Contract work related to the realisation of CO2 capture consists of several contracts. Contract C3 is planned to start in February/March 2023 and last until May 2024. Other construction work and activities will take place in connection with the design and operation of the factory during this period.
Contract C3 mainly consists of structural steel. There are several steel superstructures to be installed on prepared concrete foundations. In addition there will be the construction of steel bridges. The contract also consists of assembly of cladding and roofing on the superstructures. Some walkways, platforms, stairs and ladders are also within the scope of the contract.
Click here https://permalink.mercell.com/183087534.aspx
Frist
Fristen for mottak av tilbud var 2022-08-26.
Anskaffelsen ble publisert 2022-07-13.
Kunngjøring av konkurranse (2022-07-13) Gjenstand Anskaffelsens omfang
Tittel: Structural steelworks
Kort beskrivelse:
“Contract work related to the realisation of CO2 capture consists of several contracts. Contract C3 is planned to start in February/March 2023 and last until...”
Kort beskrivelse
Contract work related to the realisation of CO2 capture consists of several contracts. Contract C3 is planned to start in February/March 2023 and last until May 2024. Other construction work and activities will take place in connection with the design and operation of the factory during this period.
Vis mer Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Stålkonstruksjonsarbeid📦
Tilleggs-CPV: Bygge- og anleggsvirksomhet📦 Utførelsessted
NUTS-region: Vestfold og Telemark🏙️
Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet