Replacement of bowling facility in Hitrahallen

Hitra kommune

Hitra municipality owns the current bowling alley, of which the operation is carried out by Hitrahallen SA. The current bowling equipment is characterised by many errors at the facility and is therefore ripe for replacement. The contracting authority would like tenders for both Stringpin machines and Free-fall machines, including installation and training. Tenders are wanted for the following: Free fall forcepsPin deck lightningDivision lightning systemScoring system with screensBall returns station (3 items) Service/repairs on automatic bumper rails on all lanes (6 lanes) Lane machineDivisions & Capping. 6 lanes. Colour black.3 ball storage rack, colour topplate: black. Minimum capacity for 80 bowling balls.2 ball ramp. Colour: black. The contracting authority would like price offers on both Stringpin machines and Free-fall machines, and the Contracting Authority decides which type of these two will be chosen in the end. If a tenderer only offers one of the alternatives, it is ok. Tenderers shall assemble new equipment themselves, and all current equipment that is replaced shall be disassembled by the supplier. Stringpin machines must be certified for tournaments (USCB certified).

Frist

Fristen for mottak av tilbud var 2024-06-14. Anskaffelsen ble publisert 2024-05-09.

Hvem? Hva? Hvor?
Anskaffelseshistorikk
Dato Dokument
2024-05-09 Kunngjøring av konkurranse
Kunngjøring av konkurranse (2024-05-09)
Gjenstand
Anskaffelsens omfang
Tittel: Replacement of bowling facility in Hitrahallen
Referansenummer: 2024/2377
Kort beskrivelse:
Hitra municipality owns the current bowling alley, of which the operation is carried out by Hitrahallen SA. The current bowling equipment is characterised by many errors at the facility and is therefore ripe for replacement. The contracting authority would like tenders for both Stringpin machines and Free-fall machines, including installation and training. Tenders are wanted for the following: Free fall forcepsPin deck lightningDivision lightning systemScoring system with screensBall returns station (3 items) Service/repairs on automatic bumper rails on all lanes (6 lanes) Lane machineDivisions & Capping. 6 lanes. Colour black.3 ball storage rack, colour topplate: black. Minimum capacity for 80 bowling balls.2 ball ramp. Colour: black. The contracting authority would like price offers on both Stringpin machines and Free-fall machines, and the Contracting Authority decides which type of these two will be chosen in the end. If a tenderer only offers one of the alternatives, it is ok. Tenderers shall assemble new equipment themselves, and all current equipment that is replaced shall be disassembled by the supplier. Stringpin machines must be certified for tournaments (USCB certified).
Vis mer
Kontrakttype: Varer
Produkter/tjenester: Golf- og bowlingutstyr 📦
Beskrivelse
Intern identifikator: 2024/2377
Denne anskaffelsen er også egnet for små og mellomstore bedrifter (SMB)
Tilleggsprodukter/-tjenester: Postadresse: Skolegata 13
Postnummer: 7240
By: Hitra
Land: Norge 🇳🇴
Utførelsessted: Trøndelag 🏙️
Varighet
Startdato: 2024-08-12 📅
Sluttdato: 2024-12-31 📅
Tildelingskriterier
Pris
Pris (vekting): 60
Kvalitetskriterium (navn): The quality criterium is based on several sub-points and the score here will be a total assessment of these. Emphasis will be put on the following: - Quality of the equipment (robustness, service interval, guarantee) - User friendliness for employees/operational personnel - Training plan for employees - Delivery and assembly time - ready for use - Environment and sustainability in the production phase and freight process.
Kvalitetskriterium (vekting): 40
Tittel
Identifikasjonsnummer for delkontrakt: LOT-0000

Prosedyre
Prosedyretype
Åpen anbudskonkurranse
Rettslig grunnlag: Direktiv 2014/24/EU
Hovedtrekk ved prosedyren:
The procurement will be carried out in accordance with the Public Procurement Act of 17 June 2016 (LOA) and the Public Procurement Regulations (FOA) dated 12 August 2016, part I and part III. The contract will be awarded in accordance with the 'Open Tender Contest' procedure, cf. FOA § 13-1 (1). Negotiations are not allowed in this competition. Tenders cannot, therefore, be changed after the tender deadline has expired. Furthermore, attention is agreed that tenders that include significant deviations from the procurement documents shall be rejected in accordance with the Public Procurement Regulations § 24-8(1) b. The contracting authority can reject tenders that include deviations from the procurement documents, uncertainties etc., which must not be considered insignificant, cf. The regulations § 24-8(2) a.Tenderers are therefore strongly encouraged to follow the instructions given in this tender documentation with annexes and possibly to question uncertainties via the contracting authority ́s KGV. Tenders shall be prepared in accordance with the guidelines given in this tender documentation with annexes, and submitted electronically by using the contracting authority ́s KGV. According to the Contracting Authority's assessment, the competition has a limited impact on the environment, and cf. § 7-9 fifth section of the procurement regulation, we believe that this is a procurement that has a "climate footprint and an environmental impact that is immaterial". The contracting authority has nevertheless chosen to include a sub-point under the award criterion "quality", where the tenderer shall describe where the goods are produced and how they are intended to be transported to the delivery place. The sub-criterion is one of several under the quality criterion.
Vis mer
Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2024-06-14 10:00:00 📅
Vilkår for åpning av tilbud: 2024-06-14 10:15:00 📅
Vilkår for åpning av tilbud (sted): Fillan, Hitra
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Minste tidsramme som tilbyderen må opprettholde tilbudet i: 3 måneder
Anbudsvilkår
Tilbydere kan levere mer enn ett tilbud
Avansert eller kvalifisert elektronisk signatur eller segl (som definert i forordning (EU) nr. 910/2014) er påkrevd
Åpningsdato: 2024-06-14 10:15:00 📅
Sted: Fillan, Hitra
Elektronisk fakturering: Påkrevd
Elektronisk bestilling vil bli brukt
Elektronisk betaling vil bli brukt
Frist for å be om tilleggsinformasjon: 2024-06-07 10:00:00 📅
Tilleggsinformasjon:
The contracting authority can, in accordance with the Public Procurement Regulations § 23-5, request documentation to clarify the conditions of the tender. However, this information cannot lead to an improvement of the original tender.
Tildelingskriterier
Vekttype: Vekting (prosent, eksakt)

Juridisk, økonomisk, finansiell og teknisk informasjon
Økonomisk og finansiell stilling
Liste og kort beskrivelse av utvelgelseskriterier:
'Total' annual turnover: The tenderer ́s ("total") annual turnover for the number of financial years requested in the tender notice or in the procurement documents is as follows:
Average annual turnover: The tenderer ́s average annual turnover for the number of years requested in the notice or in the procurement documents is as follows:
"Specific annual turnover": Are the tenderer's ("specific") annual turnover within the area that the contract applies to and specified in the notice or in the procurement documents for the number of accounting years requested is as follows:
Average set-up: Is the tenderer's average annual turnover within the area requested by the contract and specified in the notice or in the procurement documents for the number of financial years requested:
The tenderer's establishment date: If the information about the turnover (combined or specific) is not available for the entire requested period, please state the date the company was established, or the tenderers started their business:
Financial key figures: For financial key figures stated in the notice or in the procurement documents, the tenderer declares that the actual value(s) of the requested key figures are as follows:
Liability insurance: The insured amount in the tenderer ́s liability insurance is the following:
Other economic and financial requirements: Regarding any other economic and financial requirements that have been stated in the notice or in the procurement documents, the tenderer declares that:
Tenderers shall have their tax and VAT payments in order.: Documentation requirement: • Tax certificate (RF-1244 determined by the Norwegian Tax Administration), i.e. certificate from the chief municipal treasurer for paid tax/payroll tax/VAT, where the tenderer has his main office. The certificate must not be more than six months old. Minimum qualification requirements
Vis mer
Tenderers must have sufficient economic and financial capacity to be able to fulfil the contract. Creditworthiness with no requirement for collateral will be sufficient to meet the requirement.: Documentation requirement: • A credit rating based on the most recent financial figures. The rating shall be carried out by a credit rating company with licence to conduct this service. Minimum qualification requirements
Vis mer
Vilkår for deltakelse
Liste og kort beskrivelse av regler og kriterier:
Certificates issued by independent bodies for
quality assurance standards.: Can tenderers submit certificates issued by independent bodies that document that the tenderer fulfils the stated quality assurance standards, including universal design requirements?
environmental management standards.: Is the tenderer able to submit certificates issued by independent bodies as documentation that the tenderer fulfils the stated environmental management systems or standards?
Liste og kort beskrivelse av vilkår:
Registered in a trade register: Tenderers are registered in a professional register in the member state in which the tenderer is established. As described in annex XI of directive 2014/24/EU; suppliers from certain member states may have to fulfil other requirements in the mentioned annex.
Vis mer
Registered in a trade register or company register.: Tenderers are registered in a company register or a trade register in the member state in which the tenderer is established. As described in annex XI of directive 2014/24/EU; suppliers from certain member states may have to fulfil other requirements in the mentioned annex.
Vis mer
Tenderers shall be a legally established company.: Documentation requirement: • Norwegian tenderers shall present an updated Company Registration Certificate. • Foreign tenderers shall provide certificates(s) of statutory registration in the country where the business is established.
Vis mer
Tenderers shall submit a HSE self-declaration.: Documentation requirement: • HSE self-declaration in accordance with the public procurement regulations. Annex D - HSE self-declaration shall be signed.
Tenderers must be able to sign Hitra municipality ́s self-declaration on ethical guidelines, serious and decent working life, wages and working conditions.: Documentation requirement: • Signed self-declaration on wages and working conditions (annex E). • Signed self-declaration regarding serious and decent working life (Annex F) • Signed self-declaration for suppliers to Hitra municipality (Annex G).
Vis mer
Teknisk og faglig kapasitet
Liste og kort beskrivelse av utvelgelseskriterier:
Only for public goods deliveries: Only for public goods deliveries: In the reference period, the tenderer has carried out the following important deliveries of the requested type, or the following important services of the requested type. The contracting authority can require up to three years experience and allow experience from the previous three years to be taken into consideration.
Vis mer
Technical personnel or technical units: Tenderers can use the following technical personnel or technical units , particularly those who are responsible for quality control: For technical personnel or technical units that do not directly belong to the tenderer ́s business, but if the capacity the tenderer will use, cf. part II, section C, separate ESPD forms shall be supplemented.
Vis mer
Technical facilities and quality assurance measures: The tenderer utilises the following technical facilities and quality assurance measures and the tenderer ́s survey and research facility is as follows:
Investigation and research facilities: The tenderer ́s survey and research facilitates are as follows:
Management and tracing of the supply chain: The tenderer will be able to use the following management of the supply chain and tracing systems for the execution of the contract:
Control Permission: For goods or services that are complicated, or that in exceptional cases shall be used for a particular purpose: Will the tenderer allow checks of the tenderer's production capacity or technical capacity and, where necessary, of the survey and research facilities that the tenderer has at its disposal and of quality control measures? The inspections shall be undertaken by the contracting authority or the contracting authority can leave it to a competent public body in the country where the tenderer is established.
Vis mer
Education and professional qualifications: The following education and professional qualifications are possessed by the tenderer and/or (depending on the requirements set in the notice or in the procurement documents) of the leading employees:
Environmental management measures: Tenderers can employ the following environmental management measures in connection with the execution of the contract:
Number of employees in the management: The tenderer ́s number of employees in the management during the last three years was as follows:
Average workforce: The tenderer's average annual workforce in the last three years has been as follows:
Tools, materials and technical equipment.: Tenderers can use the following tools, material and technical equipment to carry out the contract:
Portion of the contract to sub-suppliers.: The tenderer is considering to outsource the following part (as a percentage) of the contract to sub-suppliers. Note that if the tenderer has decided to outsource a part of the contract to sub-suppliers and will use the sub-suppliers ́ capacity to carry out this part, a special ESPD will be supplemented for such sub-suppliers, see part II, section C, above.
Vis mer
Procurement of goods: Requested samples, descriptions or photographs
that do not need to be accompanied by certificates that they are genuine.: Procurement of goods: The tenderer presents supplies that shall be delivered, requested samples, descriptions or photographs, which do not need to be accompanied by certificates that they are genuine.
with certificates.: When procurement of goods: If requested, the tenderer further declares that they will deliver the requested certificates that they are genuine.
When procuring goods: Certificates issued by official bodies for quality control: Can tenderers submit the requested certificates issued by official bodies for quality control, and who can confirm that the goods, which are clearly identified by reference to technical specifications or standards, as determined in the notice or in the procurement documents, are in accordance with these?
Vis mer
Tenderers shall refer to similar deliveries previously.: Documentation requirement: • Description of what was delivered (scope), name of the contracting authority/customer and date of delivery. (Reference persons can be requested by Hitra municipality if needed). Minimum qualification requirements
Vis mer
Vilkår for deltakelse
Utestengelsesgrunn:
Barnearbeid og andre former for menneskehandel
Bedrageri
Betaling av skatter
+ 5 til
Betaling av trygdeavgifter
Deltakelse i en kriminell organisasjon
Hvitvasking eller terrorfinansiering
Korrupsjon
Terrorhandlinger eller handlinger knyttet til terrorvirksomhet
Beskrivelse av utelukkelsesgrunner:
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies,
in the event a enforceable verdict has been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, Involving European Communities or European Union Member States (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier.
at the time a legally convicted verdict of participation in a criminal organisation by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Participation in a criminal organisation as defined in Article 2 of the Council ́s framework decision 2008/841/RIA of 24 October 2008 on control of organised crime (EUT L 300 of 11.11.2008, p. 42)
in the event a legal verdict has been convicted of money laundering or financing terrorism by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Money laundering or financing terrorism As defined in Article 1 of the European Parliament and Council Directive 2005/60/EF of 26 October 2005 on preventive measures against the use of the financial system for money laundering and financing terrorism (EUT L 309 of 25.11.2005, p. 15).
at the time a legally convicted of fraud has been convicted of fraud by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Fraud included in Article 1 of the Convention on protection of the Financial Interests of the European Communities (EFT C 316 of 27.11.1995, p. 48).
in the event a legal verdict has been convicted of child labour and other forms of human trafficking by a verdict handed down no more than five years ago, or a rejection period determined directly in the judgement that still applies? Child labour and other forms of human trafficking as defined in Article 2 of the European Parliament and council directive 2011/36/EU of 5. 1 April 2011 on the prevention and control of human trafficking and the protection of its victims and for compensation of the Council ́s framework decision 2002/629/RIA (EUT L 101 of 15.4.2011, p. 1).
Have tenderers failed to fulfil all their social security obligations in the country where they are established and in their member state, if this is a different country than what he is established in?
Has the tenderer not fulfilled his tax and duty obligations in the country in which he is established, and in the contracting authority's member state, if this is a different country than what he is established in?
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.
Vis mer

Oppdragsgiver
Navn og adresser
Navn: Hitra Kommune
Nasjonalt registreringsnummer: 938772924
Postadresse: Rådhusveien 1
Postnummer: 7240
Poststed: Hitra
Land: Norge 🇳🇴
Kontaktpunkt: Emil Melting
E-post: emil.melting@hitra.kommune.no 📧
Telefon: +47 72441700 📞
Faks: +47 71441790 📠
URL: http://www.hitra.kommune.no 🌏
Type oppdragsgiver
Offentligrettslig organ
Hovedaktivitet
Alminnelige offentlige tjenester
Kommunikasjon
URL for dokumenter: https://permalink.mercell.com/229259913.aspx 🌏
Deltakelses-URL: https://permalink.mercell.com/229259913.aspx 🌏
Dokument-ID for skattelovgivning: FiscalDocID1
Dokument-ID for miljølovgivning: EnvDocID1
Dokument-ID for arbeidslovgivning: EmplDocID1
Språk for anskaffelsesdokumentet: norsk 🗣️
Elektronisk innsending: Påkrevd

Utfyllende informasjon
Organ ansvarlig for meklingsprosedyrer
Navn: Trøndelag tingrett
Nasjonalt registreringsnummer: 926722794
Postadresse: Postboks 2317 Torgarden
Postnummer: 7004
Poststed: Trondheim
Region: Trøndelag 🏙️
Land: Norge 🇳🇴
Kontaktpunkt: Emil Melting
E-post: emil.melting@hitra.kommune.no 📧
Telefon: 47615480 📞
Klageinstans
Samme som: Organ ansvarlig for meklingsprosedyrer
Tjeneste hvor informasjon om klageprosedyren kan innhentes
Samme som: Navn og adresser
Informasjon om elektroniske arbeidsflyter
Elektronisk fakturering vil bli akseptert
Kilde: OJS 2024/S 092-279442 (2024-05-09)