Oslobygg KF has been given the assignment by the Education Agency in Oslo to build an extension for Stovner school, as well as the development of the school ́s outdoor installations. The school site is 23.4 daa. The extension is approx. 3,365 m2 FUA (functional area) and approx. 5,570 m2 gross in three floors, the basement is partly below ground due to the terrain form. In addition various sheds of approx. 110 m2 shall be constructed. The contract includes the demolition of discontinued teaching pavilions, as well as two concrete wings from the original school building from 1970. In addition, light renovation of approx. 1,000 m2 of the original school building shall be carried out. The contract also includes improvements to public roads in Stovnerfaret within the planning area, as well as improvements to public roads in accordance with the order requirements, in Olaus Fjørtoftsvei and Fjellstuveien. The construction works shall be carried out with the school in operation in the original school building, as well as temporary pavilions in the open air area across Stovnerfaret. The framework application was sent 04.09.24 and expects a framework permission in November. The prerequisite for the project is that the project with temporary school pavilions at the neighbouring site has been completed and ready for use before the demolition can start. The site will be available from 01.06.25, with the share of the ground work being completed by the start of the school 15 August 2025. There will be several sub-deliveries, with the last hand over 11.08.27.
Frist
Fristen for mottak av tilbud var 2024-12-12.
Anskaffelsen ble publisert 2024-10-03.
Kunngjøring av konkurranse (2024-10-03) Gjenstand Anskaffelsens omfang
Tittel: Procurement of a turnkey contract for the construction of an extension, demolition and outdoor works for Stovner School.
Referansenummer: 24/6933
Kort beskrivelse:
Oslobygg KF has been given the assignment by the Education Agency in Oslo to build an extension for Stovner school, as well as the development of the school ́s outdoor installations. The school site is 23.4 daa. The extension is approx. 3,365 m2 FUA (functional area) and approx. 5,570 m2 gross in three floors, the basement is partly below ground due to the terrain form. In addition various sheds of approx. 110 m2 shall be constructed.
The contract includes the demolition of discontinued teaching pavilions, as well as two concrete wings from the original school building from 1970. In addition, light renovation of approx. 1,000 m2 of the original school building shall be carried out.
The contract also includes improvements to public roads in Stovnerfaret within the planning area, as well as improvements to public roads in accordance with the order requirements, in Olaus Fjørtoftsvei and Fjellstuveien.
The construction works shall be carried out with the school in operation in the original school building, as well as temporary pavilions in the open air area across Stovnerfaret.
The framework application was sent 04.09.24 and expects a framework permission in November. The prerequisite for the project is that the project with temporary school pavilions at the neighbouring site has been completed and ready for use before the demolition can start.
The site will be available from 01.06.25, with the share of the ground work being completed by the start of the school 15 August 2025. There will be several sub-deliveries, with the last hand over 11.08.27.
Oslobygg KF has been given the assignment by the Education Agency in Oslo to build an extension for Stovner school, as well as the development of the school ́s outdoor installations. The school site is 23.4 daa. The extension is approx. 3,365 m2 FUA (functional area) and approx. 5,570 m2 gross in three floors, the basement is partly below ground due to the terrain form. In addition various sheds of approx. 110 m2 shall be constructed.
The contract includes the demolition of discontinued teaching pavilions, as well as two concrete wings from the original school building from 1970. In addition, light renovation of approx. 1,000 m2 of the original school building shall be carried out.
The contract also includes improvements to public roads in Stovnerfaret within the planning area, as well as improvements to public roads in accordance with the order requirements, in Olaus Fjørtoftsvei and Fjellstuveien.
The construction works shall be carried out with the school in operation in the original school building, as well as temporary pavilions in the open air area across Stovnerfaret.
The framework application was sent 04.09.24 and expects a framework permission in November. The prerequisite for the project is that the project with temporary school pavilions at the neighbouring site has been completed and ready for use before the demolition can start.
The site will be available from 01.06.25, with the share of the ground work being completed by the start of the school 15 August 2025. There will be several sub-deliveries, with the last hand over 11.08.27.
Kontrakttype: Bygge- og anleggsarbeid
Produkter/tjenester: Bygge- og anleggsvirksomhet📦 Beskrivelse
Intern identifikator: 1
Postadresse: Stovnerfaret 17
Postnummer: 0982
By: Oslo
Utførelsessted: Oslo
🏙️ Varighet
Startdato: 2025-02-14 📅
Sluttdato: 2027-08-11 📅
Tildelingskriterier
Kostnadskriterium (navn): Price
Kostnadskriterium (vekting): 50
Kvalitetskriterium (navn): The offered personnel ́ competence and experience
Kvalitetskriterium (vekting): 20
Kvalitetskriterium (navn): Assignment comprehension
Kvalitetskriterium (vekting): 30
Tittel
Identifikasjonsnummer for delkontrakt: LOT-0000
Prosedyre Prosedyretype
Åpen anbudskonkurranse ✅
Rettslig grunnlag: Direktiv 2014/24/EU
Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2024-12-12 11:00:00 📅
Vilkår for åpning av tilbud: 2024-12-12 11:00:00 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️ Anbudsvilkår
Åpningsdato: 2024-12-12 11:00:00 📅
Elektronisk fakturering: Påkrevd
Elektronisk bestilling vil bli brukt ✅
Elektronisk betaling vil bli brukt ✅ Tildelingskriterier
Vekttype: Vekting (prosent, eksakt)
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Utestengelsesgrunn:
Akkord med kreditorer
Avtaler med andre økonomiske aktører som har til formål å vri konkurransen
Barnearbeid og andre former for menneskehandel
+ 20 til
Bedrageri
Betaling av skatter
Betaling av trygdeavgifter
Brudd på forpliktelser på arbeidsrettens område
Brudd på forpliktelser på miljørettens område
Brudd på forpliktelser på sosialrettens område
Deltakelse i en kriminell organisasjon
Direkte eller indirekte deltakelse i forberedelsen av denne anskaffelsen
Eiendeler under administrasjon av bobestyrer
Forretningsvirksomheten er suspendert
Hvitvasking eller terrorfinansiering
Insolvens
Interessekonflikt på grunn av deltakelse i anskaffelsesprosedyren
Konkurs
Korrupsjon
Situasjon tilsvarende konkurs etter nasjonal lovgivning
Skyldig i alvorlige feil i yrkesutøvelsen
Skyldig i uriktig fremstilling, tilbakeholdt informasjon, ute av stand til å fremlegge nødvendige dokumenter og innhentet konfidensiell informasjon om denne prosedyren
Terrorhandlinger eller handlinger knyttet til terrorvirksomhet
Tidlig heving, erstatning eller andre sammenlignbare sanksjoner
Beskrivelse av utelukkelsesgrunner:
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies,…
… in the event a enforceable verdict has been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, Involving European Communities or European Union Member States (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier.
… at the time a legally convicted verdict of participation in a criminal organisation by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Participation in a criminal organisation as defined in Article 2 of the Council ́s framework decision 2008/841/RIA of 24 October 2008 on control of organised crime (EUT L 300 of 11.11.2008, p. 42)
Has the tenderer entered into agreement(s) with other tenderers with the intention of turning the competition?
Is the tenderer aware of breaches of environmental provisions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies,…
… in the event a legal verdict has been convicted of money laundering or financing terrorism by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Money laundering or financing terrorism As defined in Article 1 of the European Parliament and Council Directive 2005/60/EF of 26 October 2005 on preventive measures against the use of the financial system for money laundering and financing terrorism (EUT L 309 of 25.11.2005, p. 15).
… at the time a legally convicted of fraud has been convicted of fraud by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Fraud included in Article 1 of the Convention on protection of the Financial Interests of the European Communities (EFT C 316 of 27.11.1995, p. 48).
… in the event a legal verdict has been convicted of child labour and other forms of human trafficking by a verdict handed down no more than five years ago, or a rejection period determined directly in the judgement that still applies? Child labour and other forms of human trafficking as defined in Article 2 of the European Parliament and council directive 2011/36/EU of 5. 1 April 2011 on the prevention and control of human trafficking and the protection of its victims and for compensation of the Council ́s framework decision 2002/629/RIA (EUT L 101 of 15.4.2011, p. 1).
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer aware of breaches of provisions on working conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Have the tenderer:a) given grossly incorrect information when notifying the information required to verify that there is no basis for rejection, or of the qualification requirements being met,b) failed to provide such information,c) subject to immediately submitting the supporting documents requested by the Contracting Authority, ord) improperly affecting the Contracting Authority's decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award?
Have the tenderer:a) given grossly incorrect information when notifying the information required to verify that there is no basis for rejection, or of the qualification requirements being met,b) failed to provide such information,c) subject to immediately submitting the supporting documents requested by the Contracting Authority, ord) improperly affecting the Contracting Authority's decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award?
Are tenderers aware of a conflict of interest as stated in national law, the relevant notice or procurement documents?
Has the tenderer or an entity associated with the supplier advised the contracting authority or in another way been involved in the planning of the competition?
Has the tenderer committed serious errors in professional practice? If relevant, see the definitions in national law, the relevant notice or procurement documents.
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
Is the tenderer aware of breaches of provisions on social conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Have tenderers failed to fulfil all their social security obligations in the country where they are established and in their member state, if this is a different country than what he is established in?
Has the tenderer not fulfilled his tax and duty obligations in the country in which he is established, and in the contracting authority's member state, if this is a different country than what he is established in?
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.
Utfyllende informasjon Klageinstans
Navn: Oslo Tingrett
Nasjonalt registreringsnummer: 926 725 939
Postadresse: C. J. Hambros plass 4
Postnummer: 0164
Poststed: Oslo
Land: Norge 🇳🇴
E-post: oslo.tingrett@domstol.no📧
Telefon: +47 22035200📞
URL: https://www.domstol.no/Enkelt-domstol/oslotingrett/🌏 Informasjon om elektroniske arbeidsflyter
Elektronisk fakturering vil bli akseptert
Kilde: OJS 2024/S 195-600104 (2024-10-03)
Kunngjøring av konkurranse (2024-11-26) Gjenstand Beskrivelse
Intern identifikator: 24/6933
Prosedyre Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2024-12-20 11:00:00 📅
Vilkår for åpning av tilbud: 2024-12-20 11:00:00 📅
Anbudsvilkår
Åpningsdato: 2024-12-20 11:00:00 📅
Endringer Tekst som skal korrigeres i den opprinnelige kunngjøringen
Identifikasjonsnummer for delkontrakt: LOT-0000 Informasjon om endringer
Identifikator for endret kunngjøringsversjon: 86dc3778-43fc-4802-a943-2dfcbef75537-01
Kilde: OJS 2024/S 232-726872 (2024-11-26)