Norwegian authorities have had clear ambitions connected to carbon capture and storage for a long time. Norcem Brevik and the waste incineration plant at Klemetsrud are to two Norwegian sites that are now being considered for CO2 capture. The cement industry has large CO2 emissions. Globally it amounts to 5-7 % of the total CO2 emissions (1.9 gigatons CO2 a year). In Norway the share is 2 %. Norcem Brevik emits between 820 000 and 890 000 tonnes CO2 a year. Norcem, with its owner HeidelbergCement, has a vision of zero emissions of CO2 from concrete products when seen over a life cycle perspective in 2030. In order to achieve this vision, it is necessary to capture CO2 from cement production. If the measure is realised, Norcem Brevik will be the world's first cement factory with full-scale CO2 capture. Click here https://permalink.mercell.com/135814358.aspx
Frist
Fristen for mottak av tilbud var 2020-09-21.
Anskaffelsen ble publisert 2020-08-20.
Kunngjøring av konkurranse (2020-08-20) Gjenstand Anskaffelsens omfang
Tittel: Construction work
Kort beskrivelse:
Norwegian authorities have had clear ambitions connected to carbon capture and storage for a long time. Norcem Brevik and the waste incineration plant at Klemetsrud are to two Norwegian sites that are now being considered for CO2 capture.
The cement industry has large CO2 emissions. Globally it amounts to 5-7 % of the total CO2 emissions (1.9 gigatons CO2 a year). In Norway the share is 2 %. Norcem Brevik emits between 820 000 and 890 000 tonnes CO2 a year.
Norcem, with its owner HeidelbergCement, has a vision of zero emissions of CO2 from concrete products when seen over a life cycle perspective in 2030. In order to achieve this vision, it is necessary to capture CO2 from cement production. If the measure is realised, Norcem Brevik will be the world's first cement factory with full-scale CO2 capture.
Click here https://permalink.mercell.com/135814358.aspx
Norwegian authorities have had clear ambitions connected to carbon capture and storage for a long time. Norcem Brevik and the waste incineration plant at Klemetsrud are to two Norwegian sites that are now being considered for CO2 capture.
The cement industry has large CO2 emissions. Globally it amounts to 5-7 % of the total CO2 emissions (1.9 gigatons CO2 a year). In Norway the share is 2 %. Norcem Brevik emits between 820 000 and 890 000 tonnes CO2 a year.
Norcem, with its owner HeidelbergCement, has a vision of zero emissions of CO2 from concrete products when seen over a life cycle perspective in 2030. In order to achieve this vision, it is necessary to capture CO2 from cement production. If the measure is realised, Norcem Brevik will be the world's first cement factory with full-scale CO2 capture.
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsvirksomhet📦
Tilleggs-CPV: Industrimaskiner📦 Utførelsessted
NUTS-region: Telemark
🏙️
Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
Norwegian authorities have had clear ambitions connected to carbon capture and storage for a long time. Norcem Brevik and the waste incineration plant at Klemetsrud are to two Norwegian sites that are now being considered for CO2 capture.
The cement industry has large CO2 emissions. Globally it amounts to 5-7 % of the total CO2 emissions (1.9 gigatons CO2 a year). In Norway the share is 2 %. Norcem Brevik emits between 820 000 and 890 000 tonnes CO2 a year.
Norcem, with its owner HeidelbergCement, has a vision of zero emissions of CO2 from concrete products when seen over a life cycle perspective in 2030. In order to achieve this vision, it is necessary to capture CO2 from cement production. If the measure is realised, Norcem Brevik will be the world's first cement factory with full-scale CO2 capture.
Norcem, with its owner HeidelbergCement, has a vision of zero emissions of CO2 from concrete products when seen over a life cycle perspective in 2030. In order to achieve this vision, it is necessary to capture CO2 from cement production. If the measure is realised, Norcem Brevik will be the world's first cement factory with full-scale CO2 capture.
The aim of the project is to carry out detailed designing, construction and commissioning of carbon capture and conditioning installations that capture CO2 from flue gas from Norcem's cement production installations in Brevik, Norway and condition it for ship transport and permanent storage under the seabed on the Norwegian continental shelf. The project is part of the Norwegian CCS Demonstration (NCD) Project, where Northern Lights (Equinor, Shell and Total) are responsible for ship transport and permanent storage of CO2. The NCD project and the work that will be carried out under this contract depend on government financing, which is subject to a decision from the Norwegian government by the end of 2020.
The aim of the project is to carry out detailed designing, construction and commissioning of carbon capture and conditioning installations that capture CO2 from flue gas from Norcem's cement production installations in Brevik, Norway and condition it for ship transport and permanent storage under the seabed on the Norwegian continental shelf. The project is part of the Norwegian CCS Demonstration (NCD) Project, where Northern Lights (Equinor, Shell and Total) are responsible for ship transport and permanent storage of CO2. The NCD project and the work that will be carried out under this contract depend on government financing, which is subject to a decision from the Norwegian government by the end of 2020.
The carbon capture and conditioning installations will be installed parallel to the existing flue gas system, with a focus on a secure, simple and regular transition between cement production with and without carbon capture and heat recovery, thereby insuring the integrity of the cement production. In order to integrate the carbon capture and conditioning installations with the existing cement installations, it is necessary to make some modifications to the existing cement installations.
The carbon capture and conditioning installations will be installed parallel to the existing flue gas system, with a focus on a secure, simple and regular transition between cement production with and without carbon capture and heat recovery, thereby insuring the integrity of the cement production. In order to integrate the carbon capture and conditioning installations with the existing cement installations, it is necessary to make some modifications to the existing cement installations.
