Sandefjord Airport AS (SLH) shall replace and renovate the ventilation plants in the southern part of the terminal at Torp Sandefjord Airport. A ventilation plant shall be replaced due to the generator's poor condition. A channel system shall be reconstructed for adaptation to the current design and requirement.
Frist
Fristen for mottak av tilbud var 2018-04-20.
Anskaffelsen ble publisert 2018-03-19.
Kunngjøring av konkurranse (2018-03-19) Gjenstand Anskaffelsens omfang
Tittel: Construction work
Referansenummer: 20180316
Kort beskrivelse:
“Sandefjord Airport AS (SLH) shall replace and renovate the ventilation plants in the southern part of the terminal at Torp Sandefjord Airport. A ventilation...”
Kort beskrivelse
Sandefjord Airport AS (SLH) shall replace and renovate the ventilation plants in the southern part of the terminal at Torp Sandefjord Airport. A ventilation plant shall be replaced due to the generator's poor condition. A channel system shall be reconstructed for adaptation to the current design and requirement.
Vis mer Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS)
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsvirksomhet📦 Utførelsessted
NUTS-region: no033 🏙️
Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet