A 100 metre long avalanche superstructure shall constructed. The superstructure must be connected to County road (Norwegian: Fv.) 862 Svarthollatunnelen (the Svartholla tunnel). The avalanche superstructure shall be built in its entirety with a closed concrete wall facing rock. In front, columns with binders at the top will be erected with a roof above this made of prefabricated
elements. Traction pipes and manholes shall be established for the electrical system and the existing electrical system shall be safeguarded.
See the tender documents for more information.
Frist
Fristen for mottak av tilbud var 2022-02-11.
Anskaffelsen ble publisert 2021-12-20.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2021-12-20) Gjenstand Anskaffelsens omfang
Tittel: Construction work for tunnels, shafts and subways
Referansenummer: 21/17955
Kort beskrivelse:
“A 100 metre long avalanche superstructure shall constructed. The superstructure must be connected to County road (Norwegian: Fv.) 862 Svarthollatunnelen...”
Kort beskrivelse
A 100 metre long avalanche superstructure shall constructed. The superstructure must be connected to County road (Norwegian: Fv.) 862 Svarthollatunnelen (the Svartholla tunnel). The avalanche superstructure shall be built in its entirety with a closed concrete wall facing rock. In front, columns with binders at the top will be erected with a roof above this made of prefabricated
“The drafts of elements must be approved by the Directorate of Public Roads (Vegdirektoratet)”
Kilde: OJS 2021/S 250-665312 (2021-12-20)
Kunngjøring om tildeling av kontrakt (2022-05-11) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
“A 100 metre long avalanche superstructure shall constructed. The superstructure must be connected to County road (Norwegian: Fv.) 862 Svarthollatunnelen...”
Kort beskrivelse
A 100 metre long avalanche superstructure shall constructed. The superstructure must be connected to County road (Norwegian: Fv.) 862 Svarthollatunnelen (the Svartholla tunnel). The avalanche superstructure shall be built in its entirety with a closed concrete wall facing rock. In front, columns with binders at the top will be erected with a roof above this made of prefabricated
Vis mer
Totalverdi for anskaffelsen: 60 195 770 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt