The New Tøyenbadet is planned to replace the current Tøyenbadet. The existing pool will be demolished and a new modern swimming pool will be established on the same site. This call for tenders is for the demolition work. The demolition contract includes the removal of the current buildings, outdoor facilities and all technical installations. The contract concerns all buldings including foundations and developed areas. The building materials must be separated in relevant waste fractions and transported to an approved reception/disposal site. The highest possible degree of waste separation must be sought. KID has a high focus on recycling and material recovery. The progress of the project is based on the demolition works being executed within a 4 month period. However, the demolition contractor will be given a 6 month period for concluding the work. The 2 last months the demolition contractor must be prepared to share the construction site with the foundation contractor. The project is subject to an approval for establishing a New Tøyenbad as well as budgetary coverage.
Frist
Fristen for mottak av tilbud var 2019-08-26.
Anskaffelsen ble publisert 2019-06-11.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2019-06-11) Gjenstand Anskaffelsens omfang
Tittel: Building demolition and wrecking work and earthmoving work
Referansenummer: websak 19/169
Kort beskrivelse:
The New Tøyenbadet is planned to replace the current Tøyenbadet. The existing pool will be demolished and a new modern swimming pool will be established on the same site.
This call for tenders is for the demolition work. The demolition contract includes the removal of the current buildings, outdoor facilities and all technical installations. The contract concerns all buldings including foundations and developed areas. The building materials must be separated in relevant waste fractions and transported to an approved reception/disposal site. The highest possible degree of waste separation must be sought. KID has a high focus on recycling and material recovery.
The progress of the project is based on the demolition works being executed within a 4 month period. However, the demolition contractor will be given a 6 month period for concluding the work. The 2 last months the demolition contractor must be prepared to share the construction site with the foundation contractor.
The project is subject to an approval for establishing a New Tøyenbad as well as budgetary coverage.
The New Tøyenbadet is planned to replace the current Tøyenbadet. The existing pool will be demolished and a new modern swimming pool will be established on the same site.
This call for tenders is for the demolition work. The demolition contract includes the removal of the current buildings, outdoor facilities and all technical installations. The contract concerns all buldings including foundations and developed areas. The building materials must be separated in relevant waste fractions and transported to an approved reception/disposal site. The highest possible degree of waste separation must be sought. KID has a high focus on recycling and material recovery.
The progress of the project is based on the demolition works being executed within a 4 month period. However, the demolition contractor will be given a 6 month period for concluding the work. The 2 last months the demolition contractor must be prepared to share the construction site with the foundation contractor.
The project is subject to an approval for establishing a New Tøyenbad as well as budgetary coverage.
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Nedrivning av bygninger og jordarbeid📦
Tilleggs-CPV: Bygge- og anleggsvirksomhet📦 Utførelsessted
NUTS-region: Oslo
🏙️
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
Referanse Datoer
Sendt dato: 2019-06-11 📅
Innleveringsfrist: 2019-08-26 📅
Publiseringsdato: 2019-06-13 📅
Identifikatorer
Kunngjøringsnummer: 2019/S 112-276113
OJ-S-utgave: 112
Tilleggsinformasjon
See the tender documentation and annexes.
Gjenstand Anskaffelsens omfang
Kort beskrivelse:
The New Tøyenbadet is planned to replace the current Tøyenbadet. The existing pool will be demolished and a new modern swimming pool will be established on the same site.
This call for tenders is for the demolition work. The demolition contract includes the removal of the current buildings, outdoor facilities and all technical installations. The contract concerns all buldings including foundations and developed areas. The building materials must be separated in relevant waste fractions and transported to an approved reception/disposal site. The highest possible degree of waste separation must be sought. KID has a high focus on recycling and material recovery.
This call for tenders is for the demolition work. The demolition contract includes the removal of the current buildings, outdoor facilities and all technical installations. The contract concerns all buldings including foundations and developed areas. The building materials must be separated in relevant waste fractions and transported to an approved reception/disposal site. The highest possible degree of waste separation must be sought. KID has a high focus on recycling and material recovery.
The progress of the project is based on the demolition works being executed within a 4 month period. However, the demolition contractor will be given a 6 month period for concluding the work. The 2 last months the demolition contractor must be prepared to share the construction site with the foundation contractor.
The progress of the project is based on the demolition works being executed within a 4 month period. However, the demolition contractor will be given a 6 month period for concluding the work. The 2 last months the demolition contractor must be prepared to share the construction site with the foundation contractor.
The project is subject to an approval for establishing a New Tøyenbad as well as budgetary coverage.
Varighet: 6 måneder
Beskrivelse av opsjoner:
The tender must include a price for an option regarding a reduced scope of the demolition work; keeping parts of the floor in the current basement.
Tilleggsinformasjon: See the tender documentation and annexes.
Utførelsessted
Hovedsted eller utførelsessted: Tøyen in Oslo.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten:
Tax certificate:
The selected tenderer will be required to present a tax certificate and a VAT certificate. The tax certificate must not be older than 6 months old at the deadline for submitting a request for participation in the competition or tender. For building and construction contracts, the tenderer shall require an equivalent tax certificate from all sub-suppliers when contracts are signed for the assignment with a value exceeding 500 000 NOK excluding VAT.
The selected tenderer will be required to present a tax certificate and a VAT certificate. The tax certificate must not be older than 6 months old at the deadline for submitting a request for participation in the competition or tender. For building and construction contracts, the tenderer shall require an equivalent tax certificate from all sub-suppliers when contracts are signed for the assignment with a value exceeding 500 000 NOK excluding VAT.
Company registration certificate:
Requirement:
— the service provider must be a legally established company.
Documentation requirement:
— Norwegian companies: company registration certificate,
— foreign companies: a verification showing that the company is registered in a trade index or business register as prescribed by the law of the country where the tenderer is established.
Økonomisk og finansiell stilling:
Requirement:
Tenderers must have sufficient financial capacity to carry out the assignment.
Documentation requirement:
— the tenderer's latest annual financial statements or extracts thereof if the publication of the annual financial statements is required in the state where the tenderer is established, and
— credit ratings no older than 6 months (the contracting Authority reserves the right to obtain separate credit ratings),
— this bullet point will be subject to assessment of the turnover, annual results, as well as key figures in the balance sheet.
Minste nivå(er) av standarder: See the tender documentation and annexes.
Teknisk og faglig kapasitet:
Requirement:
The tenderer is required to have experience with the execution of demolition works of comparable scope and complexity.
Documentation requirement:
The tenderer is required to have experience with the execution of demolition works of comparable scope and complexity. A description shall be given of 3 reference projects with a transferable value from the last 5 years, with information on, amongst other things:
The tenderer is required to have experience with the execution of demolition works of comparable scope and complexity. A description shall be given of 3 reference projects with a transferable value from the last 5 years, with information on, amongst other things:
— the name of the project,
— the Contracting Authority and a reference person,
— the project's size in m
— type of contract (e.g. turnkey contract) and the company's assignments/role in the project.
All of the above points are to be responded to per project. The description of each project must not be more than approx. one A4 page,
— in order to ensure sufficient competition, documentation of demolition assignments carried out more than 5 years ago will also be taken into consideration.
Kontraktutførelse
Vilkår for kontraktoppfyllelse: See the tender documentation and annexes.
Prosedyre
Rettslig grunnlag: 32014L0024
Tidspunkt for mottak av tilbud: 12:00
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Tilbudets gyldighetsperiode: 2019-11-26 📅
Dato for åpning av tilbud: 2019-08-26 📅
Tidspunkt for åpning av tilbud: 12:00
Tilleggsinformasjon (2019-07-03) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
The New Tøyenbadet is planned to replace the current Tøyenbadet. The existing pool will be demolished and a new modern swimming pool will be established on the same site.
This call for tenders is for the demolition work. The demolition contract includes the removal of the current buildings, outdoor facilities and all technical installations. The contract concerns all buldings including foundations and developed areas. The building materials must be separated in relevant waste fractions and transported to an approved reception/disposal site. The highest possible degree of waste separation must be sought. KID has a high focus on recycling and material recovery.
The progress of the project is based on the demolition works being executed within a 4 month period. However, the demolition contractor will be given a 6 month period for concluding the work. The 2 last months the demolition contractor must be prepared to share the construction site with the foundation contractor.
After the notice was published the City Council has decided to construct the new Tøyenbadet.
The New Tøyenbadet is planned to replace the current Tøyenbadet. The existing pool will be demolished and a new modern swimming pool will be established on the same site.
