Bybanen AS wants to enter into a framework agreement with one construction machine contractor for the delivery of contractor services with crew, construction management as well as machines, transport and equipment for works that shall be carried out at our facilities connected to the Light Rail and trolleybuses. The majority of the assignment will be for roads, water and sewage works as well as excavation works. It should be anticipated that work near rails must be carried out during the evening/night when the light rail has less traffic. In some cases it may be necessary to engineer design technical solutions, and in such circumstances the contractor shall procure an engineering design consultant with sufficient competence and responsibility classification in relation to the assignments.
Frist
Fristen for mottak av tilbud var 2018-02-19.
Anskaffelsen ble publisert 2018-01-15.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2018-01-15) Gjenstand Anskaffelsens omfang
Tittel: Hire of construction and civil engineering machinery and equipment with operator
Referansenummer: 2018-02
Kort beskrivelse:
Bybanen AS wants to enter into a framework agreement with one construction machine contractor for the delivery of contractor services with crew, construction management as well as machines, transport and equipment for works that shall be carried out at our facilities connected to the Light Rail and trolleybuses.
The majority of the assignment will be for roads, water and sewage works as well as excavation works. It should be anticipated that work near rails must be carried out during the evening/night when the light rail has less traffic. In some cases it may be necessary to engineer design technical solutions, and in such circumstances the contractor shall procure an engineering design consultant with sufficient competence and responsibility classification in relation to the assignments.
Bybanen AS wants to enter into a framework agreement with one construction machine contractor for the delivery of contractor services with crew, construction management as well as machines, transport and equipment for works that shall be carried out at our facilities connected to the Light Rail and trolleybuses.
The majority of the assignment will be for roads, water and sewage works as well as excavation works. It should be anticipated that work near rails must be carried out during the evening/night when the light rail has less traffic. In some cases it may be necessary to engineer design technical solutions, and in such circumstances the contractor shall procure an engineering design consultant with sufficient competence and responsibility classification in relation to the assignments.
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Tjenester
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Utleie av entreprenørmateriell og -utstyr med operatør📦 Utførelsessted
NUTS-region: Hordaland
🏙️
Prosedyre
Prosedyretype: Begrenset anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
Bybanen AS wants to enter into a framework agreement with one construction machine contractor for the delivery of contractor services with crew, construction management as well as machines, transport and equipment for works that shall be carried out at our facilities connected to the Light Rail and trolleybuses.
Bybanen AS wants to enter into a framework agreement with one construction machine contractor for the delivery of contractor services with crew, construction management as well as machines, transport and equipment for works that shall be carried out at our facilities connected to the Light Rail and trolleybuses.
The majority of the assignment will be for roads, water and sewage works as well as excavation works. It should be anticipated that work near rails must be carried out during the evening/night when the light rail has less traffic. In some cases it may be necessary to engineer design technical solutions, and in such circumstances the contractor shall procure an engineering design consultant with sufficient competence and responsibility classification in relation to the assignments.
The majority of the assignment will be for roads, water and sewage works as well as excavation works. It should be anticipated that work near rails must be carried out during the evening/night when the light rail has less traffic. In some cases it may be necessary to engineer design technical solutions, and in such circumstances the contractor shall procure an engineering design consultant with sufficient competence and responsibility classification in relation to the assignments.
Estimert totalverdi: 5 000 000 NOK 💰
Kort beskrivelse:
Bybanen AS wants to enter into a framework agreement with one construction machine contractor for the delivery of contractor services with crew, construction management as well as machines, transport and equipment for works that shall be carried out at our facilities connected to the light rail and trolleybuses.
Bybanen AS wants to enter into a framework agreement with one construction machine contractor for the delivery of contractor services with crew, construction management as well as machines, transport and equipment for works that shall be carried out at our facilities connected to the light rail and trolleybuses.
In general, the contractor shall be able to take care of the maintenance work and projects through the framework agreement.
relevant work assignments are:
— road, water and sewage works,
— asphalt work,
— excavation work,
— masonry, plastering and tiling works, pavement,
— concrete works,
— metal works, welding,
— pigging and drilling,
— track work,
— engineering design of technical solutions.
The contractor must be able to procure all of the necessary requirement for all relevant assignments. This also concerns necessary safety and sign age material. The contractor must also provide the preparation of the sign plan and roadwork signs.
The contractor procures materials. The mark-up shall be 10 %. In certain circumstances the material for the projects can be procured by the contracting authority. This will be agreed from assignment to assignment.
response time:
Ordered works must be started within a maximum of ten days calculated from the contracting authority’s order. Deviations from this must must be agreed upon when ordering.
Varighet: 24 måneder
Beskrivelse av fornyelser:
The contracting authority shall have an option to extend the framework agreement for a further one year + one year + one year, up to a total maximum of 5 years.
Beskrivelse av opsjoner:
The contracting authority shall have an option to extend the framework agreement for a further one year + one year + one year, up to a total maximum of 5 years.
Utførelsessted
Hovedsted eller utførelsessted: Bergen.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten:
— The tenders must have their affairs in order with respect to the payment of tax, payroll tax and value added tax (VAT).
The tenderer must be a legally established enterprise.
The documentation requirement is provided in the tender documentation.
Økonomisk og finansiell stilling:
The tenderer shall have sufficient financial strength to be able to implement the contract.
Creditworthiness with no requirement for guarantees will be sufficient to meet the requirement.
Minste nivå(er) av standarder:
Documentation requirement:
— Credit rating based on the last known accounting figures, not older than 6 months. The rating shall be carried out by a credit rating company with licence to conduct this service.
If a tenderer has valid reasons for not being able to provide the documentation requested by the contracting authority, the tenderer can prove his economic and financial position with any other document that the contracting authority deems suitable.
Teknisk og faglig kapasitet:
— The tenderer shall have sufficient implementation ability and capacity to be able to fulfil the contract,
— Tenderers shall have good experience from similar deliveries.
Minste nivå(er) av standarder: Description of the documentation requirement in the tender documentation.
Liste og kort beskrivelse av regler og kriterier:
The work is to be done with the least possible impact on the environment, including noise, waste, emissions, energy consumption, and recycling.
Documentation Requirement: The tenderer must explain the company's practices/routines for fulfilment of the stated environmental requirements.
Prosedyre
Minste antall kandidater: 4
Største antall kandidater: 6
Objektive kriterier for å velge det begrensede antallet kandidater: See the tender documentation point 10.3.
Tidspunkt for mottak av tilbud: 12:00
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Tilbudets gyldighetsperiode: 2018-05-04 📅
Kunngjøring om tildeling av kontrakt (2018-05-05) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
Bybanen AS wants to enter into a framework agreement with one construction machine contractor for the delivery of contractor services with crew, construction management as well as machines, transport and equipment for works that shall be carried out at our facilities connected to the Light Rail and trolleybuses.
The majority of the assignment will be for roads, water and sewage works as well as excavation works. It should be anticipated that work near rails must be carried out during the evening/night when the Light Rail has less traffic. In some cases it may be necessary to engineer design technical solutions, and in such circumstances the contractor shall procure an engineering design consultant with sufficient competence and responsibility classification in relation to the assignments.
Bybanen AS wants to enter into a framework agreement with one construction machine contractor for the delivery of contractor services with crew, construction management as well as machines, transport and equipment for works that shall be carried out at our facilities connected to the Light Rail and trolleybuses.
The majority of the assignment will be for roads, water and sewage works as well as excavation works. It should be anticipated that work near rails must be carried out during the evening/night when the Light Rail has less traffic. In some cases it may be necessary to engineer design technical solutions, and in such circumstances the contractor shall procure an engineering design consultant with sufficient competence and responsibility classification in relation to the assignments.
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Prosedyre
Tilbudstype: Ikke aktuelt
Referanse Datoer
Sendt dato: 2018-05-05 📅
Publiseringsdato: 2018-05-08 📅
Identifikatorer
Kunngjøringsnummer: 2018/S 088-199067
Refererer til kunngjøring: 2018/S 011-022126
OJ-S-utgave: 88
Gjenstand Anskaffelsens omfang
Kort beskrivelse:
The majority of the assignment will be for roads, water and sewage works as well as excavation works. It should be anticipated that work near rails must be carried out during the evening/night when the Light Rail has less traffic. In some cases it may be necessary to engineer design technical solutions, and in such circumstances the contractor shall procure an engineering design consultant with sufficient competence and responsibility classification in relation to the assignments.
The majority of the assignment will be for roads, water and sewage works as well as excavation works. It should be anticipated that work near rails must be carried out during the evening/night when the Light Rail has less traffic. In some cases it may be necessary to engineer design technical solutions, and in such circumstances the contractor shall procure an engineering design consultant with sufficient competence and responsibility classification in relation to the assignments.
Relevant work assignments are:
— Road, water and sewage works,
— Asphalt work,
— Excavation work,
— Masonry, plastering and tiling works, pavement,
— Concrete works,
— Metal works, welding,
— Pigging and drilling,
— Track work,
— Engineering design of technical solutions.
The contractor procures materials. The mark-up shall be 10 %. In certain circumstances the material for the projects can be procured by the Contracting Authority. This will be agreed from assignment to assignment.
Response time:
Ordered works must be started within a maximum of ten days calculated from the Contracting Authority’s order. Deviations from this must must be agreed upon when ordering.
Beskrivelse av opsjoner:
The Contracting Authority shall have an option to extend the framework agreement for a further 1 year + 1 year + 1 year, up to a total maximum of 5 years.
Tildeling av kontrakt
Dato for kontraktinngåelse: 2018-05-02 📅
Navn: Løvaas Maskin AS
Postadresse: Espehaugen 54
Poststed: Blomsterdalen
Postnummer: 5258
Land: Norge 🇳🇴 Hordaland
🏙️
Kilde: OJS 2018/S 088-199067 (2018-05-05)