The Norwegian government has in accordance with the railway reform decided to introduce competitive bidding for the passenger rail traffic. This has opened the possibility for several passenger train operators in Norway. Currently, there is no common standard for estimating the number of passengers onboard, and the train operators are free to choose their own methodology for estimating the number of journeys. A study showed there will be a need to acquire a common statistical model for the sector. This is to ensure comparable and credible figures for passenger numbers to be used in revenue distribution, reporting and analysis of train services across train operators.
See the tender documentation for further information.
Frist
Fristen for mottak av tilbud var 2020-03-09.
Anskaffelsen ble publisert 2020-02-06.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2020-02-06) Gjenstand Anskaffelsens omfang
Tittel: IT services: consulting, software development, Internet and support
Referansenummer: 201901489
Kort beskrivelse:
“The Norwegian government has in accordance with the railway reform decided to introduce competitive bidding for the passenger rail traffic. This has opened...”
Kort beskrivelse
The Norwegian government has in accordance with the railway reform decided to introduce competitive bidding for the passenger rail traffic. This has opened the possibility for several passenger train operators in Norway. Currently, there is no common standard for estimating the number of passengers onboard, and the train operators are free to choose their own methodology for estimating the number of journeys. A study showed there will be a need to acquire a common statistical model for the sector. This is to ensure comparable and credible figures for passenger numbers to be used in revenue distribution, reporting and analysis of train services across train operators.
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
“The stated value of the procurement is only an estimate without commitment for Jernbanedirektoratet. The estimate is uncertain as we have no previous...”
The stated value of the procurement is only an estimate without commitment for Jernbanedirektoratet. The estimate is uncertain as we have no previous statistics on similar procurement.
Kunngjøring om tildeling av kontrakt (2020-04-20) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
“In the railway reform, it was decided to put passenger traffic on the Norwegian Railway out for competitive tendering. This has opened up for multiple train...”
Kort beskrivelse
In the railway reform, it was decided to put passenger traffic on the Norwegian Railway out for competitive tendering. This has opened up for multiple train operators in Norway. Currently there is no standard for calculation of passenger numbers, the train operators are free to choose which method they will use for calculation of the number of trips. A survey showed that there is a need to procure a joint statistics model for the sector. This is to ensure comparable and trustworthy numbers in income distributions, reporting and analysis of the train offer across the train operators.
Vis mer
Totalverdi for anskaffelsen: 17 000 000 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
“The value of the procurement is only an estimate that is non-binding for the Jernbanedirektoratet (the Norwegian Railway Directorate).”
Kilde: OJS 2020/S 079-187509 (2020-04-20)