Gardermoen wastewater treatment plant is a mechanical, chemical and biological treatment plant with a connection close to 85 000 pe, measured as BOD5. The plant was commissioned in 1998, and has, amongst other things, nitrogen removal requirements.
The existing Gardermoen wastewater treatment plant must be expanded. The expansion is a result of a large growth in the population in the wastewater treatment plant's catchment area, i.e., large parts of Ullensaker and Nannestad Municipalities, as well as a large growth in the number of passengers at Oslo Airport. In addition a decision has been made to close Kløfta treatment plant, so all sewage water from Kløfta will be transferred to the new Gardermoen wastewater treatment plant. The new Gardermoen wastewater treatment plant is to be dimensioned for a future connection in the year 2050. This means more than double the current capacity.
Frist
Fristen for mottak av tilbud var 2019-05-07.
Anskaffelsen ble publisert 2019-03-28.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2019-03-28) Gjenstand Anskaffelsens omfang
Tittel: Construction works for sewage treatment plants, purification plants and refuse incineration plants
Referansenummer: 31332\10210138
Kort beskrivelse:
“Gardermoen wastewater treatment plant is a mechanical, chemical and biological treatment plant with a connection close to 85 000 pe, measured as BOD5. The...”
Kort beskrivelse
Gardermoen wastewater treatment plant is a mechanical, chemical and biological treatment plant with a connection close to 85 000 pe, measured as BOD5. The plant was commissioned in 1998, and has, amongst other things, nitrogen removal requirements.
Prosedyre
Prosedyretype: Konkurransepreget dialog
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
“This enquiry for a prequalification consists of 3 main documents in addition to this notice. These are:”
Kilde: OJS 2019/S 063-148154 (2019-03-28)
Kunngjøring om tildeling av kontrakt (2020-07-02) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
“Gardermoen wastewater treatment plant is a mechanical, chemical and biological treatment plant with a connection close to 85 000 pe, measured as BOD5. The...”
Kort beskrivelse
Gardermoen wastewater treatment plant is a mechanical, chemical and biological treatment plant with a connection close to 85 000 pe, measured as BOD5. The plant was commissioned in 1998 and has, amongst other things, nitrogen removal requirements.
Vis mer
Totalverdi for anskaffelsen: 210 809 148 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt