The Norwegian Public Roads Administration shall use technology through the project "Predictable accessible mountain passes" (FFF) to provide both increased predictability and increased accessibility. The Norwegian Public Roads Administration is responsible for important mountain passes that are affected by much of weather and winter conditions. This includes 24 mountain passes on the European and national road network, plus a selection of roads with equivalent mountain problems in the lowlands. Road users and the transport industry need predictable accessibility, which i.a. involves: • to get good information on weather conditions, closures, forecasts for closed periods. • to get information on detour and road choices as early as possible. • to get information that allows one to choose when to travel. The project 'Predictable accessible mountain passes' (FFF) is organised into 4 work packages. Work package 2 includes assignments of instrumenting roads, including, among other things, deploying physical free text boards along the road to route traffic to other alternative routes, providing information on expected accessibility or guidelines on chain use etc. As a result of the above, we need to procure free text boards for traffic management. Over the next 4-5 years we estimate that approx. 100 free text boards (fully graphicAL RGB LED signs) will be procured. At first we need to procure 26 free text boards in 2024.
Frist
Fristen for mottak av tilbud var 2024-08-09.
Anskaffelsen ble publisert 2024-06-11.
Kunngjøring av konkurranse (2024-06-11) Gjenstand Anskaffelsens omfang
Tittel: Delivery, assembly, connection and commissioning of free text boards
Referansenummer: 24/112703
Kort beskrivelse:
The Norwegian Public Roads Administration shall use technology through the project "Predictable accessible mountain passes" (FFF) to provide both increased predictability and increased accessibility.
The Norwegian Public Roads Administration is responsible for important mountain passes that are affected by much of weather and winter conditions. This includes 24 mountain passes on the European and national road network, plus a selection of roads with equivalent mountain problems in the lowlands.
Road users and the transport industry need predictable accessibility, which i.a. involves:
• to get good information on weather conditions, closures, forecasts for closed periods.
• to get information on detour and road choices as early as possible.
• to get information that allows one to choose when to travel.
The project 'Predictable accessible mountain passes' (FFF) is organised into 4 work packages. Work package 2 includes assignments of instrumenting roads, including, among other things, deploying physical free text boards along the road to route traffic to other alternative routes, providing information on expected accessibility or guidelines on chain use etc.
As a result of the above, we need to procure free text boards for traffic management.
Over the next 4-5 years we estimate that approx. 100 free text boards (fully graphicAL RGB LED signs) will be procured. At first we need to procure 26 free text boards in 2024.
The Norwegian Public Roads Administration shall use technology through the project "Predictable accessible mountain passes" (FFF) to provide both increased predictability and increased accessibility.
The Norwegian Public Roads Administration is responsible for important mountain passes that are affected by much of weather and winter conditions. This includes 24 mountain passes on the European and national road network, plus a selection of roads with equivalent mountain problems in the lowlands.
Road users and the transport industry need predictable accessibility, which i.a. involves:
• to get good information on weather conditions, closures, forecasts for closed periods.
• to get information on detour and road choices as early as possible.
• to get information that allows one to choose when to travel.
The project 'Predictable accessible mountain passes' (FFF) is organised into 4 work packages. Work package 2 includes assignments of instrumenting roads, including, among other things, deploying physical free text boards along the road to route traffic to other alternative routes, providing information on expected accessibility or guidelines on chain use etc.
As a result of the above, we need to procure free text boards for traffic management.
Over the next 4-5 years we estimate that approx. 100 free text boards (fully graphicAL RGB LED signs) will be procured. At first we need to procure 26 free text boards in 2024.
Kontrakttype: Varer
Produkter/tjenester: Elektromekanisk utstyr📦
Andre restriksjoner på utførelsesstedet: Hvor som helst innenfor det aktuelle landet
Beskrivelse
Intern identifikator: 1
Tilleggsprodukter/-tjenester:
Land: Norge 🇳🇴
Varighet: 52 måneder Tildelingskriterier
Pris ✅
Pris (vekting): 70
Kvalitetskriterium (navn): Climate and environment
Kvalitetskriterium (vekting): 30
Tittel
Identifikasjonsnummer for delkontrakt: LOT-0000
Prosedyre Prosedyretype
Åpen anbudskonkurranse ✅
Rettslig grunnlag: Direktiv 2014/24/EU
Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2024-08-09 10:00:00 📅
Vilkår for åpning av tilbud: 2024-08-09 10:00:00 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️ Anbudsvilkår
Avansert eller kvalifisert elektronisk signatur eller segl (som definert i forordning (EU) nr. 910/2014) er påkrevd
Åpningsdato: 2024-08-09 10:00:00 📅
Elektronisk fakturering: Påkrevd
Elektronisk betaling vil bli brukt ✅ Tildelingskriterier
Vekttype: Vekting (prosent, eksakt)
Anbudsvilkår
Kontrakten har gjennomføringsvilkår ✅
Juridisk, økonomisk, finansiell og teknisk informasjon Økonomisk og finansiell stilling
Liste og kort beskrivelse av utvelgelseskriterier:
Requirements for the supplier's economic and financial capacity: The supplier must have sufficient economic and financial capacity to execute the contract.
The supplier must have an equity ratio of at least 10%.
Documentation requirements:
The contracting authority will obtain a credit rating from Experian.
In case of doubt, the contracting authority may request additional information from the supplier.
Requirements for the supplier's economic and financial capacity: The supplier must have sufficient economic and financial capacity to execute the contract.
The supplier must have an equity ratio of at least 10%.
Documentation requirements:
The contracting authority will obtain a credit rating from Experian.
In case of doubt, the contracting authority may request additional information from the supplier.
Teknisk og faglig kapasitet
The supplier must have similar experience.: To be considered equivalent, the experience must include the following:
• Delivery and installation of similar full-graphic RGB LED signs
• Integration work with traffic equipment on the traffic control system of VTS (Road Traffic Control Center) in the west, south, and east.
At least one project must cover bullet point 1, and at least one project must cover bullet point 2.
Documentation requirements:
The supplier must confirm that they meet this requirement when submitting the offer.
Upon request from the contracting authority, the supplier must provide the following documentation:
An overview of a minimum of 2 (maximum of 4) of the most important similar works performed in the last 3 years, including a brief description of the project, the name of the public or private recipient, as well as information on value/quantity/scope and time.
A newly established supplier who cannot provide references must be particularly careful to document and substantiate that they nevertheless have the prerequisites to carry out the assignment.
Newly established suppliers can document the necessary experience by referring to the experience that the proposed personnel/resources have acquired in service for other than the supplier.
The supplier must have similar experience.: To be considered equivalent, the experience must include the following:
• Delivery and installation of similar full-graphic RGB LED signs
• Integration work with traffic equipment on the traffic control system of VTS (Road Traffic Control Center) in the west, south, and east.
At least one project must cover bullet point 1, and at least one project must cover bullet point 2.
Documentation requirements:
The supplier must confirm that they meet this requirement when submitting the offer.
Upon request from the contracting authority, the supplier must provide the following documentation:
An overview of a minimum of 2 (maximum of 4) of the most important similar works performed in the last 3 years, including a brief description of the project, the name of the public or private recipient, as well as information on value/quantity/scope and time.
A newly established supplier who cannot provide references must be particularly careful to document and substantiate that they nevertheless have the prerequisites to carry out the assignment.
Newly established suppliers can document the necessary experience by referring to the experience that the proposed personnel/resources have acquired in service for other than the supplier.
Vilkår knyttet til kontrakten
Vilkår for kontraktoppfyllelse:
In the attached contract terms points 2.6 and 3.26, there are requirements that ensure that employees at the tenderer and
any sub-suppliers who carry out work on the contract will not have worse wages and working conditions than what is in accordance with the current regulations on general tariff agreements or national collective agreements for the relevant industries. The Norwegian Public Roads Administration will also check that the provisions are complied with and impose sanctions on suppliers in case of compliance with the provisions.
In the attached contract terms points 2.6 and 3.26, there are requirements that ensure that employees at the tenderer and
any sub-suppliers who carry out work on the contract will not have worse wages and working conditions than what is in accordance with the current regulations on general tariff agreements or national collective agreements for the relevant industries. The Norwegian Public Roads Administration will also check that the provisions are complied with and impose sanctions on suppliers in case of compliance with the provisions.
Vilkår for deltakelse
Utestengelsesgrunn:
Akkord med kreditorer
Avtaler med andre økonomiske aktører som har til formål å vri konkurransen
Barnearbeid og andre former for menneskehandel
+ 20 til
Bedrageri
Betaling av skatter
Betaling av trygdeavgifter
Brudd på forpliktelser på arbeidsrettens område
Brudd på forpliktelser på miljørettens område
Brudd på forpliktelser på sosialrettens område
Deltakelse i en kriminell organisasjon
Direkte eller indirekte deltakelse i forberedelsen av denne anskaffelsen
Eiendeler under administrasjon av bobestyrer
Forretningsvirksomheten er suspendert
Hvitvasking eller terrorfinansiering
Insolvens
Interessekonflikt på grunn av deltakelse i anskaffelsesprosedyren
Konkurs
Korrupsjon
Situasjon tilsvarende konkurs etter nasjonal lovgivning
Skyldig i alvorlige feil i yrkesutøvelsen
Skyldig i uriktig fremstilling, tilbakeholdt informasjon, ute av stand til å fremlegge nødvendige dokumenter og innhentet konfidensiell informasjon om denne prosedyren
Terrorhandlinger eller handlinger knyttet til terrorvirksomhet
Tidlig heving, erstatning eller andre sammenlignbare sanksjoner
Beskrivelse av utelukkelsesgrunner:
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the…
… enforceable verdict been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies?<p>Corruption as defined in Article 3 of the convention on corruption, involving servicemen in the European Communities or in European Union member states (EUT C 195 of 25.6.1997, s. 1) and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier.</p>
… legally enforceable verdict been convicted of participation in a criminal organisation by a verdict handed down not more than five years ago, or a rejection period set out directly in the judgement that still applies?<p> Participation in a criminal organisation as defined in Article 2 in article 2 of The Council ́s framework decision 2008/841/RIA of 24 October 2008 on combating organised crime (EUT L 300 of 11.11.2008, p. 42)</p>
Has the tenderer entered into agreement(s) with other tenderers with the intention of turning the competition?
