Procurement — Interaction Contract Kolvikbakken, ÅKE, 2019

Ålesund Kommunale Eiendom KF

Ålesund kommune [Ålesund municipality] hereby invites tenderers to participate in a competition for new construction of Kolvikbakken Lower Secondary School.
Contract form: interaction contract in phase 1 with transition to a turnkey contract in phase 2 (the implementation phase).
The contract includes: the assignment has 2 parts, first the preliminary project for which there will be interaction, then further implementation if the project is within the municipality's functional wants and economic limits.
Phase 1: The draft and preliminary project phase: there is a complete draft project from XPRO AS. In the next phase, the preliminary project is in interaction between the turnkey contractors interaction group and the builder.
Phase 2: The implementation phase: Execution of Kolvikbakken Lower Secondary School, new construction.
The Contracting Authority has chosen an interaction contract for the implementation of the project in Part 1 'the draft and preliminary project phase’, and this means that the character and execution of the project can be changes underway.

Frist

Fristen for mottak av tilbud var 2019-08-30. Anskaffelsen ble publisert 2019-07-02.

Leverandører

Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:

Hvem? Hva? Hvor?
Anskaffelseshistorikk
Dato Dokument
2019-07-02 Kunngjøring av konkurranse
2019-07-09 Tilleggsinformasjon
2019-08-21 Tilleggsinformasjon
2019-11-14 Kunngjøring om tildeling av kontrakt
Kunngjøring av konkurranse (2019-07-02)
Gjenstand
Anskaffelsens omfang
Tittel: Construction work
Referansenummer: 19/4421
Kort beskrivelse:
Ålesund kommune [Ålesund municipality] hereby invites tenderers to participate in a competition for new construction of Kolvikbakken Lower Secondary School. Contract form: interaction contract in phase 1 with transition to a turnkey contract in phase 2 (the implementation phase). The contract includes: the assignment has 2 parts, first the preliminary project for which there will be interaction, then further implementation if the project is within the municipality's functional wants and economic limits. Phase 1: The draft and preliminary project phase: there is a complete draft project from XPRO AS. In the next phase, the preliminary project is in interaction between the turnkey contractors interaction group and the builder. Phase 2: The implementation phase: Execution of Kolvikbakken Lower Secondary School, new construction. The Contracting Authority has chosen an interaction contract for the implementation of the project in Part 1 'the draft and preliminary project phase’, and this means that the character and execution of the project can be changes underway.
Vis mer
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsvirksomhet 📦
Tilleggs-CPV: Forberedende anleggsarbeid 📦
Utførelsessted
NUTS-region: Møre og Romsdal 🏙️

Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet

Oppdragsgiver
Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Regional eller lokal myndighet
Navn på tildelende myndighet: Ålesund kommunale eiendom KF
Postadresse: Rådhuset
Postnummer: 6025
Poststed: Ålesund
Kontakt
Internettadresse: http://www.alesund.kommune.no/aake 🌏
E-post: ann-iren.sperre@alesund.kommune.no 📧
URL for dokumenter: https://tendsign.no/doc.aspx?UniqueId=afrqotpdju&GoTo=Docs 🌏
URL for deltakelse: https://tendsign.no/doc.aspx?UniqueId=afrqotpdju&GoTo=Tender 🌏

Referanse
Datoer
Sendt dato: 2019-07-02 📅
Innleveringsfrist: 2019-08-30 📅
Publiseringsdato: 2019-07-05 📅
Startdato: 2019-09-24 📅
Identifikatorer
Kunngjøringsnummer: 2019/S 128-315051
OJ-S-utgave: 128
Tilleggsinformasjon
The Contracting Authority makes the following reservations: if the cost estimate shows that the costs overall become too large, or if, for example, political decisions are made about stopping the project, the Contracting Authority must terminate the assignment.
Vis mer

