Establishment of approx. 810 meters of long hole drilling in the mountains. Diameter of approx. 600mm. Waste water lines and water supply lines will be drawn through the bore holes. In addition, conduit pipes for fiber and high-voltage cables must be drawn through conduit in the same borehole.
Frist
Fristen for mottak av tilbud var 2022-08-26.
Anskaffelsen ble publisert 2022-07-06.
Kunngjøring av konkurranse (2022-07-06) Gjenstand Anskaffelsens omfang
Tittel: Construction work for water and sewage pipelines
Referansenummer: 22/18
Kort beskrivelse:
“Establishment of approx. 810 meters of long hole drilling in the mountains. Diameter of approx. 600mm. Waste water lines and water supply lines will be...”
Kort beskrivelse
Establishment of approx. 810 meters of long hole drilling in the mountains. Diameter of approx. 600mm. Waste water lines and water supply lines will be drawn through the bore holes. In addition, conduit pipes for fiber and high-voltage cables must be drawn through conduit in the same borehole.
Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet