Ringsaker municipality shall construct a new waterworks at Moelv. The chosen treatment process is based on the raw water quality and the need for treatment in order to fulfil the Drinking Water Regulations' requirements.
The new Moelv Waterworks consists of several contracts. This contract is for HVAC and sanitation installations and is called contract R1.
The building and ground work connected to the new water treatment facility (VBA) is B1. Electro E1, HVAC and sanitation R1, ventilation V1 contracts. These will be transported to B1, which will be responsible for the coordination of the contracts and the progress. Contracts E1, R1 and V1 have deliveries for the building belonging to the raw water pump station included in contract B2.
Frist
Fristen for mottak av tilbud var 2018-04-06.
Anskaffelsen ble publisert 2018-02-26.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2018-02-26) Gjenstand Anskaffelsens omfang
Tittel: Drinking water
Referansenummer: 18/903
Kort beskrivelse:
“Ringsaker municipality shall construct a new waterworks at Moelv. The chosen treatment process is based on the raw water quality and the need for treatment...”
Kort beskrivelse
Ringsaker municipality shall construct a new waterworks at Moelv. The chosen treatment process is based on the raw water quality and the need for treatment in order to fulfil the Drinking Water Regulations' requirements.
Vis mer Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Drikkevann📦
Tilleggs-CPV: Drikkevann📦 Utførelsessted
NUTS-region: no021 🏙️
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Laveste pris
Kunngjøring om tildeling av kontrakt (2018-08-03) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
“Ringsaker kommune shall construct new waterworks at Moelv. The selected treatment process is based on raw water quality and the need for treatment that...”
Kort beskrivelse
Ringsaker kommune shall construct new waterworks at Moelv. The selected treatment process is based on raw water quality and the need for treatment that satisfies requirements in the Drinking Water Regulation.
Vis mer
Totalverdi for anskaffelsen: 130 000 000 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt