The project includes several pipeline stretches in the municipality. The project shall renovate the existing water pipelines mainly by blocking out, and new water pipelines/wastewater pipelines/AF pipelines/surface water pipelines shall be laid when excavating. Some pipeline stretches that go over private property shall be redeveloped. The project covers several pipeline stretches that must be renovated due to various reasons. The stretches are selected based on, among other things, rupture frequency, age and dimension. The existing pipeline installations are mainly from the years 1915-1930. New ditches shall be dug, new wastewater and surface water pipelines will also be laid. Some pipeline stretches that go over private property shall be redeveloped. This involves considerable excavation work inside private properties, as new service pipes must be laid up to the current drilling point. In some places this can be solved by pulling new service pipes into the water pipeline that is laid down. Most water manholes shall be replaced with prefabricated systems. In addition, if new water manholes replace the existing water manholes with a gutter system, a separate wastewater manhole is to be put down. When blocking out, pull with an overhead pipe to service pipes together with the new water pipeline. The main rule is that all service pipes shall be connected to the water manhole and there shall not be buried anchorages. Where, for various reasons, it is very far from the service line to the nearest water manhole, or it is difficult to lead the service pipes to water manholes, a double pipe can be drilled or set double-blown with a thread-free outlet on a pipeline. In such cases a simple service pipe foam is to be put without a bottom around the pipeline and the anchorage, so that the anchorage is available. Several service pipes can be carried to such a manhole. See PART 2 Contract documentation for detailed information on the project.
Frist
Fristen for mottak av tilbud var 2026-01-30.
Anskaffelsen ble publisert 2025-11-24.
Kunngjøring av konkurranse (2025-11-24) Gjenstand Anskaffelsens omfang
Tittel: 1001386 Ramstadåsveien and others (Plant 1845)
Referansenummer: 2025/5603
Kort beskrivelse:
“The project includes several pipeline stretches in the municipality. The project shall renovate the existing water pipelines mainly by blocking out, and new...”
Kort beskrivelse
The project includes several pipeline stretches in the municipality. The project shall renovate the existing water pipelines mainly by blocking out, and new water pipelines/wastewater pipelines/AF pipelines/surface water pipelines shall be laid when excavating. Some pipeline stretches that go over private property shall be redeveloped. The project covers several pipeline stretches that must be renovated due to various reasons. The stretches are selected based on, among other things, rupture frequency, age and dimension. The existing pipeline installations are mainly from the years 1915-1930. New ditches shall be dug, new wastewater and surface water pipelines will also be laid. Some pipeline stretches that go over private property shall be redeveloped. This involves considerable excavation work inside private properties, as new service pipes must be laid up to the current drilling point. In some places this can be solved by pulling new service pipes into the water pipeline that is laid down. Most water manholes shall be replaced with prefabricated systems. In addition, if new water manholes replace the existing water manholes with a gutter system, a separate wastewater manhole is to be put down. When blocking out, pull with an overhead pipe to service pipes together with the new water pipeline. The main rule is that all service pipes shall be connected to the water manhole and there shall not be buried anchorages. Where, for various reasons, it is very far from the service line to the nearest water manhole, or it is difficult to lead the service pipes to water manholes, a double pipe can be drilled or set double-blown with a thread-free outlet on a pipeline. In such cases a simple service pipe foam is to be put without a bottom around the pipeline and the anchorage, so that the anchorage is available. Several service pipes can be carried to such a manhole. See PART 2 Contract documentation for detailed information on the project.
Vis mer
Kontrakttype: Bygge- og anleggsarbeid
Produkter/tjenester: Deler av eller komplette byggekonstruksjoner samt anleggsarbeider📦 Beskrivelse
Beskrivelse av anskaffelsen:
“The project includes several pipeline stretches in the municipality. The project shall renovate the existing water pipelines mainly by blocking out, and new...”
Beskrivelse av anskaffelsen
The project includes several pipeline stretches in the municipality. The project shall renovate the existing water pipelines mainly by blocking out, and new water pipelines/wastewater pipelines/AF pipelines/surface water pipelines shall be laid when excavating. Some pipeline stretches that go over private property shall be redeveloped. The project covers several pipeline stretches that must be renovated due to various reasons. The stretches are selected based on, among other things, rupture frequency, age and dimension. The existing pipeline installations are mainly from the years 1915-1930. New ditches shall be dug, new wastewater and surface water pipelines will also be laid. Some pipeline stretches that go over private property shall be redeveloped. This involves considerable excavation work inside private properties, as new service pipes must be laid up to the current drilling point. In some places this can be solved by pulling new service pipes into the water pipeline that is laid down. Most water manholes shall be replaced with prefabricated systems. In addition, if new water manholes replace the existing water manholes with a gutter system, a separate wastewater manhole is to be put down. When blocking out, pull with an overhead pipe to service pipes together with the new water pipeline. The main rule is that all service pipes shall be connected to the water manhole and there shall not be buried anchorages. Where, for various reasons, it is very far from the service line to the nearest water manhole, or it is difficult to lead the service pipes to water manholes, a double pipe can be drilled or set double-blown with a thread-free outlet on a pipeline. In such cases a simple service pipe foam is to be put without a bottom around the pipeline and the anchorage, so that the anchorage is available. Several service pipes can be carried to such a manhole. See PART 2 Contract documentation for detailed information on the project.
Prosedyre Prosedyretype
Åpen anbudskonkurranse ✅ Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2026-01-30 11:00:00 📅
Vilkår for åpning av tilbud: 2026-01-30 11:00:00 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Minste tidsramme som tilbyderen må opprettholde tilbudet i: 71
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Hovedfinansieringsvilkår og betalingsordninger og/eller henvisning til relevante bestemmelser som regulerer dem:
“NS 8407:2011, with the alterations and supplements in
part 2.” Vilkår knyttet til kontrakten
Vilkår for kontraktoppfyllelse:
“NS 8407:2011, with the alterations and supplements in
part 2.”
Utfyllende informasjon Klageinstans
Navn: Asker og Bærum tingrett
Nasjonalt registreringsnummer: 926725963
Postadresse: Malmskriverveien 2
Postnummer: 1337
Poststed: Sandvika
Region: no084 🏙️
Land: Norge 🇳🇴
E-post: taobpost@domstol.no📧
Telefon: 67 57 65 00📞
URL: https://www.domstol.no/no/domstoler/tingrett/asker-og-baerum-tingrett/🌏 Klageprosedyre
Presis informasjon om frister for klageprosedyrer:
“FOR § 16-5.Deadline for request for temporary injunction
(1) In a restricted tender contest, negotiated procedure after a prior notice, competition for...”
Presis informasjon om frister for klageprosedyrer
FOR § 16-5.Deadline for request for temporary injunction
(1) In a restricted tender contest, negotiated procedure after a prior notice, competition for innovation partnership or competitive dialogue, the contracting authority can set a deadline for a petition for a temporary injunction against the contracting authority ́s decision to reject a request to participate in the competition, cf. § 20-1 and § 20-2, or not select a tenderer, cf. § 12-7, must be put before the district court.
(2) The deadline shall be at least 15 days calculated from the day after the contracting authority sends out a notification in accordance with § 20-10 third paragraph or § 12-7 fourth paragraph.
Vis mer Informasjon om elektroniske arbeidsflyter
Elektronisk fakturering vil bli akseptert
Elektronisk betaling vil bli brukt
Kilde: OJS 2025/S 230-792460 (2025-11-24)