The project is a turnkey contract that comprises engineering design services, execution and inspections of the new county road 541 from Sakseid to Hestaneset in Bømlo Municipality, as well as engineering design services and execution of work included in the land contracts with the landowners along the route. The project is split into two parts, with a main part and an option part: Part 1: “Våge — Hestaneset profile 3250 to 9970” Part 2: Option “Sakseid — Våge profile 80 to 3250”. The project consists of the development plan 'Development Plan County Road 541 Sakseid – Hestaneset' with the National Area Plan-ID 1219201406 dated 13.2.2017. The project also includes work involved in laying conduits and new electrical installations for Finnås Kraftlag (FK) and moving and establishing water and sewage pipelines for Bømlo vatn og avløpsselskap AS (BVA). Conduits are also to be laid and drawing manholes are to be established for Telenor´s sub-supplier, Eltel (ET), in a joint street light ditch on parts of the lot.
Frist
Fristen for mottak av tilbud var 2019-02-28.
Anskaffelsen ble publisert 2018-11-26.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2018-11-26) Gjenstand Anskaffelsens omfang
Tittel: Construction work
Referansenummer: 18/114918
Kort beskrivelse:
The project is a turnkey contract that comprises engineering design services, execution and inspections of the new county road 541 from Sakseid to Hestaneset in Bømlo Municipality, as well as engineering design services and execution of work included in the land contracts with the landowners along the route.
The project is split into two parts, with a main part and an option part:
Part 1: “Våge — Hestaneset profile 3250 to 9970”
Part 2: Option “Sakseid — Våge profile 80 to 3250”.
The project consists of the development plan 'Development Plan County Road 541 Sakseid – Hestaneset' with the National Area Plan-ID 1219201406 dated 13.2.2017.
The project also includes work involved in laying conduits and new electrical installations for Finnås Kraftlag (FK) and moving and establishing water and sewage pipelines for Bømlo vatn og avløpsselskap AS (BVA). Conduits are also to be laid and drawing manholes are to be established for Telenor´s sub-supplier, Eltel (ET), in a joint street light ditch on parts of the lot.
The project is a turnkey contract that comprises engineering design services, execution and inspections of the new county road 541 from Sakseid to Hestaneset in Bømlo Municipality, as well as engineering design services and execution of work included in the land contracts with the landowners along the route.
The project is split into two parts, with a main part and an option part:
Part 1: “Våge — Hestaneset profile 3250 to 9970”
Part 2: Option “Sakseid — Våge profile 80 to 3250”.
The project consists of the development plan 'Development Plan County Road 541 Sakseid – Hestaneset' with the National Area Plan-ID 1219201406 dated 13.2.2017.
The project also includes work involved in laying conduits and new electrical installations for Finnås Kraftlag (FK) and moving and establishing water and sewage pipelines for Bømlo vatn og avløpsselskap AS (BVA). Conduits are also to be laid and drawing manholes are to be established for Telenor´s sub-supplier, Eltel (ET), in a joint street light ditch on parts of the lot.
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsvirksomhet📦
Tilleggs-CPV: Bygge- og anleggsvirksomhet📦 Utførelsessted
NUTS-region: Hordaland
🏙️
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Laveste pris
The project is a turnkey contract that comprises engineering design services, execution and inspections of the new county road 541 from Sakseid to Hestaneset in Bømlo Municipality, as well as engineering design services and execution of work included in the land contracts with the landowners along the route.
The project is a turnkey contract that comprises engineering design services, execution and inspections of the new county road 541 from Sakseid to Hestaneset in Bømlo Municipality, as well as engineering design services and execution of work included in the land contracts with the landowners along the route.
The project is split into two parts, with a main part and an option part:
Part 1: “Våge — Hestaneset profile 3250 to 9970”
Part 2: Option “Sakseid — Våge profile 80 to 3250”.
