The project will establish two new buildings to passive house standard on the school site in addition to rehabilitation of the existing, protected wooden buildings. A total of approximately 12 700 m. The outdoor areas will also be upgraded and President Harbitz gate will be permanently closed for vehicle traffic and integrated in the school yard. Footpath widening in Holtegata is part of the project.
Interaction contract after a contest with pre-qualification and negotiation.
Frist
Fristen for mottak av tilbud var 2021-04-12.
Anskaffelsen ble publisert 2021-03-05.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2021-03-05) Gjenstand Anskaffelsens omfang
Tittel: Construction work
Referansenummer: 21/1774
Kort beskrivelse:
“The project will establish two new buildings to passive house standard on the school site in addition to rehabilitation of the existing, protected wooden...”
Kort beskrivelse
The project will establish two new buildings to passive house standard on the school site in addition to rehabilitation of the existing, protected wooden buildings. A total of approximately 12 700 m
Vis mer Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsvirksomhet📦
Tilleggs-CPV: Bygge- og anleggsvirksomhet📦 Utførelsessted
NUTS-region: Norge🏙️
Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
“A site inspection will be held with all suppliers on 16 March 2021, 14:30, President Harbitz’ gate 11, 0259 Oslo.”
Kilde: OJS 2021/S 048-121903 (2021-03-05)
Kunngjøring om tildeling av kontrakt (2021-09-24) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
“The project will establish two new buildings to passive house standard on the school site in addition to rehabilitation of the existing, protected wooden...”
Kort beskrivelse
The project will establish two new buildings to passive house standard on the school site in addition to rehabilitation of the existing, protected wooden buildings. A total of approximately 12,700 m2. The outdoor areas will also be upgraded and President Harbitz gate will be permanently closed for vehicle traffic and integrated in the school yard. Footpath widening in Holtegata is part of the project.
Vis mer
Totalverdi for anskaffelsen: 550 000 000 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt