Orkdal Municipality shall establish a new water supply from Steinshaugen. 3 ground water wells have been established and shall be expanded. The following shall be constructed: a new water treatment plant, a local waste water plant, transfer system for drinking water to the new elevated basin at Digerås before connecting to the existing water supply system at Fannrem. This contract — E08 — concerns the third part of the transfer system, from the future elevated basin at Digerås to Brekka. The entire project will be carried out as joint projects with start up at different dates throughout the construction period of approx. 2 and a half years. The remaining contracts will be announced consecutively. E08 comprises excavation work for and delivery/assembly of material for approx.: — approx. 900 m Ø400 mm water pipeline, with the accompanying manholes and other installations, — approx. 500 m drainage and surface water pipeline in dimensions Ø200-315 mm, with the accompanying manholes and other installations, — approx. 900 m conduits for fibre, — crossing roads and streams.
Frist
Fristen for mottak av tilbud var 2019-04-24.
Anskaffelsen ble publisert 2019-03-21.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2019-03-21) Gjenstand Anskaffelsens omfang
Tittel: Ancillary works for pipelines and cables
Referansenummer: 536689-08
Kort beskrivelse:
Orkdal Municipality shall establish a new water supply from Steinshaugen. 3 ground water wells have been established and shall be expanded. The following shall be constructed: a new water treatment plant, a local waste water plant, transfer system for drinking water to the new elevated basin at Digerås before connecting to the existing water supply system at Fannrem. This contract — E08 — concerns the third part of the transfer system, from the future elevated basin at Digerås to Brekka. The entire project will be carried out as joint projects with start up at different dates throughout the construction period of approx. 2 and a half years. The remaining contracts will be announced consecutively. E08 comprises excavation work for and delivery/assembly of material for approx.:
— approx. 900 m Ø400 mm water pipeline, with the accompanying manholes and other installations,
— approx. 500 m drainage and surface water pipeline in dimensions Ø200-315 mm, with the accompanying manholes and other installations,
— approx. 900 m conduits for fibre,
— crossing roads and streams.
Orkdal Municipality shall establish a new water supply from Steinshaugen. 3 ground water wells have been established and shall be expanded. The following shall be constructed: a new water treatment plant, a local waste water plant, transfer system for drinking water to the new elevated basin at Digerås before connecting to the existing water supply system at Fannrem. This contract — E08 — concerns the third part of the transfer system, from the future elevated basin at Digerås to Brekka. The entire project will be carried out as joint projects with start up at different dates throughout the construction period of approx. 2 and a half years. The remaining contracts will be announced consecutively. E08 comprises excavation work for and delivery/assembly of material for approx.:
— approx. 900 m Ø400 mm water pipeline, with the accompanying manholes and other installations,
— approx. 500 m drainage and surface water pipeline in dimensions Ø200-315 mm, with the accompanying manholes and other installations,
Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
Orkdal Municipality shall establish a new water supply from Steinshaugen. 3 ground water wells have been established and shall be expanded. The following shall be constructed: a new water treatment plant, a local waste water plant, transfer system for drinking water to the new elevated basin at Digerås before connecting to the existing water supply system at Fannrem. This contract — E08 — concerns the third part of the transfer system, from the future elevated basin at Digerås to Brekka. The entire project will be carried out as joint projects with start up at different dates throughout the construction period of approx. 2 and a half years. The remaining contracts will be announced consecutively. E08 comprises excavation work for and delivery/assembly of material for approx.:
Orkdal Municipality shall establish a new water supply from Steinshaugen. 3 ground water wells have been established and shall be expanded. The following shall be constructed: a new water treatment plant, a local waste water plant, transfer system for drinking water to the new elevated basin at Digerås before connecting to the existing water supply system at Fannrem. This contract — E08 — concerns the third part of the transfer system, from the future elevated basin at Digerås to Brekka. The entire project will be carried out as joint projects with start up at different dates throughout the construction period of approx. 2 and a half years. The remaining contracts will be announced consecutively. E08 comprises excavation work for and delivery/assembly of material for approx.:
— approx. 900 m Ø400 mm water pipeline, with the accompanying manholes and other installations,
— approx. 500 m drainage and surface water pipeline in dimensions Ø200-315 mm, with the accompanying manholes and other installations,
— approx. 900 m conduits for fibre,
— crossing roads and streams.
Utførelsessted
Hovedsted eller utførelsessted: Digerås — Brekka.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten: See the tender documentation.