The project consists of the development plan 'Development Plan County Road 541 Sakseid – Hestaneset' with the National Area Plan-ID 1219201406 dated 13.2.2017.
The project also includes work involved in laying conduits and new electrical installations for Finnås Kraftlag (FK) and moving and establishing water and sewage pipelines for Bømlo vatn og avløpsselskap AS (BVA). Conduits are also to be laid and drawing manholes are to be established for Telenor´s sub-supplier, Eltel (ET), in a joint street light ditch on parts of the lot.
The project also includes work involved in laying conduits and new electrical installations for Finnås Kraftlag (FK) and moving and establishing water and sewage pipelines for Bømlo vatn og avløpsselskap AS (BVA). Conduits are also to be laid and drawing manholes are to be established for Telenor´s sub-supplier, Eltel (ET), in a joint street light ditch on parts of the lot.
The road has a total length of approx. 10 km. For the 50 km/h zone past Kuleseid and the 60 km/h zone on the stretch Kuleseid-Hidle, the road is to be constructed in accordance with dimension class Sa2 and H1, with a road width of 6,5 m, the remainder is to be constructed in accordance with dimension class HØ2, 7.5 m. This dimension class applies to county roads with a speed limit of 80 km/h and with a dimensioned annual daily traffic count above 1500 vehicles. The same standard is to be constructed over the entire stretch, even if the amount of traffic could allow a lower standard on parts of the road.
The road has a total length of approx. 10 km. For the 50 km/h zone past Kuleseid and the 60 km/h zone on the stretch Kuleseid-Hidle, the road is to be constructed in accordance with dimension class Sa2 and H1, with a road width of 6,5 m, the remainder is to be constructed in accordance with dimension class HØ2, 7.5 m. This dimension class applies to county roads with a speed limit of 80 km/h and with a dimensioned annual daily traffic count above 1500 vehicles. The same standard is to be constructed over the entire stretch, even if the amount of traffic could allow a lower standard on parts of the road.
A foot/cycle path is to be separated from the main road with a verge of 1,5 m between profile 1200-2200 and 2665-3500 and railings between profile 2200-2665.
New bus lay-bys are to be located in the approx. profile areas 1480, 1580, 1960, 2040, 2570, 2720, 3330, 3440, 4050, 4160, 6460, 6570, 8620 and 8730.
2 new bridges and 4 major constructions are to be engineered and executed in the project, as stated in table 1.1 in the tender documentation.
In addition to the constructions mentioned above, earth mounds, animal underpasses, agricultural exits and minor exits are to be engineered and executed in accordance with the development plan map and land contracts.
Junctions and exits are to be engineered and executed in accordance with the development plan in approx. profile area 12, 90, 270, 625, 1285, 1428, 1532, 1625, 1768, 1902, 2028, 2213, 2598, 2690, 3046, 3382, 4070, 5195, 6522, 8680, 8775, 8977, 9814.
A sea filling is to be established in profile area approx. 600 — 820, with special restrictions for revegetation, design, planting and a return of vegetation that is natural road vegetation for this area.
The main road with a road width of 7,5 m is to be engineered and executed with reinforced central markings.
Intensively lit pedestrian crossings must also be engineered and executed, which are suitable for the assembly of lit pedestrian crossing signs at a later date.
The entire stretch, including transition zones and transition zones to municipal roads must be lit. The contractor must do the necessary light calculations and engineering for the lighting installations in accordance with the Norwegian Public Road Administration´s hand books.
The entire stretch, including transition zones and transition zones to municipal roads must be lit. The contractor must do the necessary light calculations and engineering for the lighting installations in accordance with the Norwegian Public Road Administration´s hand books.
Challenging geological conditions are expected. The contractor must have persons with rock engineering/geology engineering competence on site during the entire construction period.
The project will be carried out on the basis of drawings.
Beskrivelse av opsjoner:
Part 2: Option “Sakseid - Våge profile 80 to 3250”.
Completion deadline: 28.10.2022.
