Berlevåg kommune shall construct a new swimming pool building. In addition to the swimming pool, the building shall house areas for a youth club and a dental clinic. The building will be directly connected to the existing sports hall. The entire building will have a total of 1709 m2 over 2 floors, of which the swimming pool and changing rooms make up 880 m2. The main floor will have the swimming pool, changing rooms and a dental clinic. The basement, which will be on the same level as the sports hall, shall have a youth club, technical rooms, communal areas and a gym. All the areas are to fulfil universal design requirements. In addition there will be a lifting system in the swimming pool for disabled persons and it must be possible to raise and lower the bottom of the pool. The pool shall be a steel construction of 12.5 x 8.5 m, with a maximum depth of 1.6 m.
Frist
Fristen for mottak av tilbud var 2018-02-19.
Anskaffelsen ble publisert 2018-01-17.
Kunngjøring av konkurranse (2018-01-17) Gjenstand Anskaffelsens omfang
Tittel: Multi-functional buildings construction work
Kort beskrivelse:
Berlevåg kommune shall construct a new swimming pool building. In addition to the swimming pool, the building shall house areas for a youth club and a dental clinic. The building will be directly connected to the existing sports hall.
The entire building will have a total of 1709 m2 over 2 floors, of which the swimming pool and changing rooms make up 880 m2. The main floor will have the swimming pool, changing rooms and a dental clinic. The basement, which will be on the same level as the sports hall, shall have a youth club, technical rooms, communal areas and a gym.
All the areas are to fulfil universal design requirements. In addition there will be a lifting system in the swimming pool for disabled persons and it must be possible to raise and lower the bottom of the pool. The pool shall be a steel construction of 12.5 x 8.5 m, with a maximum depth of 1.6 m.
Berlevåg kommune shall construct a new swimming pool building. In addition to the swimming pool, the building shall house areas for a youth club and a dental clinic. The building will be directly connected to the existing sports hall.
The entire building will have a total of 1709 m2 over 2 floors, of which the swimming pool and changing rooms make up 880 m2. The main floor will have the swimming pool, changing rooms and a dental clinic. The basement, which will be on the same level as the sports hall, shall have a youth club, technical rooms, communal areas and a gym.
All the areas are to fulfil universal design requirements. In addition there will be a lifting system in the swimming pool for disabled persons and it must be possible to raise and lower the bottom of the pool. The pool shall be a steel construction of 12.5 x 8.5 m, with a maximum depth of 1.6 m.
Berlevåg kommune shall construct a new swimming pool building. In addition to the swimming pool, the building shall house areas for a youth club and a dental clinic. The building will be directly connected to the existing sports hall.
The entire building will have a total of 1709 m2 over 2 floors, of which the swimming pool and changing rooms make up 880 m2. The main floor will have the swimming pool, changing rooms and a dental clinic. The basement, which will be on the same level as the sports hall, shall have a youth club, technical rooms, communal areas and a gym.
The entire building will have a total of 1709 m2 over 2 floors, of which the swimming pool and changing rooms make up 880 m2. The main floor will have the swimming pool, changing rooms and a dental clinic. The basement, which will be on the same level as the sports hall, shall have a youth club, technical rooms, communal areas and a gym.
All the areas are to fulfil universal design requirements. In addition there will be a lifting system in the swimming pool for disabled persons and it must be possible to raise and lower the bottom of the pool. The pool shall be a steel construction of 12.5 x 8.5 m, with a maximum depth of 1.6 m.
All the areas are to fulfil universal design requirements. In addition there will be a lifting system in the swimming pool for disabled persons and it must be possible to raise and lower the bottom of the pool. The pool shall be a steel construction of 12.5 x 8.5 m, with a maximum depth of 1.6 m.
Estimert totalverdi: 29 000 000 NOK 💰
Kort beskrivelse:
The main delivery in this contract is the complete construction work. The ground work and technical professions are announced as separate contracts.
The building will be clad with golden metal sheets on the walls and roof. The form and choice of material intend to attract attention and express the development and optimism in Berlevåg as an urban community, with good offers for inhabitants and visitors. The recessed parts of the facades will have a coloured sheet cladding on the ground floor. The building´s basement will have a dark sheet cladding.
The building will be clad with golden metal sheets on the walls and roof. The form and choice of material intend to attract attention and express the development and optimism in Berlevåg as an urban community, with good offers for inhabitants and visitors. The recessed parts of the facades will have a coloured sheet cladding on the ground floor. The building´s basement will have a dark sheet cladding.
Estimert verdi eksklusive mva: 29 000 000 NOK 💰
Varighet: 15 måneder
Prosedyre
Tidspunkt for mottak av tilbud: 12:00
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Tilbudets gyldighetsperiode: 3 måneder
Dato for åpning av tilbud: 2018-02-19 📅
Tidspunkt for åpning av tilbud: 12:30
Tilleggsinformasjon (2018-02-07) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
Berlevåg kommune shall construct a new swimming pool building. In addition to the swimming pool, the building shall house areas for a youth club and a dental clinic. The building will be directly connected to the existing sports hall.
The entire building will have a total of 1709 m2 over 2 floors, of which the swimming pool and changing rooms make up 880 m2. The main floor will have the swimming pool, changing rooms and a dental clinic. The basement, which will be on the same level as the sports hall, shall have a youth club, technical rooms, communal areas and a gym.
All the areas are to fulfill universal design requirements. In addition, there will be a lifting system in the swimming pool for disabled persons and it must be possible to raise and lower the bottom of the pool. The pool shall be a steel construction of 12.5 x 8.5 m, with a maximum depth of 1.6 m.
Berlevåg kommune shall construct a new swimming pool building. In addition to the swimming pool, the building shall house areas for a youth club and a dental clinic. The building will be directly connected to the existing sports hall.
The entire building will have a total of 1709 m2 over 2 floors, of which the swimming pool and changing rooms make up 880 m2. The main floor will have the swimming pool, changing rooms and a dental clinic. The basement, which will be on the same level as the sports hall, shall have a youth club, technical rooms, communal areas and a gym.
All the areas are to fulfill universal design requirements. In addition, there will be a lifting system in the swimming pool for disabled persons and it must be possible to raise and lower the bottom of the pool. The pool shall be a steel construction of 12.5 x 8.5 m, with a maximum depth of 1.6 m.
All the areas are to fulfill universal design requirements. In addition, there will be a lifting system in the swimming pool for disabled persons and it must be possible to raise and lower the bottom of the pool. The pool shall be a steel construction of 12.5 x 8.5 m, with a maximum depth of 1.6 m.
All the areas are to fulfill universal design requirements. In addition, there will be a lifting system in the swimming pool for disabled persons and it must be possible to raise and lower the bottom of the pool. The pool shall be a steel construction of 12.5 x 8.5 m, with a maximum depth of 1.6 m.