Nordre Follo kommune (Nordre Follo Municipality) plans to build a new four parallel primary school in Sofiemyr sports park at Kolbotn. The school is planned to be built over three to four floors with a gross area of approx. 8 300 m. There is lots of space on the building site which is located in the immediate vicinity of E6. The school must be completed in October 2023, outdoor must be completed in January 2024.
The site is currently zoned as a lower secondary school and sports halls, work has begun to rezone and facilitate for a primary school. There are a number of requirements in the area plan for Sofiemyr sports park that must be taken into account. Among other things, this applies to the preparation of the walkway and relocation of access.
In the concept selection study the contract cost for a four parallel school is estimated to be approx. NOK 200 000 000 excluding VAT.
The contracting authority has chosen an interaction contract as the execution model. The purpose of this procurement is to enter into a contract with an experienced contractor for engineering design and the construction of the buildings.
Click here https://permalink.mercell.com/154579691.aspx.

Frist

Fristen for mottak av tilbud var 2021-07-07. Anskaffelsen ble publisert 2021-06-03.

Leverandører

Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:

Hvem? Hva? Hvor?
Anskaffelseshistorikk
Dato Dokument
2021-06-03 Kunngjøring av konkurranse
2021-12-29 Kunngjøring om tildeling av kontrakt
Kunngjøring av konkurranse (2021-06-03)
Gjenstand
Anskaffelsens omfang
Tittel: Construction work for school buildings
Referansenummer: 21/08434
Kort beskrivelse:
Nordre Follo kommune (Nordre Follo Municipality) plans to build a new four parallel primary school in Sofiemyr sports park at Kolbotn. The school is planned to be built over three to four floors with a gross area of approx. 8 300 m The site is currently zoned as a lower secondary school and sports halls, work has begun to rezone and facilitate for a primary school. There are a number of requirements in the area plan for Sofiemyr sports park that must be taken into account. Among other things, this applies to the preparation of the walkway and relocation of access. In the concept selection study the contract cost for a four parallel school is estimated to be approx. NOK 200 000 000 excluding VAT. The contracting authority has chosen an interaction contract as the execution model. The purpose of this procurement is to enter into a contract with an experienced contractor for engineering design and the construction of the buildings. Click here https://permalink.mercell.com/154579691.aspx.
Vis mer
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS)
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsarbeid i forbindelse med skolebygninger 📦
Tilleggs-CPV: Arkitekt-, ingeniør- og planleggingstjenester 📦
Utførelsessted
NUTS-region: Viken 🏙️

Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet

Oppdragsgiver
Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Regional eller lokal myndighet
Navn på tildelende myndighet: Nordre follo Kommune
Postadresse: Idrettsveien 8
Postnummer: 1400
Poststed: Ski
Kontakt
Internettadresse: https://permalink.mercell.com/154579691.aspx 🌏
E-post: beate.haugsjordet@nordrefollo.kommune.no 📧
URL for dokumenter: https://permalink.mercell.com/154579691.aspx 🌏
URL for deltakelse: https://permalink.mercell.com/154579691.aspx 🌏

Referanse
Datoer
Sendt dato: 2021-06-03 📅
Innleveringsfrist: 2021-07-07 📅
Publiseringsdato: 2021-06-08 📅
Identifikatorer
Kunngjøringsnummer: 2021/S 109-287999
OJ-S-utgave: 109

Gjenstand
Anskaffelsens omfang
Kort beskrivelse:
Nordre Follo kommune (Nordre Follo Municipality) plans to build a new four parallel primary school in Sofiemyr sports park at Kolbotn. The school is planned to be built over three to four floors with a gross area of approx. 8 300 m
The site is currently zoned as a lower secondary school and sports halls, work has begun to rezone and facilitate for a primary school. There are a number of requirements in the area plan for Sofiemyr sports park that must be taken into account. Among other things, this applies to the preparation of the walkway and relocation of access.
Vis mer
In the concept selection study the contract cost for a four parallel school is estimated to be approx. NOK 200 000 000 excluding VAT.
The contracting authority has chosen an interaction contract as the execution model. The purpose of this procurement is to enter into a contract with an experienced contractor for engineering design and the construction of the buildings.
The project will be carried out in two phases.
In phase 1, the Development Phase, the contractor will participate in a process where the existing project material is adapted and optimised in cooperation with the users. This will form the basis for the use and organisation of the school and sports areas on a more detailed level. During phase 1 the contracting authority and the contractor will further develop a preliminary project and a target price for the implementation of engineering design and construction.
Vis mer
If the preliminary project is approved and the parties agree on a target sum, engineering design and construction will take place in phase 2, the Implementation phase.
Continuation of Phase 2 will initially be implemented with the agreed target price. Alternatively the parties can agree; continuation as an ordinary fixed price turnkey contract.
A comprehensive description of the procurement is in the tender documentation part 2.
Varighet: 24 måneder
Beskrivelse av opsjoner:
The detailed development plan for Ski West Secondary School states that the multi-purpose hall that will cover the gym need for Ski West Secondary School and Finstad Primary School is to be located by Finstad Primary School in accordance with the general permission given there. The assessments regarding the need for the contents of the multi-purpose hall are planned to be presented in June 2021 in consideration of the municipality's long-term operating and investment plan.
Vis mer

Prosedyre
Rettslig grunnlag: 32014L0024
Tidspunkt for mottak av tilbud: 12:00
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Tilbudets gyldighetsperiode: 3 måneder

Oppdragsgiver
Identitet
Nasjonalt registreringsnummer: 922092648
Kontakt
Kontaktpunkt: Beate Haugsjordet
URL for dokumenter: https://permalink.mercell.com/154579691.aspx 🌏

Utfyllende informasjon
Klageinstans
Navn: Follo tingrett
Poststed: Ski
Land: Norge 🇳🇴
Kilde: OJS 2021/S 109-287999 (2021-06-03)
Kunngjøring om tildeling av kontrakt (2021-12-29)
Gjenstand
Anskaffelsens omfang
Kort beskrivelse:
Nordre Follo kommune [Nordre Follo Municipality] plans to build a new four parallel primary school in Sofiemyr sports park at Kolbotn. The school is planned to be built over three to four floors with a gross area of approx. 8,300 m2. There is lots of space on the building site which is located in the immediate vicinity of E6. The school must be completed in October 2023, outdoor must be completed in January 2024. The site is currently zoned as a lower secondary school and sports halls, work has begun to rezone and facilitate for a primary school. There are a number of requirements in the area plan for Sofiemyr sports park that must be taken into account. Among other things, this applies to the preparation of the walkway and relocation of access. In the concept selection study the contract cost for a four parallel school is estimated to be approx. NOK 200 million excluding VAT. The contracting authority has chosen an interaction contract as the execution model. The purpose of this procurement is to enter into a contract with an experienced contractor for engineering design and the construction of the buildings.
Vis mer
Totalverdi for anskaffelsen: 162 996 500 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt

Prosedyre
Tilbudstype: Ikke aktuelt

Oppdragsgiver
Identitet
Navn på tildelende myndighet: Nordre follo kommune
Poststed: Ski

Referanse
Datoer
Sendt dato: 2021-12-29 📅
Publiseringsdato: 2022-01-03 📅
Identifikatorer
Kunngjøringsnummer: 2022/S 001-002040
Refererer til kunngjøring: 2021/S 109-287999
OJ-S-utgave: 1

Gjenstand
Anskaffelsens omfang
Kort beskrivelse:
Nordre Follo kommune [Nordre Follo Municipality] plans to build a new four parallel primary school in Sofiemyr sports park at Kolbotn. The school is planned to be built over three to four floors with a gross area of approx. 8,300 m2. There is lots of space on the building site which is located in the immediate vicinity of E6. The school must be completed in October 2023, outdoor must be completed in January 2024.
Vis mer
In the concept selection study the contract cost for a four parallel school is estimated to be approx. NOK 200 million excluding VAT.

Prosedyre
Tildelingskriterier
Kvalitetskriterium (navn): Assignment comprehension
Kvalitetskriterium (vekting): 30%
Kvalitetskriterium (navn): Offered team
Kvalitetskriterium (vekting): 20%
Kvalitetskriterium (navn): The team's suitability
Pris (vekting): 20%

Tildeling av kontrakt
Dato for kontraktinngåelse: 2021-12-22 📅
Navn: Betonmast Østfold AS
Postadresse: Kalnesveien 1
Poststed: Grålum
Postnummer: 1712
Land: Norge 🇳🇴
Telefon: +47 22175480 📞
E-post: ostfold@betonmast.no 📧
Land: Oslo 🏙️
Totalverdi for anskaffelsen: 162 996 500 NOK 💰
Informasjon om tilbud
Antall mottatte tilbud: 4
Kilde: OJS 2022/S 001-002040 (2021-12-29)