In connection with the construction of the new Folkeparken school, a footpath between the school area and down towards the foot path in Folkeparken.Turveien shall be developed through rough terrain, with some filling and cutting. The walking route has a length of approx. 150 m and a width of 3 m including the shoulder. In addition there will be an area for masonry, railings and ditches and for cutting, fillings and blasting work. There will only be minor water and sewage measures on the stretch, such as drainage with drainage pipeline and drains/sand trap manholes. Road lighting shall be established along the foot path. See the attached competition documents for further information.
Frist
Fristen for mottak av tilbud var 2025-02-03.
Anskaffelsen ble publisert 2024-12-16.
Kunngjøring av konkurranse (2024-12-16) Gjenstand Anskaffelsens omfang
Tittel: KK - Execution contract - Folkeparken school - Turvei
Referansenummer: 24/06575
Kort beskrivelse:
In connection with the construction of the new Folkeparken school, a footpath between the school area and down towards the foot path in Folkeparken.Turveien shall be developed through rough terrain, with some filling and cutting. The walking route has a length of approx. 150 m and a width of 3 m including the shoulder. In addition there will be an area for masonry, railings and ditches and for cutting, fillings and blasting work. There will only be minor water and sewage measures on the stretch, such as drainage with drainage pipeline and drains/sand trap manholes. Road lighting shall be established along the foot path. See the attached competition documents for further information.
In connection with the construction of the new Folkeparken school, a footpath between the school area and down towards the foot path in Folkeparken.Turveien shall be developed through rough terrain, with some filling and cutting. The walking route has a length of approx. 150 m and a width of 3 m including the shoulder. In addition there will be an area for masonry, railings and ditches and for cutting, fillings and blasting work. There will only be minor water and sewage measures on the stretch, such as drainage with drainage pipeline and drains/sand trap manholes. Road lighting shall be established along the foot path. See the attached competition documents for further information.
Kontrakttype: Bygge- og anleggsarbeid
Produkter/tjenester: Bygge- og anleggsvirksomhet📦 Beskrivelse
Intern identifikator: 24/06575
Land: Norge 🇳🇴
Utførelsessted: Møre og Romsdal
🏙️ Varighet
Startdato: 2025-03-02 📅
Sluttdato: 2025-06-03 📅
Tildelingskriterier
Kostnadskriterium (navn): Price/cost (including any options) Under this criteria, the offered price - construction time - completion date
Kostnadskriterium (vekting): 60
Kvalitetskriterium (navn): Quality Under this criteria is assessed: - Contracting Organisation - Quality of delivery
Kvalitetskriterium (vekting): 30
Kvalitetskriterium (navn): Completion
Kvalitetskriterium (vekting): 10
Tittel
Identifikasjonsnummer for delkontrakt: LOT-0000
In connection with the construction of the new Folkeparken school, a footpath between the school area and down towards the foot path in Folkeparken.Turveien shall be developed through rough terrain, with some filling and cutting. The walking route has a length of approx. 150 m and a width of 3 m including the shoulder. In addition there will be an area for masonry, railings and ditches and for cutting, fillings and blasting work. There will only be minor water and sewage measures on the stretch, such as drainage with drainage pipeline and drains/sand trap manholes. Road lighting shall be established along the foot path. See the attached competition documents for further information.
In connection with the construction of the new Folkeparken school, a footpath between the school area and down towards the foot path in Folkeparken.Turveien shall be developed through rough terrain, with some filling and cutting. The walking route has a length of approx. 150 m and a width of 3 m including the shoulder. In addition there will be an area for masonry, railings and ditches and for cutting, fillings and blasting work. There will only be minor water and sewage measures on the stretch, such as drainage with drainage pipeline and drains/sand trap manholes. Road lighting shall be established along the foot path. See the attached competition documents for further information.
Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2025-02-03 11:00:00 📅
Vilkår for åpning av tilbud: 2025-02-03 11:00:00 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Minste tidsramme som tilbyderen må opprettholde tilbudet i: 3 måneder Anbudsvilkår
Avansert eller kvalifisert elektronisk signatur eller segl (som definert i forordning (EU) nr. 910/2014) er påkrevd
Åpningsdato: 2025-02-03 11:00:00 📅
Elektronisk fakturering: Påkrevd
Elektronisk bestilling vil bli brukt ✅
Elektronisk betaling vil bli brukt ✅
Frist for å be om tilleggsinformasjon: 2025-01-27 11:00:00 📅
Tildelingskriterier
Vekttype: Vekting (poeng, eksakt)
Juridisk, økonomisk, finansiell og teknisk informasjon Økonomisk og finansiell stilling
Liste og kort beskrivelse av utvelgelseskriterier:
'Total' annual turnover: The tenderer ́s ("total") annual turnover for the number of financial years requested in the tender notice or in the procurement documents is as follows:
Average annual turnover: The tenderer ́s average annual turnover for the number of years requested in the notice or in the procurement documents is as follows:
"Specific annual turnover": Are the tenderer's ("specific") annual turnover within the area that the contract applies to and specified in the notice or in the procurement documents for the number of accounting years requested is as follows:
Average set-up: Is the tenderer's average annual turnover within the area requested by the contract and specified in the notice or in the procurement documents for the number of financial years requested:
The tenderer's establishment date: If the information about the turnover (combined or specific) is not available for the entire requested period, please state the date the company was established, or the tenderers started their business:
Financial key figures: For financial key figures stated in the notice or in the procurement documents, the tenderer declares that the actual value(s) of the requested key figures are as follows:
Liability insurance: The insured amount in the tenderer ́s liability insurance is the following:
Other economic and financial requirements: Regarding any other economic and financial requirements that have been stated in the notice or in the procurement documents, the tenderer declares that:
Tenderers shall substantiate the financial capacity to fulfil the contract.: Annex 1.2
Annual financial statements including the annual report and
auditor's report for the last 3
financial year.
Tax certificate for tax and VAT.
If the tenderer believes that this does not provide
a correct picture of its economic
capacity, this can be accounted for,
possibly by supplementing with newer
credit appraisal/rating carried out by public
certified credit rating institution.
The contracting authority can obtain further
documentation and assessments on
the companies' economic situation and
use this in the qualification evaluation.
Minimum qualification requirements
Tenderers shall substantiate the financial capacity to fulfil the contract.: Annex 1.2
Annual financial statements including the annual report and
auditor's report for the last 3
financial year.
Tax certificate for tax and VAT.
If the tenderer believes that this does not provide
a correct picture of its economic
capacity, this can be accounted for,
possibly by supplementing with newer
credit appraisal/rating carried out by public
certified credit rating institution.
The contracting authority can obtain further
documentation and assessments on
the companies' economic situation and
use this in the qualification evaluation.
Minimum qualification requirements
Vilkår for deltakelse
Liste og kort beskrivelse av regler og kriterier:
Certificates issued by independent bodies for…
… quality assurance standards.: Can tenderers submit certificates issued by independent bodies that document that the tenderer fulfils the stated quality assurance standards, including universal design requirements?
… environmental management standards.: Is the tenderer able to submit certificates issued by independent bodies as documentation that the tenderer fulfils the stated environmental management systems or standards?
Liste og kort beskrivelse av vilkår:
Registered in a trade register: Tenderers are registered in a professional register in the member state in which the tenderer is established. As described in annex XI of directive 2014/24/EU; suppliers from certain member states may have to fulfil other requirements in the mentioned annex.
Registered in a trade register: Tenderers are registered in a professional register in the member state in which the tenderer is established. As described in annex XI of directive 2014/24/EU; suppliers from certain member states may have to fulfil other requirements in the mentioned annex.
Registered in a trade register or company register.: Tenderers are registered in a company register or a trade register in the member state in which the tenderer is established. As described in annex XI of directive 2014/24/EU; suppliers from certain member states may have to fulfil other requirements in the mentioned annex.
Registered in a trade register or company register.: Tenderers are registered in a company register or a trade register in the member state in which the tenderer is established. As described in annex XI of directive 2014/24/EU; suppliers from certain member states may have to fulfil other requirements in the mentioned annex.
The company shall be legally registered.: Annex 1.1
Norwegian companies: Company Registration Certificate
Teknisk og faglig kapasitet
Liste og kort beskrivelse av utvelgelseskriterier:
Only for building and construction works:: Only for public building and construction works: During the reference period the tenderer has carried out the following work of the requested type. The contracting authority can require up to five years experience and allow experience from the previous five years to be taken into consideration.
Only for building and construction works:: Only for public building and construction works: During the reference period the tenderer has carried out the following work of the requested type. The contracting authority can require up to five years experience and allow experience from the previous five years to be taken into consideration.
Technical personnel or technical units: Tenderers can use the following technical personnel or technical units , particularly those who are responsible for quality control: For technical personnel or technical units that do not directly belong to the tenderer ́s business, but if the capacity the tenderer will use, cf. part II, section C, separate ESPD forms shall be supplemented.
Technical personnel or technical units: Tenderers can use the following technical personnel or technical units , particularly those who are responsible for quality control: For technical personnel or technical units that do not directly belong to the tenderer ́s business, but if the capacity the tenderer will use, cf. part II, section C, separate ESPD forms shall be supplemented.
For public building and construction work, technical personnel or units that shall carry out the work: Tenderers can use the following technical personnel or technical units for public building and construction work to fulfil the contract:
Technical facilities and quality assurance measures: The tenderer utilises the following technical facilities and quality assurance measures and the tenderer ́s survey and research facility is as follows:
Investigation and research facilities: The tenderer ́s survey and research facilitates are as follows:
Management and tracing of the supply chain: The tenderer will be able to use the following management of the supply chain and tracing systems for the execution of the contract:
Control Permission: For goods or services that are complicated, or that in exceptional cases shall be used for a particular purpose: Will the tenderer allow checks of the tenderer's production capacity or technical capacity and, where necessary, of the survey and research facilities that the tenderer has at its disposal and of quality control measures? The inspections shall be undertaken by the contracting authority or the contracting authority can leave it to a competent public body in the country where the tenderer is established.
Control Permission: For goods or services that are complicated, or that in exceptional cases shall be used for a particular purpose: Will the tenderer allow checks of the tenderer's production capacity or technical capacity and, where necessary, of the survey and research facilities that the tenderer has at its disposal and of quality control measures? The inspections shall be undertaken by the contracting authority or the contracting authority can leave it to a competent public body in the country where the tenderer is established.
Education and professional qualifications: The following education and professional qualifications are possessed by the tenderer and/or (depending on the requirements set in the notice or in the procurement documents) of the leading employees:
Environmental management measures: Tenderers can employ the following environmental management measures in connection with the execution of the contract:
Number of employees in the management: The tenderer ́s number of employees in the management during the last three years was as follows:
Average workforce: The tenderer's average annual workforce in the last three years has been as follows:
Tools, materials and technical equipment.: Tenderers can use the following tools, material and technical equipment to carry out the contract:
Portion of the contract to sub-suppliers.: The tenderer is considering to outsource the following part (as a percentage) of the contract to sub-suppliers. Note that if the tenderer has decided to outsource a part of the contract to sub-suppliers and will use the sub-suppliers ́ capacity to carry out this part, a special ESPD will be supplemented for such sub-suppliers, see part II, section C, above.
Portion of the contract to sub-suppliers.: The tenderer is considering to outsource the following part (as a percentage) of the contract to sub-suppliers. Note that if the tenderer has decided to outsource a part of the contract to sub-suppliers and will use the sub-suppliers ́ capacity to carry out this part, a special ESPD will be supplemented for such sub-suppliers, see part II, section C, above.
Central certification or documented competence as stated in SAK chapter 11 or equivalent, in development classes 2. Responsible executor: a. Surveying and protruding of measures b. Road and ground works d. Water supply and sewage installations.: Annex 1.3
Central certification or other documentation
Minimum qualification requirements
Central certification or documented competence as stated in SAK chapter 11 or equivalent, in development classes 2. Responsible executor: a. Surveying and protruding of measures b. Road and ground works d. Water supply and sewage installations.: Annex 1.3
Central certification or other documentation
Minimum qualification requirements
Relevant experience with assignments of at least equivalent size and complexity. -Works on blasting near houses - Works in vulnerable terrain -Working on footpaths, foot paths - Works with drainage, sand trap manholes - Works with lighting: Annex 1.4
List of relevant assignments carried out during the last 5 years. The list shall include information on the extent and reference person of the work.
Certificates from the contracting authority shall be enclosed for satisfactory execution of at least two of these projects.
Minimum qualification requirements
Relevant experience with assignments of at least equivalent size and complexity. -Works on blasting near houses - Works in vulnerable terrain -Working on footpaths, foot paths - Works with drainage, sand trap manholes - Works with lighting: Annex 1.4
List of relevant assignments carried out during the last 5 years. The list shall include information on the extent and reference person of the work.
Certificates from the contracting authority shall be enclosed for satisfactory execution of at least two of these projects.
Minimum qualification requirements
A quality assurance/management system that is sufficient to fulfil the contract.: Annex 1.5
Tenderers shall give an account of the company ́s quality assurance/management system that the tenderer has implemented or plans to use for the execution of the delivery.
If a tenderer does not have a third-party certified system for the quality assurance/management system, the tenderer shall describe the procedures and measures that are implemented by the delivery and that show that the tenderer has its own quality assurance/management system and documented targets.
Minimum qualification requirements
A quality assurance/management system that is sufficient to fulfil the contract.: Annex 1.5
Tenderers shall give an account of the company ́s quality assurance/management system that the tenderer has implemented or plans to use for the execution of the delivery.
If a tenderer does not have a third-party certified system for the quality assurance/management system, the tenderer shall describe the procedures and measures that are implemented by the delivery and that show that the tenderer has its own quality assurance/management system and documented targets.
Minimum qualification requirements
Satisfactory competence of key personnel who are included in the assignment organisation. Personnel are required to have completed cable management courses. ADK1, a plastic welding certificate for a general contractor or sub-contractor is required.: Annex 1.6
Information on the education and professional qualifications of the contractor's key personnel, for example CVs.
Minimum qualification requirements
Satisfactory competence of key personnel who are included in the assignment organisation. Personnel are required to have completed cable management courses. ADK1, a plastic welding certificate for a general contractor or sub-contractor is required.: Annex 1.6
Information on the education and professional qualifications of the contractor's key personnel, for example CVs.
Minimum qualification requirements
Environmental requirements The contractor shall, as a minimum, use Euro6 for lorries and step 5 for excavators.: Annex 1.7
Documents stating that requirements are met.
Minimum qualification requirements
Vilkår for deltakelse
Utestengelsesgrunn:
Akkord med kreditorer
Avtaler med andre økonomiske aktører som har til formål å vri konkurransen
Barnearbeid og andre former for menneskehandel
+ 21 til
Bedrageri
Betaling av skatter
Betaling av trygdeavgifter
Brudd på forpliktelser på arbeidsrettens område
Brudd på forpliktelser på miljørettens område
Brudd på forpliktelser på sosialrettens område
Deltakelse i en kriminell organisasjon
Direkte eller indirekte deltakelse i forberedelsen av denne anskaffelsen
Eiendeler under administrasjon av bobestyrer
Forretningsvirksomheten er suspendert
Hvitvasking eller terrorfinansiering
Insolvens
Interessekonflikt på grunn av deltakelse i anskaffelsesprosedyren
Konkurs
Korrupsjon
Rent nasjonale utelukkelsesgrunner
Situasjon tilsvarende konkurs etter nasjonal lovgivning
Skyldig i alvorlige feil i yrkesutøvelsen
Skyldig i uriktig fremstilling, tilbakeholdt informasjon, ute av stand til å fremlegge nødvendige dokumenter og innhentet konfidensiell informasjon om denne prosedyren
Terrorhandlinger eller handlinger knyttet til terrorvirksomhet
Tidlig heving, erstatning eller andre sammenlignbare sanksjoner
Beskrivelse av utelukkelsesgrunner:
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies,…
… in the event a enforceable verdict has been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, Involving European Communities or European Union Member States (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier.