Gjenstand
Anskaffelsens omfang
Kort beskrivelse:
Ålesund kommune [Ålesund municipality] hereby invites tenderers to participate in a competition for new construction of Kolvikbakken Lower Secondary School.
Contract form: interaction contract in phase 1 with transition to a turnkey contract in phase 2 (the implementation phase).
The contract includes: the assignment has 2 parts, first the preliminary project for which there will be interaction, then further implementation if the project is within the municipality's functional wants and economic limits.
Phase 1: The draft and preliminary project phase: there is a complete draft project from XPRO AS. In the next phase, the preliminary project is in interaction between the turnkey contractors interaction group and the builder.
Phase 2: The implementation phase: Execution of Kolvikbakken Lower Secondary School, new construction.
The Contracting Authority has chosen an interaction contract for the implementation of the project in Part 1 'the draft and preliminary project phase’, and this means that the character and execution of the project can be changes underway.
Estimert totalverdi: 150 000 000 NOK 💰
Kort beskrivelse:
Phase 2: The implementation phase: execution of Kolvikbakken Lower Secondary School, new construction.
The Contracting Authority has chosen an interaction contract for the implementation of the project in part 1 'the draft and preliminary project phase’, and this means that the character and execution of the project can be changed underway.
Estimert verdi eksklusive mva: 150 000 000 NOK 💰
Beskrivelse av opsjoner:
Refer to ‘Part 2 B1 Remuneration Tender Form’, in the tab 1.04 ‘Options’. Tenderers must state the price consequences for options stated in the price form.
Tilleggsinformasjon:
The Contracting Authority makes the following reservations: if the cost estimate shows that the costs overall become too large, or if, for example, political decisions are made about stopping the project, the Contracting Authority must terminate the assignment.
Vis mer
Utførelsessted
Hovedsted eller utførelsessted: Ålesund kommune [Ålesund municipality].

Juridisk, økonomisk, finansiell og teknisk informasjon
Vilkår for deltakelse
Økonomisk og finansiell stilling:
Tax and VAT certificate: documentation requirements:
For Norwegian tenderers: a tax and VAT certificate. The tax certificate(s) shall not be older than 6 months, from the tender deadline. Any arrears or other irregularities must be justified (tenderers can obtain the electronic tax and VAT certificate themselves and immediately receive it by email).
Vis mer
Foreign tenderers: tenderers who are not established in Norway must present equivalent documentation issued by the authorities in the country where the tenderer is established. The certificate shall preferably be translated into Norwegian, but it will also be accepted in Swedish, Danish and English.
Vis mer
Credit rating: documentation requirement: the Contracting Authority will implement an assessment of the tenderer's finances through the company and accounting information system Bisnode AS (www.soliditet.no/creditcontrol) with the service CreditPro.
The Contracting Authority will not accept credit ratings from business and account information systems other than Bisnode AS with the service CreditPro in order to ensure an equal assessment of all tenderers.
Tenderers can enclose other necessary information in the tender offer if the tenderer believes that Bisnode/CreditPro does not provide a correct picture of the economic situation.
Newly established companies: newly established companies who have not worked up a basis for a credit assessment must enclose a declaration from a bank or similar financial institution on the company's financial and economic standing. This also applies to foreign tenderers.
Vis mer
Minste nivå(er) av standarder:
Tax and VAT certificate: requirement: the tenderer must have settled conditions in relation to payment of tax, payroll tax and VAT, in accordance with the legislation.
Credit rating: requirement: the financial capacity to implement the contract is required. A minimum requirement is that the tenderer is credit-worthy, score A in accordance with Bisnode AS using the service CreditPro, or that the tenderer has the financial capacity to implement the contract, based on the Contracting Authority’s assessment given in the submitted documentation from the tenderer. Newly established companies must have the economic capacity to implement the contract.
Vis mer
Teknisk og faglig kapasitet:
— liability insurance policy: documentation requirement: a copy of the liability insurance policy must be enclosed as documentation,
— confirmation from a bank/guarantee institution: documentation requirement: unreserved confirmation from a bank/finance institution that the guarantee will be provided if the tenderer is awarded the assignment.
Quality management system: documentation requirement: a brief description must be enclosed of the general quality management system the tenderer will use as a basis for the implementation of the contract (max. one A4 page, table of contents will not accepted) or a copy of a system certificate issued by an accredited certification body.
Vis mer
Competence: documentation requirement: description of 2 turnkey contract projects the tenderer has implemented in public construction during the last 5 years, each of a minimum 3 000 m
Minste nivå(er) av standarder:
— liability insurance policy: requirement: the tenderer's liability insurance policy must as a minimum have coverage in accordance with NS8407:201, point 8.2,
— confirmation from a bank/guarantee institution: requirement: the tender must contain confirmation from a bank/guarantee institution that a guarantee of 10 % of the total contract amount excluding VAT, that can be used as security for fulfilment of the contract.
Vis mer
Quality management system: requirement: a good and well-functioning quality management system is required for the services that will be delivered. The quality system must satisfy relevant requirements in NS-EN ISO 9001 'Quality systems’ — Quality assurance model during development, construction, manufacture, installation and inspections’. In addition, the system must safeguard and satisfy the quality assurance requirements in the planning and building act, internal control regulation, the builder regulation and other imposed requirements.
Vis mer
Competence: requirement: the tenderer must have sufficient professional and technical expertise to implement the contract deliveries, within the applicable requirements.