This call for tenders is for the demolition work. The demolition contract includes the removal of the current buildings, outdoor facilities and all technical installations. The contract concerns all buldings including foundations and developed areas. The building materials must be separated in relevant waste fractions and transported to an approved reception/disposal site. The highest possible degree of waste separation must be sought. KID has a high focus on recycling and material recovery.
The progress of the project is based on the demolition works being executed within a 4 month period. However, the demolition contractor will be given a 6 month period for concluding the work. The 2 last months the demolition contractor must be prepared to share the construction site with the foundation contractor.
After the notice was published the City Council has decided to construct the new Tøyenbadet.
Metadata for kunngjøring
Dokumenttype: Tilleggsinformasjon
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsvirksomhet📦
After the notice was published the City Council has decided to construct the new Tøyenbadet. It was in the original announcement text that a reservation was made that such a decision was made. This reservation is now annulled.
Gjenstand Anskaffelsens omfang
Kort beskrivelse:
After the notice was published the City Council has decided to construct the new Tøyenbadet.
Kilde: OJS 2019/S 129-317767 (2019-07-03)
Kunngjøring om tildeling av kontrakt (2019-11-27) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
The New Tøyenbadet is planned to replace the current Tøyenbadet. The existing pool will be demolished and a new modern swimming pool will be established on the same site.
This call for tenders is for the demolition work. The demolition contract includes the removal of the current buildings, outdoor facilities and all technical installations. The contract concerns all buildings including foundations and developed areas. The building materials must be separated in relevant waste fractions and transported to an approved reception/disposal site. The highest possible degree of waste separation must be sought. KID has a high focus on recycling and material recovery.
The progress of the project is based on the demolition works being executed within a 4 month period. However, the demolition contractor will be given a 6 month period for concluding the work. The 2 last months the demolition contractor must be prepared to share the construction site with the foundation contractor.
The project is subject to an approval for establishing a New Tøyenbad as well as budgetary coverage.
The New Tøyenbadet is planned to replace the current Tøyenbadet. The existing pool will be demolished and a new modern swimming pool will be established on the same site.
This call for tenders is for the demolition work. The demolition contract includes the removal of the current buildings, outdoor facilities and all technical installations. The contract concerns all buildings including foundations and developed areas. The building materials must be separated in relevant waste fractions and transported to an approved reception/disposal site. The highest possible degree of waste separation must be sought. KID has a high focus on recycling and material recovery.
The progress of the project is based on the demolition works being executed within a 4 month period. However, the demolition contractor will be given a 6 month period for concluding the work. The 2 last months the demolition contractor must be prepared to share the construction site with the foundation contractor.
The project is subject to an approval for establishing a New Tøyenbad as well as budgetary coverage.
Totalverdi for anskaffelsen: 7 919 427 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
This call for tenders is for the demolition work. The demolition contract includes the removal of the current buildings, outdoor facilities and all technical installations. The contract concerns all buildings including foundations and developed areas. The building materials must be separated in relevant waste fractions and transported to an approved reception/disposal site. The highest possible degree of waste separation must be sought. KID has a high focus on recycling and material recovery.
This call for tenders is for the demolition work. The demolition contract includes the removal of the current buildings, outdoor facilities and all technical installations. The contract concerns all buildings including foundations and developed areas. The building materials must be separated in relevant waste fractions and transported to an approved reception/disposal site. The highest possible degree of waste separation must be sought. KID has a high focus on recycling and material recovery.
The progress of the project is based on the demolition works being executed within a 4-month period. However, the demolition contractor will be given a 6-month period for concluding the work. The 2 last months the demolition contractor must be prepared to share the construction site with the foundation contractor.
The progress of the project is based on the demolition works being executed within a 4-month period. However, the demolition contractor will be given a 6-month period for concluding the work. The 2 last months the demolition contractor must be prepared to share the construction site with the foundation contractor.
Tildeling av kontrakt
Dato for kontraktinngåelse: 2019-09-24 📅
Navn: AF Decom AS
Nasjonalt registreringsnummer: 992097442
Poststed: Oslo
Postnummer: 0603
Land: Norge 🇳🇴 Oslo
🏙️
Totalverdi for anskaffelsen: 7 919 427 NOK 💰
Informasjon om tilbud
Antall mottatte tilbud: 4
Kilde: OJS 2019/S 230-565264 (2019-11-27)