Brief main elements of the assignment, but not exhaustively are: Here the name is brief and not exhaustive: Demolition and removal of stores/carport/workshop/garage with the accompanying technical facilities, parts of the retaining wall and some other minor building parts in/by technical central F Establishment of a pipe wall that is preparing for a construction pit for F2Phases alterations to road installations and the establishment of partially time-limited and partially permanent road installations around future buildings F2- Establishment of a new Water and Sewage facility for F2. handling surface water and time limited installations, Alteration and alteration of supply installations for medical gases, including conducive roads, Facility technical and construction auxiliary works for high voltage (electricity for the main project) Testing, commissioning, in the use of altered/new technical installations and infrastructure.
Frist
Fristen for mottak av tilbud var 2025-07-01.
Anskaffelsen ble publisert 2025-05-23.
Kunngjøring av konkurranse (2025-05-23) Gjenstand Anskaffelsens omfang
Tittel: Contract 7042 Road north of F2 and Q site, limited time - New Rikshospitalet
Referansenummer: NRH-7042-25-0001
Kort beskrivelse:
“Brief main elements of the assignment, but not exhaustively are: Here the name is brief and not exhaustive: Demolition and removal of...”
Kort beskrivelse
Brief main elements of the assignment, but not exhaustively are: Here the name is brief and not exhaustive: Demolition and removal of stores/carport/workshop/garage with the accompanying technical facilities, parts of the retaining wall and some other minor building parts in/by technical central F Establishment of a pipe wall that is preparing for a construction pit for F2Phases alterations to road installations and the establishment of partially time-limited and partially permanent road installations around future buildings F2- Establishment of a new Water and Sewage facility for F2. handling surface water and time limited installations, Alteration and alteration of supply installations for medical gases, including conducive roads, Facility technical and construction auxiliary works for high voltage (electricity for the main project) Testing, commissioning, in the use of altered/new technical installations and infrastructure.
Vis mer
Kontrakttype: Bygge- og anleggsarbeid
Produkter/tjenester: Grunnarbeid i forbindelse med anlegg av veier, gater og gangstier📦 Beskrivelse
Beskrivelse av anskaffelsen:
“Brief main elements of the assignment, but not exhaustively are: Here the name is brief and not exhaustive: Demolition and removal of...”
Beskrivelse av anskaffelsen
Brief main elements of the assignment, but not exhaustively are: Here the name is brief and not exhaustive: Demolition and removal of stores/carport/workshop/garage with the accompanying technical facilities, parts of the retaining wall and some other minor building parts in/by technical central F Establishment of a pipe wall that is preparing for a construction pit for F2Phases alterations to road installations and the establishment of partially time-limited and partially permanent road installations around future buildings F2- Establishment of a new Water and Sewage facility for F2. handling surface water and time limited installations, Alteration and alteration of supply installations for medical gases, including conducive roads, Facility technical and construction auxiliary works for high voltage (electricity for the main project) Testing, commissioning, in the use of altered/new technical installations and infrastructure.
Prosedyre Prosedyretype
Åpen anbudskonkurranse ✅ Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2025-07-01 10:00:00 📅
Vilkår for åpning av tilbud: 2025-07-01 10:00:00 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Minste tidsramme som tilbyderen må opprettholde tilbudet i: 6
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Liste og kort beskrivelse av regler og kriterier:
“For financial key figures stated in the notice or in the procurement documents, the tenderer declares that the actual value(s) of the requested key figures...”
Liste og kort beskrivelse av regler og kriterier
For financial key figures stated in the notice or in the procurement documents, the tenderer declares that the actual value(s) of the requested key figures are as follows:
Minimum qualification requirements
Economy
Tenderers shall have sufficient economic and financial capacity to fulfil the contractual obligations.
The contracting authority will undertake an overall assessment of whether the qualification requirement is fulfilled. Documentation requirement: A credit rating based on the most recent available accounting figures. The credit rating must not be older than six months calculated from the deadline for receipt of tenders. The rating shall be carried out by a credit rating company with licence to conduct this service.
Tenderers shall submit annual accounts for the last 3 years.
The contracting authority reserves the right to obtain a credit report in order to verify that the tenderer fulfils the requirement.