Prosedyre
Rettslig grunnlag: 32014L0024
Tidspunkt for mottak av tilbud: 12:00
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Tilbudets gyldighetsperiode: 2019-11-30 📅
Dato for åpning av tilbud: 2019-08-30 📅
Tidspunkt for åpning av tilbud: 13:00

Oppdragsgiver
Identitet
Nasjonalt registreringsnummer: 986 074 988
Kontakt
Kontaktpunkt: Ann-Iren Sperre
URL for dokumenter: https://tendsign.no/doc.aspx?UniqueId=afrqotpdju&GoTo=Docs 🌏

Referanse
Tilleggsinformasjon
Visma notice: https://opic.com/id/afrqotpdju

Utfyllende informasjon
Klageinstans
Navn: Kofa
Poststed: Bergen
Land: Norge 🇳🇴
Kilde: OJS 2019/S 128-315051 (2019-07-02)
Tilleggsinformasjon (2019-07-09)
Gjenstand
Anskaffelsens omfang
Kort beskrivelse:
Ålesund kommune [Ålesund municipality] hereby invites tenderers to participate in a competition for new construction of Kolvikbakken Lower Secondary School. Contract form: interaction contract in phase 1 with transition to a turnkey contract in phase 2 (the implementation phase). The contract includes: the assignment has 2 parts, first the preliminary project for which there will be interaction, then further implementation if the project is within the municipality's functional wants and economic limits. Phase 1: the draft and preliminary project phase: there is a complete draft project from XPRO AS. In the next phase, the preliminary project is in interaction between the turnkey contractors interaction group and the builder. Phase 2: the implementation phase: execution of Kolvikbakken Lower Secondary School, new construction. The Contracting Authority has chosen an interaction contract for the implementation of the project in part 1 'the draft and preliminary project phase’, and this means that the character and execution of the project can be changed underway.
Vis mer
Metadata for kunngjøring
Dokumenttype: Tilleggsinformasjon
Felles innkjøpsordliste (CPV)
Kode: Byggearbeid 📦

Referanse
Datoer
Sendt dato: 2019-07-09 📅
Innleveringsfrist: 2019-09-13 📅
Publiseringsdato: 2019-07-12 📅
Identifikatorer
Kunngjøringsnummer: 2019/S 133-328436
Refererer til kunngjøring: 2019/S 128-315051
OJ-S-utgave: 133
Tilleggsinformasjon
Visma notice: https://opic.com/id/afhgpjajih

Gjenstand
Anskaffelsens omfang
Kort beskrivelse:
Phase 1: the draft and preliminary project phase: there is a complete draft project from XPRO AS. In the next phase, the preliminary project is in interaction between the turnkey contractors interaction group and the builder.
Phase 2: the implementation phase: execution of Kolvikbakken Lower Secondary School, new construction.
Kilde: OJS 2019/S 133-328436 (2019-07-09)
Tilleggsinformasjon (2019-08-21)
Gjenstand
Anskaffelsens omfang
Kort beskrivelse:
Ålesund kommune [Ålesund municipality] hereby invites tenderers to participate in a competition for new construction of Kolvikbakken Lower Secondary School. Contract form: interaction contract in phase 1 with transition to a turnkey contract in phase 2 (the implementation phase). The contract includes: The assignment has two parts, first the preliminary project for which there will be interaction, then further implementation if the project is within the municipality's functional wants and economic limits. Phase 1: the draft and preliminary project phase: There is a complete draft project from XPRO AS. In the next phase, the preliminary project is in interaction between the turnkey contractors interaction group and the builder. Phase 2: the implementation phase: Execution of Kolvikbakken Lower Secondary School, new construction. The contracting authority has chosen an interaction contract for the implementation of the project in part 1 'the draft and preliminary project phase’, and this means that the character and execution of the project can be changed underway.
Vis mer

Referanse
Datoer
Sendt dato: 2019-08-21 📅
Innleveringsfrist: 2019-09-23 📅
Publiseringsdato: 2019-08-23 📅
Identifikatorer
Kunngjøringsnummer: 2019/S 162-399635
OJ-S-utgave: 162
Tilleggsinformasjon
Visma notice: https://opic.com/id/afkjmzezny

Gjenstand
Anskaffelsens omfang
Kort beskrivelse:
The contract includes: The assignment has two parts, first the preliminary project for which there will be interaction, then further implementation if the project is within the municipality's functional wants and economic limits.
Phase 1: the draft and preliminary project phase: There is a complete draft project from XPRO AS. In the next phase, the preliminary project is in interaction between the turnkey contractors interaction group and the builder.
Phase 2: the implementation phase: Execution of Kolvikbakken Lower Secondary School, new construction.
The contracting authority has chosen an interaction contract for the implementation of the project in part 1 'the draft and preliminary project phase’, and this means that the character and execution of the project can be changed underway.
Kilde: OJS 2019/S 162-399635 (2019-08-21)
Kunngjøring om tildeling av kontrakt (2019-11-14)
Gjenstand
Anskaffelsens omfang
Kort beskrivelse:
Ålesund Kommune [Ålesund Municipality] hereby invites tenderers to participate in a competition for new construction of Kolvikbakken Lower Secondary School. Contract form: interaction contract in Phase 1 with transition to a turnkey contract in Phase 2 (the implementation phase). The contract includes: the assignment has 2 parts, first the preliminary project for which there will be interaction, then further implementation if the project is within the municipality's functional wants and economic limits. Phase 1: the draft and preliminary project phase: there is a complete draft project from XPRO AS. In the next phase, the preliminary project is in interaction between the turnkey contractors interaction group and the builder. Phase 2: the implementation phase: execution of Kolvikbakken Lower Secondary School, new construction. The contracting authority has chosen an interaction contract for the implementation of the project in Part 1 ‘the draft and preliminary project phase’ and this means that the character and execution of the project can be changed underway.
Vis mer
Totalverdi for anskaffelsen: 186 869 451 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt

Prosedyre
Tilbudstype: Ikke aktuelt

Referanse
Datoer
Sendt dato: 2019-11-14 📅
Publiseringsdato: 2019-11-18 📅
Identifikatorer
Kunngjøringsnummer: 2019/S 222-545832
OJ-S-utgave: 222
Tilleggsinformasjon
The contracting authority makes the following reservations: if the cost estimate shows that the costs overall become too large, or if, for example, political decisions are made about stopping the project, the contracting authority must terminate the assignment.
Vis mer

Gjenstand
Anskaffelsens omfang
Kort beskrivelse:
Ålesund Kommune [Ålesund Municipality] hereby invites tenderers to participate in a competition for new construction of Kolvikbakken Lower Secondary School.
Contract form: interaction contract in Phase 1 with transition to a turnkey contract in Phase 2 (the implementation phase).
The contracting authority has chosen an interaction contract for the implementation of the project in Part 1 ‘the draft and preliminary project phase’ and this means that the character and execution of the project can be changed underway.
Beskrivelse av opsjoner:
Refer to ‘Part 2 B1 Remuneration Tender Form’, in the Tab 1.04 ‘Options’. Tenderers must state the price consequences for options stated in the price form.
Tilleggsinformasjon:
The contracting authority makes the following reservations: if the cost estimate shows that the costs overall become too large, or if, for example, political decisions are made about stopping the project, the contracting authority must terminate the assignment.
Vis mer
Utførelsessted
Hovedsted eller utførelsessted: Ålesund Kommune [Ålesund Municipality].

Prosedyre
Tildelingskriterier
Kvalitetskriterium (navn): Personnel
Kvalitetskriterium (vekting): 25 %
Kvalitetskriterium (navn): Implementation schedule
Pris (vekting): 50 %

Tildeling av kontrakt
Dato for kontraktinngåelse: 2019-10-04 📅
Navn: Åsen & Øvrelid AS
Nasjonalt registreringsnummer: 976 742 117
Postadresse: Fjæreveien9
Poststed: Førde
Postnummer: 6800
Land: Norge 🇳🇴
E-post: finn.ove@aasen-ovrelid.no 📧
Land: Sogn og Fjordane 🏙️
Totalverdi for anskaffelsen: 186 869 451 NOK 💰
Informasjon om tilbud
Antall mottatte tilbud: 4

Referanse
Tilleggsinformasjon
Visma notice: https://opic.com/id/afdwjhslsq

Utfyllende informasjon
Klageinstans
Navn: Kofa
Kilde: OJS 2019/S 222-545832 (2019-11-14)