The project will be set up in different phases and is planned as the following: 1. Review of technical assumptions and the project ́s overall objectives, as well as the identification of risk and uncertainties. 2. Map and document the taken capacity for the establishment of solar panels and accompanying equipment. 3. Mapping the routes for the micro-power network. 4. Map the placement of the battery bank, preferably by the high voltage transformator and the land power system. 5. Design the different sub projects for the project 6. Establish micro-power networks and solar cells in sub-projects, including control 7. Establish battery bank 8. Any operations and maintenance at a later date. Phase 6, excluded management and phase 7 is divided into the following sub-projects: - Solar panel installations at Strandgata 155 - Solar panel installations at Strandgata 151 - Solar panel installations at Strandgata 147 - Solar panel installations at Strandgata 149 - Solar panel installations at Strandgata 153 - Micro-power supply - Battery bank Phases 1 to 5, including the investment part/implementation part of the energy management system, are referred to as the immaterial part of the project. Phases 6 to 8, excluded management system, are referred to as the material part of the project. Progress: The Builder's deadline for Enova is that the project as a whole must be completed by the end of June 2026. The contractor must have the capacity to complete phase 1 up to phase 7 by the end of June 2026. The work shall be carried out in accordance with the current laws, regulations, standards and relevant documentation. Sandnes havn KF is the builder for the project.
Frist
Fristen for mottak av tilbud var 2024-01-31.
Anskaffelsen ble publisert 2023-12-19.
Kunngjøring av konkurranse (2023-12-19) Gjenstand Anskaffelsens omfang
Tittel: Solar cells, microgrid and battery bank
Referansenummer: 23/19004
Kort beskrivelse:
“The project will be set up in different phases and is planned as the following:
1. Review of technical assumptions and the project ́s overall objectives, as...”
Kort beskrivelse
The project will be set up in different phases and is planned as the following:
1. Review of technical assumptions and the project ́s overall objectives, as well as the identification of risk and uncertainties.
2. Map and document the taken capacity for the establishment of solar panels and accompanying equipment.
3. Mapping the routes for the micro-power network.
4. Map the placement of the battery bank, preferably by the high voltage transformator and the land power system.
5. Design the different sub projects for the project
6. Establish micro-power networks and solar cells in sub-projects, including control
7. Establish battery bank
8. Any operations and maintenance at a later date.
Phase 6, excluded management and phase 7 is divided into the following sub-projects:
- Solar panel installations at Strandgata 155
- Solar panel installations at Strandgata 151
- Solar panel installations at Strandgata 147
- Solar panel installations at Strandgata 149
- Solar panel installations at Strandgata 153
- Micro-power supply
- Battery bank
Phases 1 to 5, including the investment part/implementation part of the energy management system, are referred to as the immaterial part of the project. Phases 6 to 8, excluded management system, are referred to as the material part of the project.
Progress: The Builder's deadline for Enova is that the project as a whole must be completed by the end of June 2026. The contractor must have the capacity to complete phase 1 up to phase 7 by the end of June 2026.
The work shall be carried out in accordance with the current laws, regulations, standards and relevant documentation.
Sandnes havn KF is the builder for the project.
Vis mer
Kontrakttype: Bygge- og anleggsarbeid
Produkter/tjenester: Bygge- og anleggsvirksomhet📦
Estimert verdi eksklusive mva: 34 900 000 NOK 💰
Beskrivelse
Beskrivelse av anskaffelsen:
“The project will be set up in different phases and is planned as the following:
1. Review of technical assumptions and the project ́s overall objectives, as...”
Beskrivelse av anskaffelsen
The project will be set up in different phases and is planned as the following:
1. Review of technical assumptions and the project ́s overall objectives, as well as the identification of risk and uncertainties.
2. Map and document the taken capacity for the establishment of solar panels and accompanying equipment.
3. Mapping the routes for the micro-power network.
4. Map the placement of the battery bank, preferably by the high voltage transformator and the land power system.
5. Design the different sub projects for the project
6. Establish micro-power networks and solar cells in sub-projects, including control
7. Establish battery bank
8. Any operations and maintenance at a later date.
Phase 6, excluded management and phase 7 is divided into the following sub-projects:
- Solar panel installations at Strandgata 155
- Solar panel installations at Strandgata 151
- Solar panel installations at Strandgata 147
- Solar panel installations at Strandgata 149
- Solar panel installations at Strandgata 153
- Micro-power supply
- Battery bank
Phases 1 to 5, including the investment part/implementation part of the energy management system, are referred to as the immaterial part of the project. Phases 6 to 8, excluded management system, are referred to as the material part of the project.
Progress: The Builder's deadline for Enova is that the project as a whole must be completed by the end of June 2026. The contractor must have the capacity to complete phase 1 up to phase 7 by the end of June 2026.
The work shall be carried out in accordance with the current laws, regulations, standards and relevant documentation.
Sandnes havn KF is the builder for the project.
Prosedyre Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2024-01-31 12:00:00 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Juridisk, økonomisk, finansiell og teknisk informasjon Økonomisk og finansiell stilling
Liste og kort beskrivelse av utvelgelseskriterier:
“The tenderer's economic and financial capacity: Tenderers must have sufficient economic and financial capacity to fulfil the contract. Tenderers must...”
Liste og kort beskrivelse av utvelgelseskriterier
The tenderer's economic and financial capacity: Tenderers must have sufficient economic and financial capacity to fulfil the contract. Tenderers must achieve a minimum rating of "Credit worthy", i.e. tenderers must be in risk class 5 or higher on Experians scale.
In addition the tenderer, including any third-party resources, must have had the following last three (3) auditor approved fiscal years (2020, 2021 and 2022):
- average operating incomes of more than NOK 200,000.00. NOK 60 million
- average positive operating profit (EBITDA)
Vis mer Vilkår for deltakelse
Liste og kort beskrivelse av regler og kriterier:
“Quality Assurance System: Tenderers are required to have a well-functioning system for ensuring quality, adapted to the nature and scope of the assignment.”
Liste og kort beskrivelse av regler og kriterier:
“Environmental management system: Tenderers are required to have a well-functioning environmental management system, adapted to the nature and scope of the...”
Liste og kort beskrivelse av regler og kriterier
Environmental management system: Tenderers are required to have a well-functioning environmental management system, adapted to the nature and scope of the assignment.
Vis mer
Liste og kort beskrivelse av vilkår:
“The organisational and legal position of the tenderer.: Tenderers shall be registered in a company register, professional register or a commerce register in...”
Liste og kort beskrivelse av vilkår
The organisational and legal position of the tenderer.: Tenderers shall be registered in a company register, professional register or a commerce register in the country where the tenderer is established.
Vis mer Teknisk og faglig kapasitet
Liste og kort beskrivelse av utvelgelseskriterier:
“The tenderer ́s technical and professional qualifications.: Tenderers shall have experience from at least two (2) relevant assignments that state that the...”
Liste og kort beskrivelse av utvelgelseskriterier
The tenderer ́s technical and professional qualifications.: Tenderers shall have experience from at least two (2) relevant assignments that state that the tenderer can handle the extent of the work described in the tender documentation with annexes as regards scope and complexity.
Vis mer Vilkår for deltakelse
Hovedfinansieringsvilkår og betalingsordninger og/eller henvisning til relevante bestemmelser som regulerer dem:
“See the tender documentation and annexes.” Vilkår knyttet til kontrakten
Vilkår for kontraktoppfyllelse:
“See the tender documentation and annexes.”
Kunngjøring av konkurranse (2024-01-24) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
“The project will be set up in different phases and is planned as the following: 1. Review of technical assumptions and the project ́s overall objectives, as...”
Kort beskrivelse
The project will be set up in different phases and is planned as the following: 1. Review of technical assumptions and the project ́s overall objectives, as well as the identification of risk and uncertainties. 2. Map and document the taken capacity for the establishment of solar panels and accompanying equipment. 3. Mapping the routes for the micro-power network. 4. Map the placement of the battery bank, preferably by the high voltage transformator and the land power system. 5. Design the different sub projects for the project 6. Establish micro-power networks and solar cells in sub-projects, including control 7. Establish battery bank 8. Any operations and maintenance at a later date. Phase 6, excluded management and phase 7 is divided into the following sub-projects: - Solar panel installations at Strandgata 155 - Solar panel installations at Strandgata 151 - Solar panel installations at Strandgata 147 - Solar panel installations at Strandgata 149 - Solar panel installations at Strandgata 153 - Micro-power supply - Battery bank Phases 1 to 5, including the investment part/implementation part of the energy management system, are referred to as the immaterial part of the project. Phases 6 to 8, excluded management system, are referred to as the material part of the project. Progress: The Builder's deadline for Enova is that the project as a whole must be completed by the end of June 2026. The contractor must have the capacity to complete phase 1 up to phase 7 by the end of June 2026. The work shall be carried out in accordance with the current laws, regulations, standards and relevant documentation. Sandnes havn KF is the builder for the project.
Vis mer
Estimert verdi eksklusive mva: 34 900 000 NOK 💰
Beskrivelse
Beskrivelse av anskaffelsen:
“The project will be set up in different phases and is planned as the following: 1. Review of technical assumptions and the project ́s overall objectives, as...”
Beskrivelse av anskaffelsen
The project will be set up in different phases and is planned as the following: 1. Review of technical assumptions and the project ́s overall objectives, as well as the identification of risk and uncertainties. 2. Map and document the taken capacity for the establishment of solar panels and accompanying equipment. 3. Mapping the routes for the micro-power network. 4. Map the placement of the battery bank, preferably by the high voltage transformator and the land power system. 5. Design the different sub projects for the project 6. Establish micro-power networks and solar cells in sub-projects, including control 7. Establish battery bank 8. Any operations and maintenance at a later date. Phase 6, excluded management and phase 7 is divided into the following sub-projects: - Solar panel installations at Strandgata 155 - Solar panel installations at Strandgata 151 - Solar panel installations at Strandgata 147 - Solar panel installations at Strandgata 149 - Solar panel installations at Strandgata 153 - Micro-power supply - Battery bank Phases 1 to 5, including the investment part/implementation part of the energy management system, are referred to as the immaterial part of the project. Phases 6 to 8, excluded management system, are referred to as the material part of the project. Progress: The Builder's deadline for Enova is that the project as a whole must be completed by the end of June 2026. The contractor must have the capacity to complete phase 1 up to phase 7 by the end of June 2026. The work shall be carried out in accordance with the current laws, regulations, standards and relevant documentation. Sandnes havn KF is the builder for the project.
Juridisk, økonomisk, finansiell og teknisk informasjon Økonomisk og finansiell stilling
Liste og kort beskrivelse av utvelgelseskriterier:
“The tenderer's economic and financial capacity: Tenderers must have sufficient economic and financial capacity to fulfil the contract. Tenderers must...”
Liste og kort beskrivelse av utvelgelseskriterier
The tenderer's economic and financial capacity: Tenderers must have sufficient economic and financial capacity to fulfil the contract. Tenderers must achieve a minimum rating of "Credit worthy", i.e. tenderers must be in risk class 5 or higher on Experians scale. In addition the tenderer, including any third-party resources, must have had the following last three (3) auditor approved fiscal years (2020, 2021 and 2022): - average operating incomes of more than NOK 200,000.00. NOK 60 million - average positive operating profit (EBITDA)
Kunngjøring av konkurranse (2024-01-25) Gjenstand Anskaffelsens omfang
Estimert verdi eksklusive mva: 34 900 000 NOK 💰
Prosedyre Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2024-02-05 12:00:00 📅
Kilde: OJS 2024/S 019-055007 (2024-01-25)