The new water source will be connected to the new water treatment plant. Contract K01 comprises parts of the transmission pipeline and covers approx. 5.5 km of new main water pipeline.
The upper part and the crossing of Hornnes Lake are in 630 PE100 (approx. 1.1 km + 0.6 km), the remaining part is in 500 mm tensile strength ductile cast iron. The installation is mainly to be established as a pipeline in a ditch with an average covering of 1.6 m (1.2 - 4 m). The contract also includes associated valve manholes, air manholes, local supply pipeline, and sewage water pipeline, conduits, and cables. A path over the route is also to be established along Slettebø Lake for approx. 1200 m.
Frist
Fristen for mottak av tilbud var 2022-12-07.
Anskaffelsen ble publisert 2022-11-05.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2022-11-05) Gjenstand Anskaffelsens omfang
Tittel: Ancillary works for water pipelines
Kort beskrivelse:
“The new water source will be connected to the new water treatment plant. Contract K01 comprises parts of the transmission pipeline and covers approx. 5.5 km...”
Kort beskrivelse
The new water source will be connected to the new water treatment plant. Contract K01 comprises parts of the transmission pipeline and covers approx. 5.5 km of new main water pipeline.
“The new water source will be connected to the new water treatment plant.”
Kilde: OJS 2022/S 217-622238 (2022-11-05)
Kunngjøring om tildeling av kontrakt (2023-03-10) Gjenstand Anskaffelsens omfang
Totalverdi for anskaffelsen: 66 852 500 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt