Framework agreement for assistance with maintenance of signal plans, as well as the preparation and entry of signal plans on new installations, in STS (Siemens traffic management system) at the Road Traffic Centre East.
The Norwegian Public Roads Administration, Road Traffic Central East (hoods called the Contracting Authority) would like to enter into a framework agreement for assistance with the maintenance of signal plans, as well as the preparation and entry of signal plans on new installations, in STS (Siemens traffic management system) with one tenderer. The framework agreement applies for the Road Traffic Centre in the east, but it can be used by other sections in the Norwegian Public Roads Administration. The aim of the procurement is to establish, enter and maintain signal plans with all parameters in STS, so that the prepared traffic plans function as intended and with it safeguards the top goals of the Norwegian Public Roads Administration which is an efficient, environmentally friendly and safe transport system. Technical installations in tunnels and open air installations in the operations area east are controlled and monitored from the Road Traffic Centre East (VTS) in Oslo. When traffic in tunnels and day installations is regulated, signal plans occur in the tool STS (Siemens traffic management system), which is an integrated part of VTS east ́s overall management system.
Frist
Fristen for mottak av tilbud var 2024-10-16.
Anskaffelsen ble publisert 2024-09-09.
Kunngjøring av konkurranse (2024-09-09) Gjenstand Anskaffelsens omfang
Tittel: Framework agreement for assistance with maintenance of signal plans, as well as the preparation and entry of signal plans on new installations, in STS (Siemens traffic management system) at the Road Traffic Centre East.
Referansenummer: 24/97071
Kort beskrivelse:
The Norwegian Public Roads Administration, Road Traffic Central East (hoods called the Contracting Authority) would like to enter into a framework agreement for assistance with the maintenance of signal plans, as well as the preparation and entry of signal plans on new installations, in STS (Siemens traffic management system) with one tenderer. The framework agreement applies for the Road Traffic Centre in the east, but it can be used by other sections in the Norwegian Public Roads Administration.
The aim of the procurement is to establish, enter and maintain signal plans with all parameters in STS, so that the prepared traffic plans function as intended and with it safeguards the top goals of the Norwegian Public Roads Administration which is an efficient, environmentally friendly and safe transport system.
Technical installations in tunnels and open air installations in the operations area east are controlled and monitored from the Road Traffic Centre East (VTS) in Oslo. When traffic in tunnels and day installations is regulated, signal plans occur in the tool STS (Siemens traffic management system), which is an integrated part of VTS east ́s overall management system.
The Norwegian Public Roads Administration, Road Traffic Central East (hoods called the Contracting Authority) would like to enter into a framework agreement for assistance with the maintenance of signal plans, as well as the preparation and entry of signal plans on new installations, in STS (Siemens traffic management system) with one tenderer. The framework agreement applies for the Road Traffic Centre in the east, but it can be used by other sections in the Norwegian Public Roads Administration.
The aim of the procurement is to establish, enter and maintain signal plans with all parameters in STS, so that the prepared traffic plans function as intended and with it safeguards the top goals of the Norwegian Public Roads Administration which is an efficient, environmentally friendly and safe transport system.
Technical installations in tunnels and open air installations in the operations area east are controlled and monitored from the Road Traffic Centre East (VTS) in Oslo. When traffic in tunnels and day installations is regulated, signal plans occur in the tool STS (Siemens traffic management system), which is an integrated part of VTS east ́s overall management system.
Kontrakttype: Tjenester
Produkter/tjenester: Systemtjenester og tekniske konsulenttjenester📦
Estimert verdi eksklusive mva: 10 000 000 NOK 💰
Beskrivelse
Intern identifikator: 1
Tilleggsprodukter/-tjenester:
VTS east is located in Oslo and serves the area Innlandet, Oslo and Viken (except old Buskerud county).
Postadresse: Vegtrafikksentralen øst
By: Oslo
Land: Norge 🇳🇴
Utførelsessted: Oslo
🏙️
Varighet: 4 år
Maksimalt antall fornyelser: 2
Informasjon om opsjoner
Opsjoner ✅
Beskrivelse av opsjoner: Option for 1+1 year extension.
Tildelingskriterier
Pris ✅
Pris (vekting): 30
Kvalitetskriterium (navn): The offered personnel ́ relevant formal competence and experience
Kvalitetskriterium (vekting): 70
Tittel
Identifikasjonsnummer for delkontrakt: LOT-0000
Prosedyre Prosedyretype
Åpen anbudskonkurranse ✅
Rettslig grunnlag: Direktiv 2014/24/EU
Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2024-10-16 10:00:00 📅
Vilkår for åpning av tilbud: 2024-10-16 10:00:00 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Minste tidsramme som tilbyderen må opprettholde tilbudet i: 129 dager Informasjon om en rammeavtale eller en dynamisk innkjøpsordning
Rammeavtale med flere leverandører ✅ Anbudsvilkår
Åpningsdato: 2024-10-16 10:00:00 📅
Elektronisk fakturering: Påkrevd
Elektronisk betaling vil bli brukt ✅
Frist for å be om tilleggsinformasjon: 2024-10-09 10:00:00 📅
Tildelingskriterier
Vekttype: Vekting (prosent, eksakt)
Juridisk, økonomisk, finansiell og teknisk informasjon Økonomisk og finansiell stilling
Liste og kort beskrivelse av utvelgelseskriterier:
Requirements of the tenderer's economic and financial capacity.: Tenderers must have sufficient financial capacity to fulfil the contract.
Creditworthiness will be sufficient to meet the requirement. The contracting authority will obtain a credit rating from Experian.
If there is doubt, the Contracting Authority can obtain further information from the tenderer.
Requirements of the tenderer's economic and financial capacity.: Tenderers must have sufficient financial capacity to fulfil the contract.
Creditworthiness will be sufficient to meet the requirement. The contracting authority will obtain a credit rating from Experian.
If there is doubt, the Contracting Authority can obtain further information from the tenderer.
Teknisk og faglig kapasitet
Requirements regarding the tenderer ́s technical and professional qualifications.: Tenderers shall have equivalent experience.
Equivalent assignments mean experience with the current traffic management systems and traffic and signal planning work in STS, VTS east.
Tenderers shall fill in Annex 4: Assignment List
Requirements regarding the tenderer ́s technical and professional qualifications.: Tenderers shall have equivalent experience.
Equivalent assignments mean experience with the current traffic management systems and traffic and signal planning work in STS, VTS east.
Tenderers shall fill in Annex 4: Assignment List
Vilkår for deltakelse
Utestengelsesgrunn:
Akkord med kreditorer
Avtaler med andre økonomiske aktører som har til formål å vri konkurransen
Barnearbeid og andre former for menneskehandel
+ 20 til
Bedrageri
Betaling av skatter
Betaling av trygdeavgifter
Brudd på forpliktelser på arbeidsrettens område
Brudd på forpliktelser på miljørettens område
Brudd på forpliktelser på sosialrettens område
Deltakelse i en kriminell organisasjon
Direkte eller indirekte deltakelse i forberedelsen av denne anskaffelsen
Eiendeler under administrasjon av bobestyrer
Forretningsvirksomheten er suspendert
Hvitvasking eller terrorfinansiering
Insolvens
Interessekonflikt på grunn av deltakelse i anskaffelsesprosedyren
Konkurs
Korrupsjon
Situasjon tilsvarende konkurs etter nasjonal lovgivning
Skyldig i alvorlige feil i yrkesutøvelsen
Skyldig i uriktig fremstilling, tilbakeholdt informasjon, ute av stand til å fremlegge nødvendige dokumenter og innhentet konfidensiell informasjon om denne prosedyren
Terrorhandlinger eller handlinger knyttet til terrorvirksomhet
Tidlig heving, erstatning eller andre sammenlignbare sanksjoner
Beskrivelse av utelukkelsesgrunner:
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies,…
… in the event a enforceable verdict has been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, Involving European Communities or European Union Member States (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier.
… at the time a legally convicted verdict of participation in a criminal organisation by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Participation in a criminal organisation as defined in Article 2 of the Council ́s framework decision 2008/841/RIA of 24 October 2008 on control of organised crime (EUT L 300 of 11.11.2008, p. 42)
Has the tenderer entered into agreement(s) with other tenderers with the intention of turning the competition?
Is the tenderer aware of breaches of environmental provisions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies,…
… in the event a legal verdict has been convicted of money laundering or financing terrorism by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Money laundering or financing terrorism As defined in Article 1 of the European Parliament and Council Directive 2005/60/EF of 26 October 2005 on preventive measures against the use of the financial system for money laundering and financing terrorism (EUT L 309 of 25.11.2005, p. 15).
… at the time a legally convicted of fraud has been convicted of fraud by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Fraud included in Article 1 of the Convention on protection of the Financial Interests of the European Communities (EFT C 316 of 27.11.1995, p. 48).
… in the event a legal verdict has been convicted of child labour and other forms of human trafficking by a verdict handed down no more than five years ago, or a rejection period determined directly in the judgement that still applies? Child labour and other forms of human trafficking as defined in Article 2 of the European Parliament and council directive 2011/36/EU of 5. 1 April 2011 on the prevention and control of human trafficking and the protection of its victims and for compensation of the Council ́s framework decision 2002/629/RIA (EUT L 101 of 15.4.2011, p. 1).
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer aware of breaches of provisions on working conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Have the tenderer:a) given grossly incorrect information when notifying the information required to verify that there is no basis for rejection, or of the qualification requirements being met,b) failed to provide such information,c) subject to immediately submitting the supporting documents requested by the Contracting Authority, ord) improperly affecting the Contracting Authority's decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award?
Have the tenderer:a) given grossly incorrect information when notifying the information required to verify that there is no basis for rejection, or of the qualification requirements being met,b) failed to provide such information,c) subject to immediately submitting the supporting documents requested by the Contracting Authority, ord) improperly affecting the Contracting Authority's decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award?
Are tenderers aware of a conflict of interest as stated in national law, the relevant notice or procurement documents?
Has the tenderer or an entity associated with the supplier advised the contracting authority or in another way been involved in the planning of the competition?
Has the tenderer committed serious errors in professional practice? If relevant, see the definitions in national law, the relevant notice or procurement documents.
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
Is the tenderer aware of breaches of provisions on social conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Have tenderers failed to fulfil all their social security obligations in the country where they are established and in their member state, if this is a different country than what he is established in?
Has the tenderer not fulfilled his tax and duty obligations in the country in which he is established, and in the contracting authority's member state, if this is a different country than what he is established in?
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.
Utfyllende informasjon Klageinstans
Navn: Oslo tingrett
Nasjonalt registreringsnummer: 926725939
Postadresse: C.J. Hambros plass 4
Postnummer: 0125
Poststed: Oslo
Region: Oslo
🏙️
Land: Norge 🇳🇴
Kontaktpunkt: Oslo tingrett
E-post: oslo.tingrett@domstol.no📧
Telefon: +47 22035200📞 Tjeneste hvor informasjon om klageprosedyren kan innhentes Samme som: Klageinstans Informasjon om elektroniske arbeidsflyter
Elektronisk fakturering vil bli akseptert
Kilde: OJS 2024/S 176-543945 (2024-09-09)