This framework agreement is for consultancy services to assist Bergen municipality, c/o Bergen Water, with the work of following-up the municipality ́s approx. 70 watercourse installations in impact classes 0 – 4. 'river system' means ponds and waterways with associated structures in accordance with the definitions in the Dam Safety Regulations chapter 1. The term "ponds" here is tantamount to dams; i.e. ponds are structures that enable water to be depleted in a magazine. 'waterways' means flood courses, channels and sluice installations with associated structures as well as tunnels, shafts, pipes, pipelines and other systems, with associated structures leading water in connection with power generation. Examples of "accompanying constructions" can be, but are not limited to, roads, bridges, buildings, and retaining walls. The watercourse installations for Bergen Vann mainly comprise ponds, but also include a small number of channels and water road systems in connection with power generation.
Frist
Fristen for mottak av tilbud var 2025-01-10.
Anskaffelsen ble publisert 2024-12-05.
Kunngjøring av konkurranse (2024-12-05) Gjenstand Anskaffelsens omfang
Tittel: BV 2024-26 - Framework agreement dam security - consultancy services 2025-2027
Referansenummer: 2024/135964
Kort beskrivelse:
This framework agreement is for consultancy services to assist Bergen municipality, c/o Bergen Water, with the work of following-up the municipality ́s approx. 70 watercourse installations in impact classes 0 – 4. 'river system' means ponds and waterways with associated structures in accordance with the definitions in the Dam Safety Regulations chapter 1. The term "ponds" here is tantamount to dams; i.e. ponds are structures that enable water to be depleted in a magazine. 'waterways' means flood courses, channels and sluice installations with associated structures as well as tunnels, shafts, pipes, pipelines and other systems, with associated structures leading water in connection with power generation. Examples of "accompanying constructions" can be, but are not limited to, roads, bridges, buildings, and retaining walls. The watercourse installations for Bergen Vann mainly comprise ponds, but also include a small number of channels and water road systems in connection with power generation.
This framework agreement is for consultancy services to assist Bergen municipality, c/o Bergen Water, with the work of following-up the municipality ́s approx. 70 watercourse installations in impact classes 0 – 4. 'river system' means ponds and waterways with associated structures in accordance with the definitions in the Dam Safety Regulations chapter 1. The term "ponds" here is tantamount to dams; i.e. ponds are structures that enable water to be depleted in a magazine. 'waterways' means flood courses, channels and sluice installations with associated structures as well as tunnels, shafts, pipes, pipelines and other systems, with associated structures leading water in connection with power generation. Examples of "accompanying constructions" can be, but are not limited to, roads, bridges, buildings, and retaining walls. The watercourse installations for Bergen Vann mainly comprise ponds, but also include a small number of channels and water road systems in connection with power generation.
Kontrakttype: Tjenester
Produkter/tjenester: Ingeniørtjenester📦 Beskrivelse
Intern identifikator: 2024/135964
Hovedsted eller utførelsessted: Bergen municipality
By: Bergen
Land: Norge 🇳🇴
Utførelsessted: Vestland
🏙️
Varighet: 72 måneder
Maksimalt antall fornyelser: 4
Annen informasjon om fornyelser:
The contract will be valid for 2 years, with an option for the contracting authority to extend the contract for a further 4 years, to a total maximum of 6 years.
The contracting authority can choose to extend the contract in several stages, for example, for 1 year at a time.
The contract will be valid for 2 years, with an option for the contracting authority to extend the contract for a further 4 years, to a total maximum of 6 years.
The contracting authority can choose to extend the contract in several stages, for example, for 1 year at a time.
Tittel
Identifikasjonsnummer for delkontrakt: LOT-0000
The framework agreement includes consultancy services for the construction, operation and maintenance of our watercourse installations and associated structures. Assignments under the framework agreement will mainly be connected to monitoring, re-appraisal and renewal of the river system, including follow-up in the construction period. A parallel framework agreement shall be signed with two tenderers. See the tender documentation for more information.
The framework agreement includes consultancy services for the construction, operation and maintenance of our watercourse installations and associated structures. Assignments under the framework agreement will mainly be connected to monitoring, re-appraisal and renewal of the river system, including follow-up in the construction period. A parallel framework agreement shall be signed with two tenderers. See the tender documentation for more information.
Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2025-01-10 11:00:00 📅
Vilkår for åpning av tilbud: 2025-01-10 11:00:00 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Minste tidsramme som tilbyderen må opprettholde tilbudet i: 3 måneder Informasjon om en rammeavtale eller en dynamisk innkjøpsordning
Rammeavtale med flere leverandører ✅ Anbudsvilkår
Avansert eller kvalifisert elektronisk signatur eller segl (som definert i forordning (EU) nr. 910/2014) er påkrevd
Åpningsdato: 2025-01-10 11:00:00 📅
Frist for å be om tilleggsinformasjon: 2025-01-03 14:00:00 📅
Kontrakten har gjennomføringsvilkår ✅
Juridisk, økonomisk, finansiell og teknisk informasjon Økonomisk og finansiell stilling
Liste og kort beskrivelse av utvelgelseskriterier:
'Total' annual turnover: The tenderer ́s ("total") annual turnover for the number of financial years requested in the tender notice or in the procurement documents is as follows:
Average annual turnover: The tenderer ́s average annual turnover for the number of years requested in the notice or in the procurement documents is as follows:
"Specific annual turnover": Are the tenderer's ("specific") annual turnover within the area that the contract applies to and specified in the notice or in the procurement documents for the number of accounting years requested is as follows:
Average set-up: Is the tenderer's average annual turnover within the area requested by the contract and specified in the notice or in the procurement documents for the number of financial years requested:
The tenderer's establishment date: If the information about the turnover (combined or specific) is not available for the entire requested period, please state the date the company was established, or the tenderers started their business:
Financial key figures: For financial key figures stated in the notice or in the procurement documents, the tenderer declares that the actual value(s) of the requested key figures are as follows:
Liability insurance: The insured amount in the tenderer ́s liability insurance is the following:
Other economic and financial requirements: Regarding any other economic and financial requirements that have been stated in the notice or in the procurement documents, the tenderer declares that:
Minimum qualification requirements
Regarding any other economic and financial requirements that have been stated in the notice or in the procurement documents, the tenderer declares that: The tenderer has sufficient economic and financial capacity to fulfil the contract. The required financial capacity will be assessed in relation to the contract ́s value, benefits, risk and duration. All the received and any obtained information will form the basis for an overall assessment of whether the qualification requirement is fulfilled. Documentation for Norwegian tenderers: The contracting authority will check the tenderer ́s financial situation from DFØ's eBevis, Proff Forvalt (https://forvalt.no/) and/or via information provided by Creditsafe (https://www.creditsafe.com) and can obtain further information from the Brønnøysund Register Centre. Foreign companies: The contracting authority will check the tenderer ́s financial situation from Creditsafe (https://www.creditsafe.com). If the tenderer is not registered in Creditsafe ́s registers, the company ́s last two auditor approved annual accounts shall be submitted upon request. If information in the above sources is not correct or supplementary information is needed to highlight the company's economic and financial situation, this can be provided.
Other economic and financial requirements: Regarding any other economic and financial requirements that have been stated in the notice or in the procurement documents, the tenderer declares that:
Minimum qualification requirements
Regarding any other economic and financial requirements that have been stated in the notice or in the procurement documents, the tenderer declares that: The tenderer has sufficient economic and financial capacity to fulfil the contract. The required financial capacity will be assessed in relation to the contract ́s value, benefits, risk and duration. All the received and any obtained information will form the basis for an overall assessment of whether the qualification requirement is fulfilled. Documentation for Norwegian tenderers: The contracting authority will check the tenderer ́s financial situation from DFØ's eBevis, Proff Forvalt (https://forvalt.no/) and/or via information provided by Creditsafe (https://www.creditsafe.com) and can obtain further information from the Brønnøysund Register Centre. Foreign companies: The contracting authority will check the tenderer ́s financial situation from Creditsafe (https://www.creditsafe.com). If the tenderer is not registered in Creditsafe ́s registers, the company ́s last two auditor approved annual accounts shall be submitted upon request. If information in the above sources is not correct or supplementary information is needed to highlight the company's economic and financial situation, this can be provided.
Vilkår for deltakelse
Liste og kort beskrivelse av regler og kriterier:
Certificates issued by independent bodies for…
… quality assurance standards.: Can tenderers submit certificates issued by independent bodies that document that the tenderer fulfils the stated quality assurance standards, including universal design requirements?
Minimum qualification requirements
The contracting authority requires that all tenderers have implemented a quality management system that is satisfactory to ensure the quality of execution in this contract. Documentation requirement: Description of the company ́s implemented quality management system. A certificate shall be submitted for the company's quality management system issued by independent bodies that confirm that the company fulfils certain quality management standards, for example ISO 9001. If the company does not have such certificate, other documentation of the company's quality management system shall be provided. In such cases as a minimum the following shall be submitted: + the system ́s name and detailed table of contents + general description of the contents of the system, including an overview of control plans and check-lists that are relevant for this contract + organisation chart showing the responsibilities in the quality management system + description of routines for internal control and handling of deviations (work with corrective and preventive measures) + a description of how the system will be used to. ensure the quality of this contract. All received or obtained documentation will form the basis for an overall assessment of whether the qualification requirement is fulfilled.
… environmental management standards.: Is the tenderer able to submit certificates issued by independent bodies as documentation that the tenderer fulfils the stated environmental management systems or standards?
Minimum qualification requirements
The contracting authority requires suppliers who are certified from independent third parties that confirm that the tenderer has procedures and systems that ensure that the execution of the delivery has a low environmental impact. Documentation requirement: Tenderers shall submit certificates from independent bodies that document an established and satisfactory environmental management system. Documentation is required that the tenderer is either environmentally certified in accordance with valid ISO 14001, is Eco-Lighthouse, is certified by EMAS, or are certified by equivalent third parties. If a company does not have such certificates, other documentation of the company's environmental management system must be submitted. In such cases as a minimum the following shall be submitted: + the system ́s name and detailed table of contents + general description of the contents of the system, including an overview of control plans and check-lists that are relevant for this contract + organisation chart showing the responsibilities in the environmental management system + description of routines for internal control and deviation management (work with corrective and preventive measures) + a description of how the system will be used in order to get reduced environmental impact in this contract. All received or obtained documentation will form the basis for an overall assessment of whether the qualification requirement is fulfilled.
Liste og kort beskrivelse av vilkår:
Registered in a trade register: Tenderers are registered in a professional register in the member state in which the tenderer is established. As described in annex XI of directive 2014/24/EU; suppliers from certain member states may have to fulfil other requirements in the mentioned annex.
Registered in a trade register: Tenderers are registered in a professional register in the member state in which the tenderer is established. As described in annex XI of directive 2014/24/EU; suppliers from certain member states may have to fulfil other requirements in the mentioned annex.
Registered in a trade register or company register.: Tenderers are registered in a company register or a trade register in the member state in which the tenderer is established. As described in annex XI of directive 2014/24/EU; suppliers from certain member states may have to fulfil other requirements in the mentioned annex.
Minimum qualification requirements
Tenderers shall be a legally registered company.
Documentation: Documentation: Documentation must not be enclosed for tenderers registered in the Norwegian Register of Units. The contracting authority will check the registration by using the organisation number stated in the tenderer ́s Mercell profile.
Tenderers who are not registered in the above register must present a certificate or confirmation (equivalent company registration certificate) for registration in a trade or business register as prescribed by the law of the country where the tenderer is established. Such a certificate shall not be issued more than six months before the tender deadline.
Registered in a trade register or company register.: Tenderers are registered in a company register or a trade register in the member state in which the tenderer is established. As described in annex XI of directive 2014/24/EU; suppliers from certain member states may have to fulfil other requirements in the mentioned annex.
Minimum qualification requirements
Tenderers shall be a legally registered company.
Documentation: Documentation: Documentation must not be enclosed for tenderers registered in the Norwegian Register of Units. The contracting authority will check the registration by using the organisation number stated in the tenderer ́s Mercell profile.
Tenderers who are not registered in the above register must present a certificate or confirmation (equivalent company registration certificate) for registration in a trade or business register as prescribed by the law of the country where the tenderer is established. Such a certificate shall not be issued more than six months before the tender deadline.
In the case of service contracts: Authorisations from a particular organisation required: Is a specific authorisation required from a particular organisation to provide the service in the tenderer's home country?
In the case of service contracts: Membership in a particular organisation is required: Is it necessary to have a particular membership in a particular organisation in order to provide the service in the tenderer ́s home country?
Teknisk og faglig kapasitet
Liste og kort beskrivelse av utvelgelseskriterier:
Services only: Only for services: In the reference period, the tenderer has carried out the following important goods deliveries of the requested type, or the following important services of the requested type. The contracting authority can require up to three years experience and allow experience from the previous three years to be taken into consideration.
Minimum qualification requirements
Tenderers shall have good and relevant experience. The experience shall include deliveries of equivalent complexity as the delivery requested in this competition.
Documentation requirement:
Relevant experience shall be documented by stating a minimum of three (3) and a maximum of five (5) reference projects from the last three (3) years. The references are to be added directly to Mercell as a response to this point. If more than five reference projects are given, only the first five will be assessed.
Services only: Only for services: In the reference period, the tenderer has carried out the following important goods deliveries of the requested type, or the following important services of the requested type. The contracting authority can require up to three years experience and allow experience from the previous three years to be taken into consideration.
Minimum qualification requirements
Tenderers shall have good and relevant experience. The experience shall include deliveries of equivalent complexity as the delivery requested in this competition.
Documentation requirement:
Relevant experience shall be documented by stating a minimum of three (3) and a maximum of five (5) reference projects from the last three (3) years. The references are to be added directly to Mercell as a response to this point. If more than five reference projects are given, only the first five will be assessed.
Technical personnel or technical units: Tenderers can use the following technical personnel or technical units , particularly those who are responsible for quality control: For technical personnel or technical units that do not directly belong to the tenderer ́s business, but if the capacity the tenderer will use, cf. part II, section C, separate ESPD forms shall be supplemented.
Technical personnel or technical units: Tenderers can use the following technical personnel or technical units , particularly those who are responsible for quality control: For technical personnel or technical units that do not directly belong to the tenderer ́s business, but if the capacity the tenderer will use, cf. part II, section C, separate ESPD forms shall be supplemented.
Technical facilities and quality assurance measures: The tenderer utilises the following technical facilities and quality assurance measures and the tenderer ́s survey and research facility is as follows:
Investigation and research facilities: The tenderer ́s survey and research facilitates are as follows:
Management and tracing of the supply chain: The tenderer will be able to use the following management of the supply chain and tracing systems for the execution of the contract:
Control Permission: For goods or services that are complicated, or that in exceptional cases shall be used for a particular purpose: Will the tenderer allow checks of the tenderer's production capacity or technical capacity and, where necessary, of the survey and research facilities that the tenderer has at its disposal and of quality control measures? The inspections shall be undertaken by the contracting authority or the contracting authority can leave it to a competent public body in the country where the tenderer is established.
Control Permission: For goods or services that are complicated, or that in exceptional cases shall be used for a particular purpose: Will the tenderer allow checks of the tenderer's production capacity or technical capacity and, where necessary, of the survey and research facilities that the tenderer has at its disposal and of quality control measures? The inspections shall be undertaken by the contracting authority or the contracting authority can leave it to a competent public body in the country where the tenderer is established.
Education and professional qualifications: The following education and professional qualifications are possessed by the tenderer and/or (depending on the requirements set in the notice or in the procurement documents) of the leading employees:
Minimum qualification requirements
Tenderers must have sufficient competence to carry out assignments under the framework agreement. Competence is required for the professional responsible, cf. the Damsikkerhetsforskriften § 3-5. Documentation requirement: Overview of personnel who have certification from NVE in the following disciplines in the impact classes 1, 2, 3 and 4: • Disciplines I - Concrete/brick dams with foundations • Discipline II - Filling dams with foundations • Discipline III - closing and tapping bodies, pipes and cross-layer gates • Discipline IV – Flood hydraology • Discipline V - Hydraulics and flood drainage
Education and professional qualifications: The following education and professional qualifications are possessed by the tenderer and/or (depending on the requirements set in the notice or in the procurement documents) of the leading employees:
Minimum qualification requirements
Tenderers must have sufficient competence to carry out assignments under the framework agreement. Competence is required for the professional responsible, cf. the Damsikkerhetsforskriften § 3-5. Documentation requirement: Overview of personnel who have certification from NVE in the following disciplines in the impact classes 1, 2, 3 and 4: • Disciplines I - Concrete/brick dams with foundations • Discipline II - Filling dams with foundations • Discipline III - closing and tapping bodies, pipes and cross-layer gates • Discipline IV – Flood hydraology • Discipline V - Hydraulics and flood drainage
Environmental management measures: Tenderers can employ the following environmental management measures in connection with the execution of the contract:
Number of employees in the management: The tenderer ́s number of employees in the management during the last three years was as follows:
Average workforce: The tenderer's average annual workforce in the last three years has been as follows:
Tools, materials and technical equipment.: Tenderers can use the following tools, material and technical equipment to carry out the contract:
Portion of the contract to sub-suppliers.: The tenderer is considering to outsource the following part (as a percentage) of the contract to sub-suppliers. Note that if the tenderer has decided to outsource a part of the contract to sub-suppliers and will use the sub-suppliers ́ capacity to carry out this part, a special ESPD will be supplemented for such sub-suppliers, see part II, section C, above.
Portion of the contract to sub-suppliers.: The tenderer is considering to outsource the following part (as a percentage) of the contract to sub-suppliers. Note that if the tenderer has decided to outsource a part of the contract to sub-suppliers and will use the sub-suppliers ́ capacity to carry out this part, a special ESPD will be supplemented for such sub-suppliers, see part II, section C, above.
Central certification or equivalent.: Tenderers must have the necessary professional qualifications for the execution of measures such as responsible applicant, engineering design and responsible, obligatory independent controlling in development class 3 within relevant disciplines, such as: - Construction safety - Geotechnics - Road, outdoor areas and landscape design - Cast concrete constructions - Road and ground works - Landscape design Documentation: Alt 1: Copy of central certification for the functions: PRO, SØK and KUT (Independent control) in enterprise classification 3 in relevant disciplines. Alt 2: Documentation that demonstrates that the tenderer has the necessary and relevant professional qualifications to implement measures such as PRO, SØK and KUT in development class 3 in relevant disciplines.
Minimum qualification requirements
Central certification or equivalent.: Tenderers must have the necessary professional qualifications for the execution of measures such as responsible applicant, engineering design and responsible, obligatory independent controlling in development class 3 within relevant disciplines, such as: - Construction safety - Geotechnics - Road, outdoor areas and landscape design - Cast concrete constructions - Road and ground works - Landscape design Documentation: Alt 1: Copy of central certification for the functions: PRO, SØK and KUT (Independent control) in enterprise classification 3 in relevant disciplines. Alt 2: Documentation that demonstrates that the tenderer has the necessary and relevant professional qualifications to implement measures such as PRO, SØK and KUT in development class 3 in relevant disciplines.
Minimum qualification requirements
Vilkår for deltakelse
Hovedfinansieringsvilkår og betalingsordninger og/eller henvisning til relevante bestemmelser som regulerer dem: See the tender documents
Vilkår knyttet til kontrakten
Vilkår for kontraktoppfyllelse: See the tender documents
Vilkår for deltakelse
Utestengelsesgrunn:
Barnearbeid og andre former for menneskehandel
Bedrageri
Betaling av skatter
+ 5 til
Betaling av trygdeavgifter
Deltakelse i en kriminell organisasjon
Hvitvasking eller terrorfinansiering
Korrupsjon
Terrorhandlinger eller handlinger knyttet til terrorvirksomhet
Beskrivelse av utelukkelsesgrunner:
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies,…
… in the event a enforceable verdict has been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, Involving European Communities or European Union Member States (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier.
… at the time a legally convicted verdict of participation in a criminal organisation by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Participation in a criminal organisation as defined in Article 2 of the Council ́s framework decision 2008/841/RIA of 24 October 2008 on control of organised crime (EUT L 300 of 11.11.2008, p. 42)
… in the event a legal verdict has been convicted of money laundering or financing terrorism by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Money laundering or financing terrorism As defined in Article 1 of the European Parliament and Council Directive 2005/60/EF of 26 October 2005 on preventive measures against the use of the financial system for money laundering and financing terrorism (EUT L 309 of 25.11.2005, p. 15).
… at the time a legally convicted of fraud has been convicted of fraud by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Fraud included in Article 1 of the Convention on protection of the Financial Interests of the European Communities (EFT C 316 of 27.11.1995, p. 48).
… in the event a legal verdict has been convicted of child labour and other forms of human trafficking by a verdict handed down no more than five years ago, or a rejection period determined directly in the judgement that still applies? Child labour and other forms of human trafficking as defined in Article 2 of the European Parliament and council directive 2011/36/EU of 5. 1 April 2011 on the prevention and control of human trafficking and the protection of its victims and for compensation of the Council ́s framework decision 2002/629/RIA (EUT L 101 of 15.4.2011, p. 1).
Have tenderers failed to fulfil all their social security obligations in the country where they are established and in their member state, if this is a different country than what he is established in?
Has the tenderer not fulfilled his tax and duty obligations in the country in which he is established, and in the contracting authority's member state, if this is a different country than what he is established in?
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.
Utfyllende informasjon Organ ansvarlig for meklingsprosedyrer
Navn: Hordaland tingrett bergen
Nasjonalt registreringsnummer: 974 737 418
Avdeling: Hordaland tingrett bergen
Postadresse: Postboks 7412
Postnummer: 5020
Poststed: Bergen
Region: Vestland
🏙️
Land: Norge 🇳🇴
Kontaktpunkt: Hordaland Tingrett Ber
E-post: hordaland.tingrett@domstol.no📧
Telefon: 55699700📞 Klageinstans Samme som: Organ ansvarlig for meklingsprosedyrer Tjeneste hvor informasjon om klageprosedyren kan innhentes Samme som: Navn og adresser
Kilde: OJS 2024/S 239-751725 (2024-12-05)
Kunngjøring av konkurranse (2024-12-18) Prosedyre Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2025-01-13 22:00:00 📅
Vilkår for åpning av tilbud: 2025-01-13 22:00:00 📅
Anbudsvilkår
Åpningsdato: 2025-01-13 22:00:00 📅
Frist for å be om tilleggsinformasjon: 2025-01-06 14:00:00 📅
Endringer Tekst som skal korrigeres i den opprinnelige kunngjøringen
Seksjonsnummer: PROCEDURE
Identifikasjonsnummer for delkontrakt: LOT-0000 Ny verdi
Tekst: New tender deadline: 13.01.2025 (23:00)
Annen tilleggsinformasjon
New tender deadline: 13.01.2025 (23:00)
Hovedårsak til endring: Informasjon oppdatert
Informasjon om endringer
Identifikator for endret kunngjøringsversjon: 7a8293b1-b526-4bf8-b636-f6650a1b4260-01
Kilde: OJS 2024/S 248-785280 (2024-12-18)
Kunngjøring av konkurranse (2025-01-08) Prosedyre Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2025-01-20 11:00:00 📅
Vilkår for åpning av tilbud: 2025-01-20 11:00:00 📅
Anbudsvilkår
Åpningsdato: 2025-01-20 11:00:00 📅
Frist for å be om tilleggsinformasjon: 2025-01-13 11:00:00 📅
Endringer Tekst som skal korrigeres i den opprinnelige kunngjøringen
Seksjonsnummer: PROCEDURE
Identifikasjonsnummer for delkontrakt: LOT-0000 Informasjon om endringer
Identifikator for endret kunngjøringsversjon: cf8827f9-c54a-491a-9e8d-b679b4faec24-01
Kilde: OJS 2025/S 007-015992 (2025-01-08)