Nordre Follo Municipality, hereafter called the contracting authority, plans to construct a new secondary school in Ski, 'Ski West Secondary School'. The school is to be designed as an 8 parallel secondary school, which for a period, must will also be used by Finstad Primary School. An 8 parallel secondary school will have 672 — 720 pupils and approx. 90 employees. The contracting authority also plans to construct a multipurpose hall, 'Finstad Multipurpose Hall'. The multipurpose hall will cover the gym classes need for Ski West Secondary School and Finstad Primary School. The multipurpose hall will be located by Finstad Primary School. The multipurpose hall is included as an option in the procurement. The contracting authority has chosen an interaction contract as the execution model. The aim of this procurement is to enter into a contract with an experienced turnkey contractor for the engineering design services for and the construction of the buildings. Click here https://permalink.mercell.com/146660513.aspx.
Frist
Fristen for mottak av tilbud var 2021-06-07.
Anskaffelsen ble publisert 2021-04-30.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2021-04-30) Gjenstand Anskaffelsens omfang
Tittel: Primary school construction work
Referansenummer: 21/06161
Kort beskrivelse:
Nordre Follo Municipality, hereafter called the contracting authority, plans to construct a new secondary school in Ski, 'Ski West Secondary School'.
The school is to be designed as an 8 parallel secondary school, which for a period, must will also be used by Finstad Primary School. An 8 parallel secondary school will have 672 — 720 pupils and approx. 90 employees. The contracting authority also plans to construct a multipurpose hall, 'Finstad Multipurpose Hall'. The multipurpose hall will cover the gym classes need for Ski West Secondary School and Finstad Primary School. The multipurpose hall will be located by Finstad Primary School. The multipurpose hall is included as an option in the procurement.
The contracting authority has chosen an interaction contract as the execution model. The aim of this procurement is to enter into a contract with an experienced turnkey contractor for the engineering design services for and the construction of the buildings.
Click here https://permalink.mercell.com/146660513.aspx.
Nordre Follo Municipality, hereafter called the contracting authority, plans to construct a new secondary school in Ski, 'Ski West Secondary School'.
The school is to be designed as an 8 parallel secondary school, which for a period, must will also be used by Finstad Primary School. An 8 parallel secondary school will have 672 — 720 pupils and approx. 90 employees. The contracting authority also plans to construct a multipurpose hall, 'Finstad Multipurpose Hall'. The multipurpose hall will cover the gym classes need for Ski West Secondary School and Finstad Primary School. The multipurpose hall will be located by Finstad Primary School. The multipurpose hall is included as an option in the procurement.
The contracting authority has chosen an interaction contract as the execution model. The aim of this procurement is to enter into a contract with an experienced turnkey contractor for the engineering design services for and the construction of the buildings.
Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
Nordre Follo Municipality, hereafter called the contracting authority, plans to construct a new secondary school in Ski, 'Ski West Secondary School'.
The school is to be designed as an 8 parallel secondary school, which for a period, must will also be used by Finstad Primary School. An 8 parallel secondary school will have 672 — 720 pupils and approx. 90 employees. The contracting authority also plans to construct a multipurpose hall, 'Finstad Multipurpose Hall'. The multipurpose hall will cover the gym classes need for Ski West Secondary School and Finstad Primary School. The multipurpose hall will be located by Finstad Primary School. The multipurpose hall is included as an option in the procurement.
The school is to be designed as an 8 parallel secondary school, which for a period, must will also be used by Finstad Primary School. An 8 parallel secondary school will have 672 — 720 pupils and approx. 90 employees. The contracting authority also plans to construct a multipurpose hall, 'Finstad Multipurpose Hall'. The multipurpose hall will cover the gym classes need for Ski West Secondary School and Finstad Primary School. The multipurpose hall will be located by Finstad Primary School. The multipurpose hall is included as an option in the procurement.
The contracting authority has chosen an interaction contract as the execution model. The aim of this procurement is to enter into a contract with an experienced turnkey contractor for the engineering design services for and the construction of the buildings.
The contracting authority has chosen an interaction contract as the execution model. The aim of this procurement is to enter into a contract with an experienced turnkey contractor for the engineering design services for and the construction of the buildings.
Estimert totalverdi: 350 000 000 NOK 💰
Kort beskrivelse:
The project will be carried out in two phases.
In phase 1, the Development Phase, the turnkey contractor must participate in a process where the existing project material is adapted and optimised in cooperation with the users. This will form the basis for the use and organisation of the school and sports areas on a more detailed level. In phase 1 the contracting authority and the turnkey contractor must continue to prepare a preliminary project and a fixed price for the execution of the engineering design services and the construction.
In phase 1, the Development Phase, the turnkey contractor must participate in a process where the existing project material is adapted and optimised in cooperation with the users. This will form the basis for the use and organisation of the school and sports areas on a more detailed level. In phase 1 the contracting authority and the turnkey contractor must continue to prepare a preliminary project and a fixed price for the execution of the engineering design services and the construction.
If the preliminary project is approved and the parties agree on the contract sum, the engineering design services and the construction will take place in phase 2 the Execution Phase.
A detailed description of the delivery is in the tender documentation part 2.
Estimert verdi eksklusive mva: 350 000 000 NOK 💰
Beskrivelse av opsjoner:
The detailed development plan for Ski West Secondary School states that the multipurpose hall that will cover the gym need for Ski West Secondary School and Finstad Primary School is to be located by Finstad Primary School in accordance with the general permission given there. Assessments on the what will be included in the multipurpose hall are scheduled to be submitted in June 2021 when the municipality's long term operation and investment plan is discussed.
The detailed development plan for Ski West Secondary School states that the multipurpose hall that will cover the gym need for Ski West Secondary School and Finstad Primary School is to be located by Finstad Primary School in accordance with the general permission given there. Assessments on the what will be included in the multipurpose hall are scheduled to be submitted in June 2021 when the municipality's long term operation and investment plan is discussed.
Prosedyre
Rettslig grunnlag: 32014L0024
Tidspunkt for mottak av tilbud: 12:00
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Tilbudets gyldighetsperiode: 6 måneder
Kunngjøring om tildeling av kontrakt (2021-10-22) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
Nordre Follo Municipality, hereafter called the Contracting Authority, plans to construct a new secondary school in Ski, 'Ski West Secondary School'.
The school is to be designed as an 8 parallel secondary school, which for a period, must will also be used by Finstad Primary School. An 8 parallel secondary school wil lhave 672 - 720 pupils and approx. 90 employees. The Contracting Authority also plans to construct a multipurpose hall, 'Finstad Multipurpose Hall'. The multipurpose hall will cover the gym classes need for Ski West Secondary School and Finstad Primary School. The multipurpose hall will be located by Finstad Primary School. The multipurpose hall is included as an option in the procurement.
The contracting authority has chosen an interaction contract as the execution model. The aim of this procurement is to enter into a contract with an experienced turnkey contractor for the engineering design services for and the construction of the buildings.
Nordre Follo Municipality, hereafter called the Contracting Authority, plans to construct a new secondary school in Ski, 'Ski West Secondary School'.
The school is to be designed as an 8 parallel secondary school, which for a period, must will also be used by Finstad Primary School. An 8 parallel secondary school wil lhave 672 - 720 pupils and approx. 90 employees. The Contracting Authority also plans to construct a multipurpose hall, 'Finstad Multipurpose Hall'. The multipurpose hall will cover the gym classes need for Ski West Secondary School and Finstad Primary School. The multipurpose hall will be located by Finstad Primary School. The multipurpose hall is included as an option in the procurement.
The contracting authority has chosen an interaction contract as the execution model. The aim of this procurement is to enter into a contract with an experienced turnkey contractor for the engineering design services for and the construction of the buildings.
Totalverdi for anskaffelsen: 350 000 000 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Prosedyre
Tilbudstype: Ikke aktuelt
Oppdragsgiver Identitet
Navn på tildelende myndighet: Nordre follo kommune
Poststed: Ski
Referanse Datoer
Sendt dato: 2021-10-22 📅
Publiseringsdato: 2021-10-27 📅
Identifikatorer
Kunngjøringsnummer: 2021/S 209-548855
Refererer til kunngjøring: 2021/S 087-226631
OJ-S-utgave: 209
Gjenstand Anskaffelsens omfang
Kort beskrivelse:
Nordre Follo Municipality, hereafter called the Contracting Authority, plans to construct a new secondary school in Ski, 'Ski West Secondary School'.
The school is to be designed as an 8 parallel secondary school, which for a period, must will also be used by Finstad Primary School. An 8 parallel secondary school wil lhave 672 - 720 pupils and approx. 90 employees. The Contracting Authority also plans to construct a multipurpose hall, 'Finstad Multipurpose Hall'. The multipurpose hall will cover the gym classes need for Ski West Secondary School and Finstad Primary School. The multipurpose hall will be located by Finstad Primary School. The multipurpose hall is included as an option in the procurement.
The school is to be designed as an 8 parallel secondary school, which for a period, must will also be used by Finstad Primary School. An 8 parallel secondary school wil lhave 672 - 720 pupils and approx. 90 employees. The Contracting Authority also plans to construct a multipurpose hall, 'Finstad Multipurpose Hall'. The multipurpose hall will cover the gym classes need for Ski West Secondary School and Finstad Primary School. The multipurpose hall will be located by Finstad Primary School. The multipurpose hall is included as an option in the procurement.
Beskrivelse av opsjoner:
The detailed development plan for Ski West Secondary School states that the multi-purpose hall that will cover the gym need for Ski West Secondary School and Finstad Primary School is to be located by Finstad Primary School in accordance with the general permission given there. Assessments on the what will be included in the multipurpose hall are scheduled to be submitted in June 2021 when the municipality's long term operation and investment plan is discussed.
The detailed development plan for Ski West Secondary School states that the multi-purpose hall that will cover the gym need for Ski West Secondary School and Finstad Primary School is to be located by Finstad Primary School in accordance with the general permission given there. Assessments on the what will be included in the multipurpose hall are scheduled to be submitted in June 2021 when the municipality's long term operation and investment plan is discussed.
Tildeling av kontrakt
Dato for kontraktinngåelse: 2021-10-21 📅
Navn: Hent AS (hovedenhet)
Postadresse: Vestre Rosten 79
Poststed: Heimdal
Postnummer: 7072
Land: Norge 🇳🇴 Viken
🏙️
Totalverdi for anskaffelsen: 350 000 000 NOK 💰
Informasjon om tilbud
Antall mottatte tilbud: 3
Kilde: OJS 2021/S 209-548855 (2021-10-22)