This contract includes the following deliveries:
(a) changes to the existing flue gas system due to change operational conditions;
(b) new connections, channels, fans, butterfly valve, etc., that are required to connect the waste units and carbon capture plant to the flue gas system.
See the tender documentation and annexes for further information.
Utførelsessted
Hovedsted eller utførelsessted: Brevik.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten:
Requirement
The company must be legally registered.
Documentation requirement:
Norwegian companies: company registration certificate.
Foreign companies: registration certificate in a professional register as determined by legislation in the country where the tenderer is established.
Økonomisk og finansiell stilling:
Requirement
Tenderers must have their affairs in order with respect to the payment of tax, employer contribution and value added tax (VAT).
Documentation requirement:
The tax certificate must not be older than 6 months calculated from the deadline for submitting a request for participation. A tax certificate is defined as:
Norwegian tenderers: A tax and VAT certificate issued by the Tax Collector's Office via Altinn;
Foreign tenderers: foreign tenderers must submit equivalent certificates from their own country, which show that they have their tax and duty payments in order. If the authorities in the relevant country do not issue these certificates, the tenderer should submit a statement which states that all taxes and duties have been paid. The statement shall be approved and signed by the tenderer's Financial director/person responsible for finance.
Foreign tenderers: foreign tenderers must submit equivalent certificates from their own country, which show that they have their tax and duty payments in order. If the authorities in the relevant country do not issue these certificates, the tenderer should submit a statement which states that all taxes and duties have been paid. The statement shall be approved and signed by the tenderer's Financial director/person responsible for finance.
Requirement:
Tenderers must have the financial capacity to comply with the contractual obligations.
The annual accounts including the auditor's statement for the last 3 financial years.
The contracting authority reserves the right to obtain a credit assessment itself.
Teknisk og faglig kapasitet:
Requirement:
Tenderers must have the capacity to fulfil the contract (i.e. sufficient staffing and necessary competence).
Documentation requirement:
Present the tenderer's business idea and core competence related to the scope of the work.
Overview of the tenderer's history, organisation and ownership, as well as the current company, (an organisation chart can be attached).
A description of how the tenderer is organised for the execution of this contract, including the number of permanent employees with relevant qualifications presented in a table.
Maximum 10 pages in total.
Tenderers must have documented experience from deliveries with of similar and relevant complexity.
Tenderers must attach a list of maximum five certificates from contracts with a similar and relevant content and complexity and relevant cement industry experience and process technology competence from the last 10 years.
The certificates should be signed or confirmed in writing by the contracting authority for the different deliveries and as a minimum shall include:
A brief description of the assignment.
The contracting authority
Date of implementation.
Scope of the contract in monetary amount.
Name, telephone number and email address for the reference person at the contracting authority.
If it is not possible to acquire signed or verified attestations, the tenderer shall provide a list of all relevant assignments with descriptions according to the above points.
The contracting authority reserves the right to contact the stated reference persons if needed.
Maximum two pages per reference project.
Tenderers must have and operate a good and efficient quality assurance/management system.
A description of the scope and structure of the tenderer's quality assurance system.
ISO 9001 certificate or equivalent and explain which part of the company and sub-contractors are covered.
Other documentation can be accepted of an equivalent quality assurance system instead of the certificate. The name of the system and a detailed description of the content as well as an explanation on how the system is used in practise is required in such cases. The description must, as a minimum, include:
Other documentation can be accepted of an equivalent quality assurance system instead of the certificate. The name of the system and a detailed description of the content as well as an explanation on how the system is used in practise is required in such cases. The description must, as a minimum, include:
— organisation diagrams,
— competence management,
— supplier management,
— access control,
— internal control systems and procedures,
— change management,
— documentation and traceability,
— quality plan for a similar or comparable project.
Tenderers must have and operate a good and functioning environmental management system that fulfils the requirements in ISO:14001 or equivalent.
A description of the scope and structure of the tenderer's environmental management system.
ISO 14001 certificate or equivalent, as well as a description on the part of the company that is covered.
Other documentation can be accepted of an equivalent environmental management system instead of the certificate. The name of the system and a detailed description of the content as well as an explanation on how the system is used in practise is required in such cases. The description shall, at a minimum include:
Other documentation can be accepted of an equivalent environmental management system instead of the certificate. The name of the system and a detailed description of the content as well as an explanation on how the system is used in practise is required in such cases. The description shall, at a minimum include:
— an overview of the impact the company has on the environment,
— an overview of the company's environmental requirements,
— an overview of the methods for assessing compliance.
Kontraktutførelse
Vilkår for kontraktoppfyllelse: See the attached contract.
Prosedyre
Rettslig grunnlag: 32014L0024
Tidspunkt for mottak av tilbud: 12:00
Dato for utsendelse av invitasjoner: 2020-09-25 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Tilbudets gyldighetsperiode: 4 måneder
Oppdragsgiver Identitet
Nasjonalt registreringsnummer: 934949145
Annen type oppdragsgiver: Private actors with public resources.
Kontakt
Kontaktpunkt: Martin Hagen
Adresse til kjøperprofilen: http://www.norcem.no/🌏
URL for dokumenter: https://permalink.mercell.com/135814358.aspx🌏
Utfyllende informasjon Klageinstans
Navn: Oslo Tingrett
Poststed: Oslo
Land: Norge 🇳🇴 Organ ansvarlig for meklingsprosedyrer
Navn: Kofa
Postadresse: Postboks 511 sentrum
Poststed: Bergen
Postnummer: 5805
Tjeneste hvor informasjon om klageprosedyren kan innhentes
Navn: Norcem AS
Postadresse: Lilleakervn 2A
Postnummer: 0283
E-post: martin.hagen@inventura.no📧
Kilde: OJS 2020/S 164-399558 (2020-08-20)