Is the tenderer aware of breaches of environmental provisions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory…
… body or has the competence to represent or control or make decisions in such bodies, in the event of a legal verdict been convicted of money laundering or financing terrorism by a judgement handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies?<p>Wedding money or financing terrorismAs a rejection period determined directly in the judgement that still applies?<p>White money or financing terrorism. defined in Article 1 of the European Parliament and Council Directive 2005/60/EF of 26 October 2005 on preventive measures against the use of the financial system for money laundering and financing terrorism (EUT L 309 of 25.11.2005, p. 15).</p>
… body or has the competence to represent or control or make decisions in such bodies, at the legally enforceable verdict been convicted of fraud by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies?<p>Speed as discussed in Article 1 of the convention on protection of the European Communities' financial interests (EFT C 316 of 27.11.1995, p. 48).</p>
… body, or has the competence to represent or control or make decisions in such bodies, at a legally enforceable verdict been convicted of child labour and other forms of human trafficking by a judgement handed down no more than five years ago, or a rejection period determined directly in the judgement that still applies?<p>Barnearbeid and other forms of human trafficking as defined in the judgement that still applies?<p>Barneworks and other forms of human trafficking as defined in the judgement that still applies?<p>Barneworks and other forms of human trafficking as defined in the judgement that still applies?<p>Barnearbeid and other forms of human trafficking as defined as defined in the judgement that still applies?<p>Barnearbeid and other forms of human trafficking as defined in the judgement that still applies?<p>Barneworks and other forms of human trafficking as defined in the judgement that still applies?<p>Barnearbeid as well as other forms of human trafficking as defined as defined in the judgement?<p article 2 of the European Parliament and the Council ́s directive 2011/36/EU of 5. April 2011 on the prevention and control of human trafficking and the protection of its victims and for compensation of the Council ́s framework decision 2002/629/RIA (EUT L 101 of 15.4.2011, p. 1).</p>
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer aware of breaches of provisions on working conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
If the tenderer: <p>a) has given grossly incorrect information when notifying the information required to check that there is no basis for rejection, or that the qualification requirements are fulfilled, </p><p>b) failed to provide such information, </p><p>c) subject to immediately submitting the supporting documents that the contracting authority requests. or</p><p>d) improperly affected the contracting authority's decision making process in order to acquire confidential information that may give this an unlawful advantage in connection with the competition, or negligently has given misleading information that could have a significant influence on decisions on rejection, selection or award?</p>
a) has given grossly incorrect information when notifying the information required to check that there is no basis for rejection, or that the qualification requirements are fulfilled,
b) failed to provide such information,
c) subject to immediately submitting the supporting documents that the contracting authority requests. or
d) improperly affected the contracting authority's decision making process in order to acquire confidential information that may give this an unlawful advantage in connection with the competition, or negligently has given misleading information that could have a significant influence on decisions on rejection, selection or award?
Are tenderers aware of a conflict of interest as stated in national law, the relevant notice or procurement documents?
Has the tenderer or an entity associated with the supplier advised the contracting authority or in another way been involved in the planning of the competition?
Has the tenderer committed serious errors in professional practice? If relevant, see the definitions in national law, the relevant notice or procurement documents.
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
Is the tenderer aware of breaches of provisions on social conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Have tenderers failed to fulfil all their social security obligations in the country where they are established and in their member state, if this is a different country than what he is established in?
Has the tenderer not fulfilled his tax and duty obligations in the country in which he is established, and in the contracting authority's member state, if this is a different country than what he is established in?
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activity by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies?<p> Terrorist acts or punishable acts of terrorism. acts relating to terrorist activity as defined in Articles 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.</p>
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activity by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies?
Terrorist acts or punishable acts of terrorism. acts relating to terrorist activity as defined in Articles 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.
Utfyllende informasjon Klageinstans
Navn: Oslo tingrett
Nasjonalt registreringsnummer: 926725939
Postadresse: C. J. Hambros plass
Postnummer: 0125
Poststed: Oslo
Land: Norge 🇳🇴
E-post: oslo.tingrett@domstol.no📧
Telefon: +47 22035200📞 Tjeneste hvor informasjon om klageprosedyren kan innhentes Samme som: Navn og adresser Informasjon om elektroniske arbeidsflyter
Elektronisk fakturering vil bli akseptert
Kilde: OJS 2024/S 113-345374 (2024-06-11)