Antall eller omfang
The framework agreement period will be 5 years, with an option for an extension for 1 year at a time, up to two times (5+1+1).The call-offs on the contracts are difficult to estimate, as the need can vary a lot from year to year. The total estimated scope in the contract period will be between 5 - 15 million NOK excluding VAT. The estimate is based on consumption in ongoing and future projects, and consumption in previous contracts, and is, thus, not binding for the contracting authority. The call-offs on the framework agreement can be both for more or less than the estimate due this uncertainty.5 000 00015 000 000