The assignment will at first run until phase 1 has been completed. If the cost calculations show that the costs will, in total, be too great, or if, for example, a political decision stops the project, or that further cooperation with the contractor is not possible, the contracting authority can end the assignment after phase 1. See the tender documentation Part 1, point 2.1.2.