafficking as defined in Article 2 of the European Parliament and council directive 2011/36/EU of 5. 1 April 2011 on the prevention and control of human trafficking and the protection of its victims and for compensation of the Council ́s framework decision 2002/629/RIA (EUT L 101 of 15.4.2011, p. 1).
Is the tenderer aware of breaches of environmental provisions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Is the tenderer aware of breaches of provisions on…
… working conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
… social conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Has the tenderer entered into agreement(s) with other tenderers with the intention of turning the competition?
Has the tenderer committed serious errors in professional practice? If relevant, see the definitions in national law, the relevant notice or procurement documents.
Have the tenderer:a) given grossly incorrect information when notifying the information required to verify that there is no basis for rejection, or of the qualification requirements being met,b) failed to provide such information,c) subject to immediately submitting the supporting documents requested by the Contracting Authority, ord) improperly affecting the Contracting Authority's decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award?
Have the tenderer:a) given grossly incorrect information when notifying the information required to verify that there is no basis for rejection, or of the qualification requirements being met,b) failed to provide such information,c) subject to immediately submitting the supporting documents requested by the Contracting Authority, ord) improperly affecting the Contracting Authority's decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award?
Are tenderers aware of a conflict of interest as stated in national law, the relevant notice or procurement documents?
Has the tenderer or an entity associated with the supplier advised the contracting authority or in another way been involved in the planning of the competition?
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
The contracting authority shall state that in Norway there are national rejection reasons. These shall be described in the procurement documents. Tenderers must respond to whether they are in one or more of the situations described in the national rejection reasons. Will the purely national rejection reasons, as stated in the relevant notice or in the procurement documents, apply?
The contracting authority shall state that in Norway there are national rejection reasons. These shall be described in the procurement documents. Tenderers must respond to whether they are in one or more of the situations described in the national rejection reasons. Will the purely national rejection reasons, as stated in the relevant notice or in the procurement documents, apply?
Have tenderers failed to fulfil all their social security obligations in the country where they are established and in their member state, if this is a different country than what he is established in?
Has the tenderer not fulfilled his tax and duty obligations in the country in which he is established, and in the contracting authority's member state, if this is a different country than what he is established in?
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Utfyllende informasjon Klageinstans
Navn: Oslo Tingrett
Nasjonalt registreringsnummer: 926725939
Postnummer: 0125
Poststed: Oslo
Region: Oslo
🏙️
Land: Norge 🇳🇴 Klageprosedyre
Presis informasjon om frister for klageprosedyrer: See the tender documentation
Informasjon om elektroniske arbeidsflyter
Elektronisk fakturering vil bli akseptert
Kilde: OJS 2025/S 100-336678 (2025-05-23)
Kunngjøring av konkurranse (2025-06-16) Prosedyre Anbudsvilkår
Frist for å be om tilleggsinformasjon: 2025-06-18 10:00:00 📅
Endringer Tekst som skal korrigeres i den opprinnelige kunngjøringen
Seksjonsnummer: PROCEDURE
Identifikasjonsnummer for delkontrakt: LOT-0000 Annen tilleggsinformasjon
Amended deadline for asking questions from 16.06. 2025, 12.00 to 18.06.2025, 12.00
Hovedårsak til endring: Informasjon oppdatert
Informasjon om endringer
Identifikator for endret kunngjøringsversjon: 0d966ff7-8de4-4031-b063-21794a0b412f-01
Kilde: OJS 2025/S 114-389402 (2025-06-16)