If the tenderer has a justifiable reason for not submitting the documentation that the Builder has demanded, he can document his economic and financial capacity by presenting any other document that the Builder deems suitable.
Vis mer
Liste og kort beskrivelse av regler og kriterier:
“Regarding any other economic and financial requirements that have been stated in the notice or in the procurement documents, the tenderer declares...”
Liste og kort beskrivelse av regler og kriterier
Regarding any other economic and financial requirements that have been stated in the notice or in the procurement documents, the tenderer declares that:
Minimum qualification requirements
Tax and duties
Tenderers shall have their tax and VAT payments in order. Documentation requirement: Tax and VAT certificate, not older than 6 months calculated from the deadline for submitting a tender. Tenderers with offices in other EEA countries shall submit certificates or other legal documentation in accordance with EEA public procurement regulations. Other international tenderers shall submit equivalent documentation.
Vis mer
Liste og kort beskrivelse av regler og kriterier:
“Only for public building and construction works: During the reference period the tenderer has carried out the following work of the requested type. The...”
Liste og kort beskrivelse av regler og kriterier
Only for public building and construction works: During the reference period the tenderer has carried out the following work of the requested type. The contracting authority can require up to five years experience and allow experience from the previous five years to be taken into consideration.
Minimum qualification requirements
Experience
Tenderers shall have sufficient relevant experience.
Documentation requirement: Relevant reference projects in the last 8 years must be described.
The following account shall be included in the description of each reference project that the tenderer would like to plead:
• The tenderer ́s role (main or sub-supplier)
• The central work assignments in the contract
• The size of the contract, measured in NOK
• The contract period
The description of each reference project shall be in a separate form, cf. Annex 2.
The builder will undertake a total assessment of the submitted reference project from the tenderer and from any sub-suppliers that the tenderer has relied on, cf. point 5.3.
Vis mer
Liste og kort beskrivelse av regler og kriterier:
“Can tenderers submit certificates issued by independent bodies that document that the tenderer fulfils the stated quality assurance standards, including...”
Liste og kort beskrivelse av regler og kriterier
Can tenderers submit certificates issued by independent bodies that document that the tenderer fulfils the stated quality assurance standards, including universal design requirements?
Minimum qualification requirements
Quality Assurance System
The tenderer shall have a suitable and implemented quality assurance system. Documentation requirement: A general account of the tenderer ́s quality system as well as a copy of the table of contents. The account shall be on approx. two sides.
If a tenderer is certified in accordance with ISO 9001 or equivalent certification schemes, it will be sufficient to fulfil the requirement.
Vis mer
Liste og kort beskrivelse av regler og kriterier:
“Is the tenderer able to submit certificates issued by independent bodies as documentation that the tenderer fulfils the stated environmental management...”
Liste og kort beskrivelse av regler og kriterier
Is the tenderer able to submit certificates issued by independent bodies as documentation that the tenderer fulfils the stated environmental management systems or standards?
Minimum qualification requirements
Environmental management system
Tenderers shall have a suitable and implemented system for environmental management. Documentation requirement: A general account of the tenderer's system for ensuring that the service is carried out in accordance with environmentally relevant requirements in the contract, as well as a copy of the table of contents. The account shall be on approx. three sides.
If the tenderer is certified in accordance with ISO 14001:2015, Miljøfyrtårnet [The Environmental Lighthouse] or equivalent certification schemes, this will be sufficient to fulfil the requirement.
Utfyllende informasjon Klageinstans
Navn: Oslo Tingrett
Nasjonalt registreringsnummer: 926725939
Postnummer: 0125
Poststed: Oslo
Region: Oslo🏙️
Land: Norge 🇳🇴 Klageprosedyre
Presis informasjon om frister for klageprosedyrer:
“See the tender documentation” Informasjon om elektroniske arbeidsflyter
Elektronisk fakturering vil bli akseptert
Elektronisk bestilling vil bli brukt
Elektronisk betaling vil bli brukt
Kilde: OJS 2025/S 100-336678 (2025-05-23)
Kunngjøring av konkurranse (2025-06-16)
Endringer Annen tilleggsinformasjon
“Amended deadline for asking questions from 16.06. 2025, 12.00 to 18.06.2025, 12.00”
Kilde: OJS 2025/S 114-389402 (2025-06-16)