… at the time a legally convicted verdict of participation in a criminal organisation by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Participation in a criminal organisation as defined in Article 2 of the Council ́s framework decision 2008/841/RIA of 24 October 2008 on control of organised crime (EUT L 300 of 11.11.2008, p. 42)
Has the tenderer entered into agreement(s) with other tenderers with the intention of turning the competition?
Is the tenderer aware of breaches of environmental provisions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies,…
… in the event a legal verdict has been convicted of money laundering or financing terrorism by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Money laundering or financing terrorism As defined in Article 1 of the European Parliament and Council Directive 2005/60/EF of 26 October 2005 on preventive measures against the use of the financial system for money laundering and financing terrorism (EUT L 309 of 25.11.2005, p. 15).
… at the time a legally convicted of fraud has been convicted of fraud by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Fraud included in Article 1 of the Convention on protection of the Financial Interests of the European Communities (EFT C 316 of 27.11.1995, p. 48).
… in the event a legal verdict has been convicted of child labour and other forms of human trafficking by a verdict handed down no more than five years ago, or a rejection period determined directly in the judgement that still applies? Child labour and other forms of human trafficking as defined in Article 2 of the European Parliament and council directive 2011/36/EU of 5. 1 April 2011 on the prevention and control of human trafficking and the protection of its victims and for compensation of the Council ́s framework decision 2002/629/RIA (EUT L 101 of 15.4.2011, p. 1).
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer aware of breaches of provisions on working conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Have the tenderer:a) given grossly incorrect information when notifying the information required to verify that there is no basis for rejection, or of the qualification requirements being met,b) failed to provide such information,c) subject to immediately submitting the supporting documents requested by the Contracting Authority, ord) improperly affecting the Contracting Authority's decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award?
Have the tenderer:a) given grossly incorrect information when notifying the information required to verify that there is no basis for rejection, or of the qualification requirements being met,b) failed to provide such information,c) subject to immediately submitting the supporting documents requested by the Contracting Authority, ord) improperly affecting the Contracting Authority's decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award?
The contracting authority shall state that in Norway there are national rejection reasons. These shall be described in the procurement documents. Tenderers must respond to whether they are in one or more of the situations described in the national rejection reasons. Will the purely national rejection reasons, as stated in the relevant notice or in the procurement documents, apply?
The contracting authority shall state that in Norway there are national rejection reasons. These shall be described in the procurement documents. Tenderers must respond to whether they are in one or more of the situations described in the national rejection reasons. Will the purely national rejection reasons, as stated in the relevant notice or in the procurement documents, apply?
Are tenderers aware of a conflict of interest as stated in national law, the relevant notice or procurement documents?
Has the tenderer or an entity associated with the supplier advised the contracting authority or in another way been involved in the planning of the competition?
Has the tenderer committed serious errors in professional practice? If relevant, see the definitions in national law, the relevant notice or procurement documents.
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
Is the tenderer aware of breaches of provisions on social conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Have tenderers failed to fulfil all their social security obligations in the country where they are established and in their member state, if this is a different country than what he is established in?
Has the tenderer not fulfilled his tax and duty obligations in the country in which he is established, and in the contracting authority's member state, if this is a different country than what he is established in?
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.