Ringsaker municipality shall construct a new waterworks at Moelv. The chosen treatment process is based on the raw water quality and the need for treatment in order to fulfil the Drinking Water Regulations requirements. The new Moelv Waterworks consists of several contracts. New water treatment facility (VBA) B1, this contract. The contracts electro E1, HVAC and sanitation V1, ventilation and plumbing R1. These will be transported to B1, which will be responsible for coordinating the contracts and progress.. The E1, R1 and V1 contracts are for deliveries for the building belonging to the raw water pump station included in contract B2.
Frist
Fristen for mottak av tilbud var 2018-04-06.
Anskaffelsen ble publisert 2018-02-26.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2018-02-26) Gjenstand Anskaffelsens omfang
Tittel: Construction work
Referansenummer: 18/780
Kort beskrivelse:
Ringsaker municipality shall construct a new waterworks at Moelv. The chosen treatment process is based on the raw water quality and the need for treatment in order to fulfil the Drinking Water Regulations requirements.
The new Moelv Waterworks consists of several contracts. New water treatment facility (VBA) B1, this contract. The contracts electro E1, HVAC and sanitation V1, ventilation and plumbing R1. These will be transported to B1, which will be responsible for coordinating the contracts and progress.. The E1, R1 and V1 contracts are for deliveries for the building belonging to the raw water pump station included in contract B2.
Ringsaker municipality shall construct a new waterworks at Moelv. The chosen treatment process is based on the raw water quality and the need for treatment in order to fulfil the Drinking Water Regulations requirements.
The new Moelv Waterworks consists of several contracts. New water treatment facility (VBA) B1, this contract. The contracts electro E1, HVAC and sanitation V1, ventilation and plumbing R1. These will be transported to B1, which will be responsible for coordinating the contracts and progress.. The E1, R1 and V1 contracts are for deliveries for the building belonging to the raw water pump station included in contract B2.
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsvirksomhet📦
Tilleggs-CPV: Rørledninger til drikkevann📦 Utførelsessted
NUTS-region: Hedmark
🏙️
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Laveste pris
Ringsaker municipality shall construct a new waterworks at Moelv. The chosen treatment process is based on the raw water quality and the need for treatment in order to fulfil the Drinking Water Regulations requirements.
The new Moelv Waterworks consists of several contracts. New water treatment facility (VBA) B1, this contract. The contracts electro E1, HVAC and sanitation V1, ventilation and plumbing R1. These will be transported to B1, which will be responsible for coordinating the contracts and progress.. The E1, R1 and V1 contracts are for deliveries for the building belonging to the raw water pump station included in contract B2.
The new Moelv Waterworks consists of several contracts. New water treatment facility (VBA) B1, this contract. The contracts electro E1, HVAC and sanitation V1, ventilation and plumbing R1. These will be transported to B1, which will be responsible for coordinating the contracts and progress.. The E1, R1 and V1 contracts are for deliveries for the building belonging to the raw water pump station included in contract B2.
Estimert totalverdi: 70 000 000 NOK 💰
Kort beskrivelse:
The water treatment facility has a total area of 1 550 m² gross and was primarily constructed from concrete cast on site with a large amount of waterproof constructions. A clean water basin and reject basin are to constructed in the basement, in addition to a machine room and heat plant, etc. A monorail with a traverser carriage and pulley with 500 kg capacity is to be installed around the clean water basin in the machine room. The superstructure consists of a process hall with, amongst other things, a 5 tonne overhead travelling crane and technical and social rooms. Half storeys with family rooms are to be constructed at the ends of the process hall. Electrical switchboard room and stores. An integrally cast floor is to be generally laid over the supporting covers, including fall, gutters and drains, etc.
The water treatment facility has a total area of 1 550 m² gross and was primarily constructed from concrete cast on site with a large amount of waterproof constructions. A clean water basin and reject basin are to constructed in the basement, in addition to a machine room and heat plant, etc. A monorail with a traverser carriage and pulley with 500 kg capacity is to be installed around the clean water basin in the machine room. The superstructure consists of a process hall with, amongst other things, a 5 tonne overhead travelling crane and technical and social rooms. Half storeys with family rooms are to be constructed at the ends of the process hall. Electrical switchboard room and stores. An integrally cast floor is to be generally laid over the supporting covers, including fall, gutters and drains, etc.
Contract B1 consists of a surface water system for the eastern part of the VBA site and pipelines in /out of VBA to the contract border. A raw water pipeline Ø400 of ductile cast iron is to be laid in a ditch out from the north side of the VBA to the contract border with B2. Pure water pipelines out from the south side of the VBA consist of Ø400 and Ø200 ductile cast iron, which end in a ditch at the contract border with A1. An option is included for PE water pipelines. The surface water system includes sand trap manholes, manholes for rodding/flushing and a pump manhole for drainage water. The surface water pipeline Ø400 PVC out of the VBA has a non-return value in a manhole. The waste water pipelines 2xØ160 PVC out of the VBA are to be connected in a manhole outside the VBA, with a non-return value on the gravity pipeline. The surface water and waste water pipelines out of the south side of the VBA end in a joint ditch with water pipelines for contract A1. The clean water pipeline Ø400 ductile cast iron out from the south side of the VBA is to be connected with the water pipeline laid in contract S1.
Contract B1 consists of a surface water system for the eastern part of the VBA site and pipelines in /out of VBA to the contract border. A raw water pipeline Ø400 of ductile cast iron is to be laid in a ditch out from the north side of the VBA to the contract border with B2. Pure water pipelines out from the south side of the VBA consist of Ø400 and Ø200 ductile cast iron, which end in a ditch at the contract border with A1. An option is included for PE water pipelines. The surface water system includes sand trap manholes, manholes for rodding/flushing and a pump manhole for drainage water. The surface water pipeline Ø400 PVC out of the VBA has a non-return value in a manhole. The waste water pipelines 2xØ160 PVC out of the VBA are to be connected in a manhole outside the VBA, with a non-return value on the gravity pipeline. The surface water and waste water pipelines out of the south side of the VBA end in a joint ditch with water pipelines for contract A1. The clean water pipeline Ø400 ductile cast iron out from the south side of the VBA is to be connected with the water pipeline laid in contract S1.
Estimert verdi eksklusive mva: 70 000 000 NOK 💰
Varighet: 20 måneder Utførelsessted
Hovedsted eller utførelsessted: Moelv, Norway.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten:
Tenderers must submit:
— an ESPD form is also to be submitted for sub-suppliers,
— self-declaration HSE,
— experience - technical and professional qualifications - reference projects,
— experience - the Builder´s experience - reference projects,
— expertise of key personnel,
— tax certificate, only for the chosen tenderer.
See the details in the tender documentation for detailed information on the quality requirements and documentation requirements.
Økonomisk og finansiell stilling:
Tenderers must document:
— positive equity,
— turnover at least as large as the annual turnover generated by this contract.
Teknisk og faglig kapasitet:
Tenderers must document:
— experience from equivalent projects,
— the builder's experience from equivalent projects,
— the key persons' qualifications.
Kontraktutførelse
Vilkår for kontraktoppfyllelse:
Tenderers must fulfil the requirements in NS8406 as well as Ringsaker municipality´s special contract terms.
Prosedyre
Tidspunkt for mottak av tilbud: 09:00
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Tilbudets gyldighetsperiode: 2018-07-06 📅
Dato for åpning av tilbud: 2018-04-06 📅
Tidspunkt for åpning av tilbud: 09:15
Sted: Technical operations.
In the Administration Building, Ringsaker municipality.
Furnesvegen 28.
2382 Brumunddal
Tilleggsinformasjon: Heidi Strandvik.
Tilleggsinformasjon (2018-03-13) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
Ringsaker kommune shall construct new waterworks at Moelv. The selected treatment process is based on raw water quality and the need for treatment that satisfies requirements in the drinking water regulation.
The new Moelv Waterworks comprises multiple contracts. New water treatment facility (VBA) B1, this contract. The contracts electro E1, HVAC and sanitation V1, ventilation and plumbing R1. These will be transported to B1, which will be responsible for the coordination of the contracts and the progress. Contracts E1, R1 and V1 have deliveries for the building belonging to the raw water pump station included in contract B2.
Ringsaker kommune shall construct new waterworks at Moelv. The selected treatment process is based on raw water quality and the need for treatment that satisfies requirements in the drinking water regulation.
The new Moelv Waterworks comprises multiple contracts. New water treatment facility (VBA) B1, this contract. The contracts electro E1, HVAC and sanitation V1, ventilation and plumbing R1. These will be transported to B1, which will be responsible for the coordination of the contracts and the progress. Contracts E1, R1 and V1 have deliveries for the building belonging to the raw water pump station included in contract B2.
Metadata for kunngjøring
Dokumenttype: Tilleggsinformasjon
Ringsaker kommune shall construct new waterworks at Moelv. The selected treatment process is based on raw water quality and the need for treatment that satisfies requirements in the drinking water regulation.
The new Moelv Waterworks comprises multiple contracts. New water treatment facility (VBA) B1, this contract. The contracts electro E1, HVAC and sanitation V1, ventilation and plumbing R1. These will be transported to B1, which will be responsible for the coordination of the contracts and the progress. Contracts E1, R1 and V1 have deliveries for the building belonging to the raw water pump station included in contract B2.
The new Moelv Waterworks comprises multiple contracts. New water treatment facility (VBA) B1, this contract. The contracts electro E1, HVAC and sanitation V1, ventilation and plumbing R1. These will be transported to B1, which will be responsible for the coordination of the contracts and the progress. Contracts E1, R1 and V1 have deliveries for the building belonging to the raw water pump station included in contract B2.
Tilleggsinformasjon (2018-03-16) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
Ringsaker kommune shall construct new waterworks at Moelv. The selected treatment process is based on
Raw water quality and the need for treatment that satisfies requirements in the Drinking Water Regulation.
The new Moelv Waterworks comprises multiple contracts. New water treatment facility (VBA) B1, this contract. The contracts electro E1, HVAC and sanitation V1, ventilation and plumbing R1. These will be transported to B1, which will be responsible for the coordination of the contracts and the progress. Contracts E1, R1 and V1 have deliveries for the building belonging to the raw water pump station included in contract B2.
Ringsaker kommune shall construct new waterworks at Moelv. The selected treatment process is based on
Raw water quality and the need for treatment that satisfies requirements in the Drinking Water Regulation.
The new Moelv Waterworks comprises multiple contracts. New water treatment facility (VBA) B1, this contract. The contracts electro E1, HVAC and sanitation V1, ventilation and plumbing R1. These will be transported to B1, which will be responsible for the coordination of the contracts and the progress. Contracts E1, R1 and V1 have deliveries for the building belonging to the raw water pump station included in contract B2.
Ringsaker kommune shall construct new waterworks at Moelv. The selected treatment process is based on
Raw water quality and the need for treatment that satisfies requirements in the Drinking Water Regulation.
Kilde: OJS 2018/S 054-120726 (2018-03-16)
Kunngjøring om tildeling av kontrakt (2018-08-03) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
Ringsaker kommune shall construct new waterworks at Moelv. The selected treatment process is based on raw water quality and the need for treatment that satisfies requirements in the Drinking Water Regulation.
The new Moelv Waterworks comprises multiple contracts. New water treatment facility (VBA) B1, this contract. The contracts electro E1, HVAC and sanitation V1, ventilation and plumbing R1. These will be transported to B1, which will be responsible for the coordination of the contracts and the progress. Contracts E1, R1 and V1 have deliveries for the building belonging to the raw water pump station included in contract B2.
Ringsaker kommune shall construct new waterworks at Moelv. The selected treatment process is based on raw water quality and the need for treatment that satisfies requirements in the Drinking Water Regulation.
The new Moelv Waterworks comprises multiple contracts. New water treatment facility (VBA) B1, this contract. The contracts electro E1, HVAC and sanitation V1, ventilation and plumbing R1. These will be transported to B1, which will be responsible for the coordination of the contracts and the progress. Contracts E1, R1 and V1 have deliveries for the building belonging to the raw water pump station included in contract B2.
Totalverdi for anskaffelsen: 130 000 000 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Ringsaker kommune shall construct new waterworks at Moelv. The selected treatment process is based on raw water quality and the need for treatment that satisfies requirements in the Drinking Water Regulation.
The water treatment facility has a total area of 1 550 m
Contract B1 consists of a surface water system for the eastern part of the VBA site and pipelines in/out of VBA to the contract border. A raw water pipeline Ø400 of ductile cast iron is to be laid in a ditch out from the north side of the VBA to the contract border with B2. Pure water pipelines out from the south side of the VBA consist of Ø400 and Ø200 ductile cast iron, which end in a ditch at the contract border with A1. An option is included for PE water pipelines. The surface water system includes sand trap manholes, manholes for rodding/flushing and a pump manhole for drainage water. The surface water pipeline Ø400 PVC out of the VBA has a non-return value in a manhole. The waste water pipelines 2xØ160 PVC out of the VBA are to be connected in a manhole outside the VBA, with a non-return value on the gravity pipeline. The surface water and waste water pipelines out of the south side of the VBA end in a joint ditch with water pipelines for contract A1. The clean water pipeline Ø400 ductile cast iron out from the south side of the VBA is to be connected with the water pipeline laid in contract S1.
Contract B1 consists of a surface water system for the eastern part of the VBA site and pipelines in/out of VBA to the contract border. A raw water pipeline Ø400 of ductile cast iron is to be laid in a ditch out from the north side of the VBA to the contract border with B2. Pure water pipelines out from the south side of the VBA consist of Ø400 and Ø200 ductile cast iron, which end in a ditch at the contract border with A1. An option is included for PE water pipelines. The surface water system includes sand trap manholes, manholes for rodding/flushing and a pump manhole for drainage water. The surface water pipeline Ø400 PVC out of the VBA has a non-return value in a manhole. The waste water pipelines 2xØ160 PVC out of the VBA are to be connected in a manhole outside the VBA, with a non-return value on the gravity pipeline. The surface water and waste water pipelines out of the south side of the VBA end in a joint ditch with water pipelines for contract A1. The clean water pipeline Ø400 ductile cast iron out from the south side of the VBA is to be connected with the water pipeline laid in contract S1.
Tildeling av kontrakt
Dato for kontraktinngåelse: 2018-05-15 📅
Navn: Dobloug Entreprenør AS
Poststed: Ingeberg
Land: Norge 🇳🇴 Hedmark
🏙️
Totalverdi for anskaffelsen: 41 940 736 NOK 💰
Informasjon om tilbud
Antall mottatte tilbud: 2
Oppdragsgiver Kontakt
Kontaktpunkt: Magnus Petersen