Oslo municipality is establishing a new water supply system with Holsfjorden as the raw water source. The aim is to ensure drinking water for inhabitants if the current water supply fails. The project's estimated cost is currently approx. 8 500 000 000 NOK. The preliminary project has already started, which shall be completed by the end of the 2nd quarter of 2018. The construction period is scheduled for 2020 to 2028. This competition is for the procurement of two (2) parallel framework agreements for project management and administration in the preliminary project and middle phase. The procurement includes several competence areas and roles, including project management, SHA, procurements (public procurements), landowner agreements, project management (subproject management), progress planning, etc. So far it is unclear whether there will be a need to hire in all the roles and whether the need for assistance will be for short/long periods or full/part time.
Frist
Fristen for mottak av tilbud var 2018-06-28.
Anskaffelsen ble publisert 2018-05-29.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2018-05-29) Gjenstand Anskaffelsens omfang
Tittel: Consultative engineering and construction services
Referansenummer: 21/2018 New announcement
Kort beskrivelse:
Oslo municipality is establishing a new water supply system with Holsfjorden as the raw water source. The aim is to ensure drinking water for inhabitants if the current water supply fails. The project's estimated cost is currently approx. 8 500 000 000 NOK. The preliminary project has already started, which shall be completed by the end of the 2nd quarter of 2018. The construction period is scheduled for 2020 to 2028. This competition is for the procurement of two (2) parallel framework agreements for project management and administration in the preliminary project and middle phase.
The procurement includes several competence areas and roles, including project management, SHA, procurements (public procurements), landowner agreements, project management (subproject management), progress planning, etc. So far it is unclear whether there will be a need to hire in all the roles and whether the need for assistance will be for short/long periods or full/part time.
Oslo municipality is establishing a new water supply system with Holsfjorden as the raw water source. The aim is to ensure drinking water for inhabitants if the current water supply fails. The project's estimated cost is currently approx. 8 500 000 000 NOK. The preliminary project has already started, which shall be completed by the end of the 2nd quarter of 2018. The construction period is scheduled for 2020 to 2028. This competition is for the procurement of two (2) parallel framework agreements for project management and administration in the preliminary project and middle phase.
The procurement includes several competence areas and roles, including project management, SHA, procurements (public procurements), landowner agreements, project management (subproject management), progress planning, etc. So far it is unclear whether there will be a need to hire in all the roles and whether the need for assistance will be for short/long periods or full/part time.
Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
Oslo municipality is establishing a new water supply system with Holsfjorden as the raw water source. The aim is to ensure drinking water for inhabitants if the current water supply fails. The project's estimated cost is currently approx. 8 500 000 000 NOK. The preliminary project has already started, which shall be completed by the end of the 2nd quarter of 2018. The construction period is scheduled for 2020 to 2028. This competition is for the procurement of two (2) parallel framework agreements for project management and administration in the preliminary project and middle phase.
Oslo municipality is establishing a new water supply system with Holsfjorden as the raw water source. The aim is to ensure drinking water for inhabitants if the current water supply fails. The project's estimated cost is currently approx. 8 500 000 000 NOK. The preliminary project has already started, which shall be completed by the end of the 2nd quarter of 2018. The construction period is scheduled for 2020 to 2028. This competition is for the procurement of two (2) parallel framework agreements for project management and administration in the preliminary project and middle phase.
The procurement includes several competence areas and roles, including project management, SHA, procurements (public procurements), landowner agreements, project management (subproject management), progress planning, etc. So far it is unclear whether there will be a need to hire in all the roles and whether the need for assistance will be for short/long periods or full/part time.
The procurement includes several competence areas and roles, including project management, SHA, procurements (public procurements), landowner agreements, project management (subproject management), progress planning, etc. So far it is unclear whether there will be a need to hire in all the roles and whether the need for assistance will be for short/long periods or full/part time.
Oslo municipality is establishing a new water supply system with Holsfjorden as the raw water source. The aim is to ensure drinking water for inhabitants if the current water supply fails. The project´s estimated cost is currently approx. 8 500 000 000 NOK. The preliminary project has already started, which shall be completed by the end of the 2nd quarter of 2018. The construction period is scheduled for 2020 to 2028. This competition is for the procurement of two (2) parallel framework agreements for project management and administration in the preliminary project and middle phase. The procurement includes several competence areas and roles, including project management, SHA, procurements (public procurements), landowner agreements, project management (sub-project management), progress planning, etc. So far it is unclear whether there will be a need to hire in all the roles and whether the need for assistance will be for short/long periods or full/part time.The scope of work will probably correspond to 2-5 full positions throughout the period, but may also be greater than this.
Oslo municipality is establishing a new water supply system with Holsfjorden as the raw water source. The aim is to ensure drinking water for inhabitants if the current water supply fails. The project´s estimated cost is currently approx. 8 500 000 000 NOK. The preliminary project has already started, which shall be completed by the end of the 2nd quarter of 2018. The construction period is scheduled for 2020 to 2028. This competition is for the procurement of two (2) parallel framework agreements for project management and administration in the preliminary project and middle phase. The procurement includes several competence areas and roles, including project management, SHA, procurements (public procurements), landowner agreements, project management (sub-project management), progress planning, etc. So far it is unclear whether there will be a need to hire in all the roles and whether the need for assistance will be for short/long periods or full/part time.The scope of work will probably correspond to 2-5 full positions throughout the period, but may also be greater than this.
Beskrivelse av fornyelser: Option for a one year extension on the same terms.
Beskrivelse av opsjoner: Option for a one year extension on the same terms.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten:
— The supplier can not have overdue outstanding taxes and fees.
— The tenderer shall be a legally established company.
See the attached qualification documentation for the documentation requirements.
Minste nivå(er) av standarder:
Tenderers shall have good solidity and the financial capacity to fulfil the assignment/contract.
See the attached qualification documentation for the documentation requirements.
— Project management must be a defined competence area in the company.
The tenderer must have sufficient capacity and relevant competence to fulfil the framework agreement.
The tenderer shall have good experience from similar deliveries.
Prosedyre
Minste antall kandidater: 3
Største antall kandidater: 5
Objektive kriterier for å velge det begrensede antallet kandidater:
The 3-5 suppliers who best meet the qualification criteria will be invited for participation in the competition. In the selection process, the qualification criteria will be assessed in the following prioritized order:
— Supplier's capacity and competence.
— Supplier experience from similar deliveries.
— Supplier's solidity and financial capacity.
Antall deltakere som skal vurderes: 2
Tidspunkt for mottak av tilbud: 10:00
Dato for utsendelse av invitasjoner: 2018-07-04 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Tilbudets gyldighetsperiode: 3 måneder
Utfyllende informasjon Klageinstans
Navn: Oslo kommune, Vann- og avløpsetaten
Poststed: Oslo
Land: Norge 🇳🇴
Kilde: OJS 2018/S 101-232093 (2018-05-29)
Kunngjøring om tildeling av kontrakt (2018-12-05) Gjenstand Anskaffelsens omfang
Referansenummer: 21/2018 Ny kunngjøring
Kort beskrivelse:
Oslo municipality is establishing a new water supply system with Holsfjorden as the raw water source. The aim is to ensure drinking water for inhabitants if the current water supply fails. The project´s estimated cost is currently approx. 8.5 billion NOK The preliminary project has already started, which shall be completed by the end of the 2nd quarter of 2018. The construction period is scheduled for 2020 to 2028.
This competition is for the procurement of two (2) parallel framework agreements for project management and administration in the preliminary project and middle phase.
The contract includes several competence areas and functions, including project management, SHA, procurements (public procurements), landowner agreements, project management (sub-project management), progress planning, etc.
So far it is unclear whether there will be a need to hire in all the roles and whether the need for assistance
Will be for short/long periods or full/part time. The work scope shall probably be equivalent to 2-5 full-time jobs. However, this scope may be extended.
Oslo municipality is establishing a new water supply system with Holsfjorden as the raw water source. The aim is to ensure drinking water for inhabitants if the current water supply fails. The project´s estimated cost is currently approx. 8.5 billion NOK The preliminary project has already started, which shall be completed by the end of the 2nd quarter of 2018. The construction period is scheduled for 2020 to 2028.
This competition is for the procurement of two (2) parallel framework agreements for project management and administration in the preliminary project and middle phase.
The contract includes several competence areas and functions, including project management, SHA, procurements (public procurements), landowner agreements, project management (sub-project management), progress planning, etc.
So far it is unclear whether there will be a need to hire in all the roles and whether the need for assistance
Will be for short/long periods or full/part time. The work scope shall probably be equivalent to 2-5 full-time jobs. However, this scope may be extended.
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Referanse Datoer
Sendt dato: 2018-12-05 📅
Publiseringsdato: 2018-12-06 📅
Identifikatorer
Kunngjøringsnummer: 2018/S 235-538627
Refererer til kunngjøring: 2018/S 101-232093
OJ-S-utgave: 235
Gjenstand Anskaffelsens omfang
Kort beskrivelse:
Oslo municipality is establishing a new water supply system with Holsfjorden as the raw water source. The aim is to ensure drinking water for inhabitants if the current water supply fails. The project´s estimated cost is currently approx. 8.5 billion NOK The preliminary project has already started, which shall be completed by the end of the 2nd quarter of 2018. The construction period is scheduled for 2020 to 2028.
Oslo municipality is establishing a new water supply system with Holsfjorden as the raw water source. The aim is to ensure drinking water for inhabitants if the current water supply fails. The project´s estimated cost is currently approx. 8.5 billion NOK The preliminary project has already started, which shall be completed by the end of the 2nd quarter of 2018. The construction period is scheduled for 2020 to 2028.
This competition is for the procurement of two (2) parallel framework agreements for project management and administration in the preliminary project and middle phase.
The contract includes several competence areas and functions, including project management, SHA, procurements (public procurements), landowner agreements, project management (sub-project management), progress planning, etc.
So far it is unclear whether there will be a need to hire in all the roles and whether the need for assistance
Will be for short/long periods or full/part time. The work scope shall probably be equivalent to 2-5 full-time jobs. However, this scope may be extended.
Beskrivelse av opsjoner: Option for one year prolongation for the framework agreements.
Tildeling av kontrakt
Dato for kontraktinngåelse: 2018-10-31 📅
Navn: WSP Norge AS
Nasjonalt registreringsnummer: 881894742
Poststed: Oslo
Land: Norge 🇳🇴
Dato for kontraktinngåelse: 2018-10-22 📅
Navn: Metier OEC AS
Nasjonalt registreringsnummer: 917807590
Informasjon om tilbud
Antall mottatte tilbud: 5
Oppdragsgiver Kontakt
Kontaktpunkt: Asbjørn Karlsrud
Kilde: OJS 2018/S 235-538627 (2018-12-05)