Økonomisk og finansiell stilling: See the tender documentation.
Teknisk og faglig kapasitet: See the tender documentation.
Kontraktutførelse
Vilkår for kontraktoppfyllelse: See the tender documentation.
Prosedyre
Rettslig grunnlag: 32014L0024
Minste antall kandidater: 2
Tidspunkt for mottak av tilbud: 12:00
Dato for utsendelse av invitasjoner: 2019-04-29 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Tilbudets gyldighetsperiode: 2019-08-18 📅
Kunngjøring om tildeling av kontrakt (2019-08-21) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
Orkdal Municipality shall establish a new water supply from Steinshaugen. 3 ground water wells have been established and shall be expanded. The following shall be constructed: a new water treatment plant, a local waste water plant, transfer system for drinking water to the new elevated basin at Digerås before connecting to the existing water supply system at Fannrem. This contract -E08 — concerns the third part of the transfer system, from the future elevated basin at Digerås to Brekka. The entire project will be carried out as joint projects with start up at different dates throughout the construction period of approx. 2 and a half years. The remaining contracts will be announced consecutively. E08 comprises excavation work for and delivery/assembly of material for approx.
— approx. 900 m Ø400 mm water pipeline, with the accompanying manholes and other installations,
— approx. 500 m drainage and surface water pipeline in dimensions Ø200-315 mm, with the accompanying manholes and other installations,
— approx. 900 m conduits for fibre,
— crossing roads and streams.
Orkdal Municipality shall establish a new water supply from Steinshaugen. 3 ground water wells have been established and shall be expanded. The following shall be constructed: a new water treatment plant, a local waste water plant, transfer system for drinking water to the new elevated basin at Digerås before connecting to the existing water supply system at Fannrem. This contract -E08 — concerns the third part of the transfer system, from the future elevated basin at Digerås to Brekka. The entire project will be carried out as joint projects with start up at different dates throughout the construction period of approx. 2 and a half years. The remaining contracts will be announced consecutively. E08 comprises excavation work for and delivery/assembly of material for approx.
— approx. 900 m Ø400 mm water pipeline, with the accompanying manholes and other installations,
— approx. 500 m drainage and surface water pipeline in dimensions Ø200-315 mm, with the accompanying manholes and other installations,
— approx. 900 m conduits for fibre,
— crossing roads and streams.
Totalverdi for anskaffelsen: 8 382 116 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Prosedyre
Tilbudstype: Ikke aktuelt
Referanse Datoer
Sendt dato: 2019-08-21 📅
Publiseringsdato: 2019-08-22 📅
Identifikatorer
Kunngjøringsnummer: 2019/S 161-397429
Refererer til kunngjøring: 2019/S 060-140488
OJ-S-utgave: 161
Gjenstand Anskaffelsens omfang
Kort beskrivelse:
Orkdal Municipality shall establish a new water supply from Steinshaugen. 3 ground water wells have been established and shall be expanded. The following shall be constructed: a new water treatment plant, a local waste water plant, transfer system for drinking water to the new elevated basin at Digerås before connecting to the existing water supply system at Fannrem. This contract -E08…
… — concerns the third part of the transfer system, from the future elevated basin at Digerås to Brekka. The entire project will be carried out as joint projects with start up at different dates throughout the construction period of approx. 2 and a half years. The remaining contracts will be announced consecutively. E08 comprises excavation work for and delivery/assembly of material for approx.
… - concerns the third part of the transfer system, from the future elevated basin at Digerås to Brekka. The entire project will be carried out as joint projects with start up at different dates throughout the construction period of approx. 2 and a half years. The remaining contracts will be announced consecutively. E08 comprises excavation work for and delivery/assembly of material for approx.
— Approx. 900 m Ø400 mm water pipeline, with the accompanying manholes and other installations
— Approx. 500 m drainage and surface water pipeline in dimensions Ø200-315 mm, with the accompanying manholes and other installations
Tildeling av kontrakt
Dato for kontraktinngåelse: 2019-06-17 📅
Navn: SG Entreprenør AS
Nasjonalt registreringsnummer: NO997395735MVA
Postadresse: PB53
Poststed: Melhus
Postnummer: 7221
Land: Norge 🇳🇴
E-post: kjersti.gladso@sge.no📧
Land: Sør-Trøndelag
🏙️
Totalverdi for anskaffelsen: 8 382 116 NOK 💰
Informasjon om tilbud
Antall mottatte tilbud: 2