Tilleggsinformasjon: Tender conference 10.1.2019 at 09:30 at Stord Traffic Station.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten:
Tenderers must be a legally established company.
Documentation requirement:
Company Registration Certificate Foreign tenderers shall instead submit equivalent certificates as prescribed in the legislation of the country where the tenderer is established.
Økonomisk og finansiell stilling:
The tenderer must have good economic and financial capacity to complete the contract.
There are requirements of the tenderer’s equity. See the tender documentation for detailed information.
Documentation requirement: Annual accounts etc. See the tender documentation for detailed information.
Minste nivå(er) av standarder:
— Tenderers must have positive equity.
— Tenderers shall have an equity ratio of at least 10 %.
See the tender documentation for detailed information.
Teknisk og faglig kapasitet:
Tenderers shall have sufficient experience with assignments of a corresponding nature and degree of difficulty.
NPRA and other builders' experiences with the tenderer will be appraised.
Minste nivå(er) av standarder:
See the tender documentation for more detailed information. This also includes a description of how newly founded companies can participate in the competition.
Kontraktutførelse
Vilkår for kontraktoppfyllelse:
C1: General contractual provisions: NS8407:2011.
C2: Special contractual regulations for construction works, the Norwegian National Roads Administration.
C3: The contract document.
The Contract form will be a turnkey contract. The contract type is a fixed sum contract.
Prosedyre
Rettslig grunnlag: 32014L0024
Tidspunkt for mottak av tilbud: 12:00
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Tilbudets gyldighetsperiode: 2019-04-30 📅
Dato for åpning av tilbud: 2019-02-28 📅
Tidspunkt for åpning av tilbud: 12:00
Sted: The tenders will be opened electronically.
Tilleggsinformasjon: Tenderers will not be able to participate in the opening.
Utfyllende informasjon Klageinstans
Navn: Statens vegvesen Region vest
Postadresse: Askedalen 4
Poststed: Leikanger
Postnummer: 6863
Land: Norge 🇳🇴
E-post: firmapost-vest@vegvesen.no📧
Kilde: OJS 2018/S 229-524973 (2018-11-26)
Kunngjøring om tildeling av kontrakt (2019-09-13) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
The project is a turnkey contract that comprises engineering design services, execution and inspections of the new county road 541 from Sakseid to Hestaneset in Bømlo Municipality, as well as engineering design services and execution of work included in the land contracts with the landowners along the route.
The project is split into 2 parts, with a main part and an option part:
Part 1: 'Våge-Hestaneset profile 3250 to 9970';
Part 2: Option 'Sakseid — Våge profile 80 to 3250'.
The project consists of the development plan 'Development Plan County Road 541 Sakseid – Hestaneset' with the National Area Plan-ID 1219201406 dated 13.2.2017.
The project also includes work involved in laying conduits and new electrical installations for Finnås Kraftlag (FK) and moving and establishing water and sewage pipelines for Bømlo vatn og avløpsselskap AS (BVA). Conduits are also to be laid and drawing manholes are to be established for Telenor's sub-supplier, Eltel (ET), in a joint street light ditch on parts of the lot.
The project is a turnkey contract that comprises engineering design services, execution and inspections of the new county road 541 from Sakseid to Hestaneset in Bømlo Municipality, as well as engineering design services and execution of work included in the land contracts with the landowners along the route.
The project is split into 2 parts, with a main part and an option part:
Part 1: 'Våge-Hestaneset profile 3250 to 9970';
Part 2: Option 'Sakseid — Våge profile 80 to 3250'.
The project consists of the development plan 'Development Plan County Road 541 Sakseid – Hestaneset' with the National Area Plan-ID 1219201406 dated 13.2.2017.
The project also includes work involved in laying conduits and new electrical installations for Finnås Kraftlag (FK) and moving and establishing water and sewage pipelines for Bømlo vatn og avløpsselskap AS (BVA). Conduits are also to be laid and drawing manholes are to be established for Telenor's sub-supplier, Eltel (ET), in a joint street light ditch on parts of the lot.
Totalverdi for anskaffelsen: 150 083 638 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Prosedyre
Tilbudstype: Ikke aktuelt
Referanse Datoer
Sendt dato: 2019-09-13 📅
Publiseringsdato: 2019-09-18 📅
Identifikatorer
Kunngjøringsnummer: 2019/S 180-439655
Refererer til kunngjøring: 2018/S 229-524973
OJ-S-utgave: 180
Tilleggsinformasjon
Tender conference 10.1.2019 at 9.30 at Stord Traffic Station.
Gjenstand Anskaffelsens omfang
Kort beskrivelse:
The project is split into 2 parts, with a main part and an option part:
Part 1: 'Våge-Hestaneset profile 3250 to 9970';
Part 2: Option 'Sakseid — Våge profile 80 to 3250'.
The project also includes work involved in laying conduits and new electrical installations for Finnås Kraftlag (FK) and moving and establishing water and sewage pipelines for Bømlo vatn og avløpsselskap AS (BVA). Conduits are also to be laid and drawing manholes are to be established for Telenor's sub-supplier, Eltel (ET), in a joint street light ditch on parts of the lot.
The project also includes work involved in laying conduits and new electrical installations for Finnås Kraftlag (FK) and moving and establishing water and sewage pipelines for Bømlo vatn og avløpsselskap AS (BVA). Conduits are also to be laid and drawing manholes are to be established for Telenor's sub-supplier, Eltel (ET), in a joint street light ditch on parts of the lot.
The road has a total length of approx 10 km. For the 50 km/h zone past Kuleseid and the 60 km/h zone on the stretch Kuleseid-Hidle, the road is to be constructed in accordance with dimension class Sa2 and H1, with a road width of 6,5 m, the remainder is to be constructed in accordance with dimension class HØ2, 7,5 m. This dimension class applies to county roads with a speed limit of 80 km/h and with a dimensioned annual daily traffic count above 1 500 vehicles. The same standard is to be constructed over the entire stretch, even if the amount of traffic could allow a lower standard on parts of the road.
The road has a total length of approx 10 km. For the 50 km/h zone past Kuleseid and the 60 km/h zone on the stretch Kuleseid-Hidle, the road is to be constructed in accordance with dimension class Sa2 and H1, with a road width of 6,5 m, the remainder is to be constructed in accordance with dimension class HØ2, 7,5 m. This dimension class applies to county roads with a speed limit of 80 km/h and with a dimensioned annual daily traffic count above 1 500 vehicles. The same standard is to be constructed over the entire stretch, even if the amount of traffic could allow a lower standard on parts of the road.
A sea filling is to be established in profile area approx. 600-820, with special restrictions for revegetation, design, planting and a return of vegetation that is natural road vegetation for this area.
The entire stretch, including transition zones and transition zones to municipal roads must be lit. The contractor must do the necessary light calculations and engineering for the lighting installations in accordance with the Norwegian Public Road Administration's hand books.
The entire stretch, including transition zones and transition zones to municipal roads must be lit. The contractor must do the necessary light calculations and engineering for the lighting installations in accordance with the Norwegian Public Road Administration's hand books.
Beskrivelse av opsjoner: Part 2: Option 'Sakseid-Våge profile 80 to 3250'
Tilleggsinformasjon: Tender conference 10.1.2019 at 9.30 at Stord Traffic Station.
Tildeling av kontrakt
Dato for kontraktinngåelse: 2019-06-13 📅
Navn: Bertelsen and Garpestad as
Poststed: Egersund
Land: Norge 🇳🇴 Rogaland
🏙️
Totalverdi for anskaffelsen: 150 083 638 NOK 💰
Informasjon om tilbud
Antall mottatte tilbud: 3
Kilde: OJS 2019/S 180-439655 (2019-09-13)