The route shows many signs of problems with tele and capacity failure. The road will be made new along the entire stretch with the existing road foundation and asphalt as part of the new road. The new road will be raised approx. 0.5 m and displaced approx. 1 m toward the east, otherwise there will be little change to the curvature. The stretch runs alongside Nisservatn. The terrain on the inside of the existing road has a unilateral fall towards Nisser all the way, the masses that will be excavated here for parts of the new road consist primarily of moors and rock, with a thin layer of vegetation cover. No studies have been conducted concerning the scope of rock/loose mass so it is assessed on how it looks. There is a mass disposal site in the line that is used with enough capacity.
Form of contract is performance contracting.
The contract type is unit price contract.
Frist
Fristen for mottak av tilbud var 2020-06-30.
Anskaffelsen ble publisert 2020-05-28.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2020-05-28) Gjenstand Anskaffelsens omfang
Tittel: Construction work
Referansenummer: 20/94173
Kort beskrivelse:
“The route shows many signs of problems with tele and capacity failure. The road will be made new along the entire stretch with the existing road foundation...”
Kort beskrivelse
The route shows many signs of problems with tele and capacity failure. The road will be made new along the entire stretch with the existing road foundation and asphalt as part of the new road. The new road will be raised approx. 0.5 m and displaced approx. 1 m toward the east, otherwise there will be little change to the curvature. The stretch runs alongside Nisservatn. The terrain on the inside of the existing road has a unilateral fall towards Nisser all the way, the masses that will be excavated here for parts of the new road consist primarily of moors and rock, with a thin layer of vegetation cover. No studies have been conducted concerning the scope of rock/loose mass so it is assessed on how it looks. There is a mass disposal site in the line that is used with enough capacity.
Vis mer Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsvirksomhet📦
Tilleggs-CPV: Bygge- og anleggsvirksomhet📦 Utførelsessted
NUTS-region: no03 🏙️
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Laveste pris
“The opening of the tenders is not open to the public. The tenders will be opened in CTM.”
Kilde: OJS 2020/S 105-255258 (2020-05-28)
Kunngjøring om tildeling av kontrakt (2020-09-04) Gjenstand Anskaffelsens omfang
Totalverdi for anskaffelsen: 39 507 988 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Prosedyre
Tilbudstype: Ikke aktuelt
Oppdragsgiver Identitet
Navn på tildelende myndighet: Statens vegvesen