Moss ferry dock is part of the ferry route Moss-Horten and has two ferry quays that shall be upgraded. The Contracting Authority consists primarily of replacing the existing ferry bridges with two new 12 x 18 standard ferry bridges, and to replace the existing bumpers along Vælebrygga with new. There is also an option in the competition on a new duc d'albe [dolphin]. In the Moss-Horten ferry route, there are seasonal variations in the amount of traffic. In the period that the upgrading occurs, there will only be on quay operative at a time and cooperating gains reduced capacity and higher risk of operational disruptions. The upgrading of the ferry landings shall therefore occur in the periods with the least traffic quantity. Quay 1 shall be upgraded in the period 16.10.2017 — 9.3.2018 and quay 2 in the period 15.10.2018 — 1.3.2019. If the option is triggered, the workers start immediately, the works shall be completed with the completion deadline for quay 1 (9.3.2018).
Frist
Fristen for mottak av tilbud var 2017-08-24.
Anskaffelsen ble publisert 2017-07-12.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2017-07-12) Gjenstand Anskaffelsens omfang
Tittel: Quay construction work
Referansenummer: 17/46286
Kort beskrivelse:
Moss ferry dock is part of the ferry route Moss-Horten and has two ferry quays that shall be upgraded. The Contracting Authority consists primarily of replacing the existing ferry bridges with two new 12 x 18 standard ferry bridges, and to replace the existing bumpers along Vælebrygga with new. There is also an option in the competition on a new duc d'albe [dolphin].
In the Moss-Horten ferry route, there are seasonal variations in the amount of traffic. In the period that the upgrading occurs, there will only be on quay operative at a time and cooperating gains reduced capacity and higher risk of operational disruptions. The upgrading of the ferry landings shall therefore occur in the periods with the least traffic quantity. Quay 1 shall be upgraded in the period 16.10.2017 — 9.3.2018 and quay 2 in the period 15.10.2018 — 1.3.2019. If the option is triggered, the workers start immediately, the works shall be completed with the completion deadline for quay 1 (9.3.2018).
Moss ferry dock is part of the ferry route Moss-Horten and has two ferry quays that shall be upgraded. The Contracting Authority consists primarily of replacing the existing ferry bridges with two new 12 x 18 standard ferry bridges, and to replace the existing bumpers along Vælebrygga with new. There is also an option in the competition on a new duc d'albe [dolphin].
In the Moss-Horten ferry route, there are seasonal variations in the amount of traffic. In the period that the upgrading occurs, there will only be on quay operative at a time and cooperating gains reduced capacity and higher risk of operational disruptions. The upgrading of the ferry landings shall therefore occur in the periods with the least traffic quantity. Quay 1 shall be upgraded in the period 16.10.2017 — 9.3.2018 and quay 2 in the period 15.10.2018 — 1.3.2019. If the option is triggered, the workers start immediately, the works shall be completed with the completion deadline for quay 1 (9.3.2018).
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Anleggsarbeid i forbindelse med Kai📦
Tilleggs-CPV: Anleggsarbeid i forbindelse med Kai📦 Utførelsessted
NUTS-region: Østfold
🏙️
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Laveste pris
Moss ferry dock is part of the ferry route Moss-Horten and has two ferry quays that shall be upgraded. The Contracting Authority consists primarily of replacing the existing ferry bridges with two new 12 x 18 standard ferry bridges, and to replace the existing bumpers along Vælebrygga with new. There is also an option in the competition on a new duc d'albe [dolphin].
Moss ferry dock is part of the ferry route Moss-Horten and has two ferry quays that shall be upgraded. The Contracting Authority consists primarily of replacing the existing ferry bridges with two new 12 x 18 standard ferry bridges, and to replace the existing bumpers along Vælebrygga with new. There is also an option in the competition on a new duc d'albe [dolphin].
In the Moss-Horten ferry route, there are seasonal variations in the amount of traffic. In the period that the upgrading occurs, there will only be on quay operative at a time and cooperating gains reduced capacity and higher risk of operational disruptions. The upgrading of the ferry landings shall therefore occur in the periods with the least traffic quantity. Quay 1 shall be upgraded in the period 16.10.2017 — 9.3.2018 and quay 2 in the period 15.10.2018 — 1.3.2019. If the option is triggered, the workers start immediately, the works shall be completed with the completion deadline for quay 1 (9.3.2018).
In the Moss-Horten ferry route, there are seasonal variations in the amount of traffic. In the period that the upgrading occurs, there will only be on quay operative at a time and cooperating gains reduced capacity and higher risk of operational disruptions. The upgrading of the ferry landings shall therefore occur in the periods with the least traffic quantity. Quay 1 shall be upgraded in the period 16.10.2017 — 9.3.2018 and quay 2 in the period 15.10.2018 — 1.3.2019. If the option is triggered, the workers start immediately, the works shall be completed with the completion deadline for quay 1 (9.3.2018).
Estimert totalverdi: 46 000 000 NOK 💰
Kort beskrivelse:
Approximate primary amounts in the contract (the list is not exhaustive, the number in parenthesis is the amount including option):
2 12 x 18 standard ferry quay bridge.
1 x footbridge in steel).
2 Hydraulic aggregate.
655 lm Ø711 driven steel piles.
150 (850) lm Ø813 driven steel piles.
627 (1262) m3 concrete.
86 (179) tonnes of reinforcement.
12 (13) x Fender panels.
2 (4) x 50 tonnes of bollard.
Estimert verdi eksklusive mva: 46 000 000 NOK 💰
Varighet: 14 måneder
Beskrivelse av opsjoner:
In the tender documentation there is an option for the works with a new dolphin. The dolphin is described under area code ‘03 Dolphin with foot bridge’. The Contractor will, by the 2. Month after signing of the contract, give written notification regarding whether the option will be triggered or not. If the option is triggered, the works can start immediately, the works shall be completed by the completion deadline for quay 1 (9.3.2018).
In the tender documentation there is an option for the works with a new dolphin. The dolphin is described under area code ‘03 Dolphin with foot bridge’. The Contractor will, by the 2. Month after signing of the contract, give written notification regarding whether the option will be triggered or not. If the option is triggered, the works can start immediately, the works shall be completed by the completion deadline for quay 1 (9.3.2018).
Utførelsessted
Hovedsted eller utførelsessted: Moss.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten: See the tender documentation.
Prosedyre
Tidspunkt for mottak av tilbud: 12:00
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Tilbudets gyldighetsperiode: 2017-11-02 📅
Dato for åpning av tilbud: 2017-08-24 📅
Tidspunkt for åpning av tilbud: 12:30
Sted: The Roads Office in Moss, 12.30.
Address: Skoggata 19, Moss.
Norway.
Tilleggsinformasjon: Tenderers.
Utfyllende informasjon Klageinstans
Navn: Statens vegvesen
Postadresse: Postboks 1010
Poststed: Lillehammer
Postnummer: 2605
Land: Norge 🇳🇴
Telefon: +47 22073000📞
E-post: firmapost-ost@vegvesen.no📧
Internettadresse: https://www.vegvesen.no/🌏
Informasjon om frister for klage: See the tender documentation.
Kilde: OJS 2017/S 133-273524 (2017-07-12)
Kunngjøring om tildeling av kontrakt (2017-10-09) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
Moss ferry dock is part of the ferry route Moss-Horten and has 2 ferry quays that shall be upgraded. The Contracting Authority consists primarily of replacing the existing ferry bridges with 2 new 12 x 18 standard ferry bridges, and to replace the existing bumpers along Vælebrygga with new. There is also an option in the competition on a new duc d'albe [dolphin].
In the Moss-Horten ferry route, there are seasonal variations in the amount of traffic. In the period that the upgrading occurs, there will only be on quay operative at a time and cooperating gains reduced capacity and higher risk of operational disruptions. The upgrading of the ferry landings shall therefore occur in the periods with the least traffic quantity. Quay 1 shall be upgraded in the period 16.10.2017 — 9.3.2018 and quay 2 in the period 15.10.2018 — 1.3.2019. If the option is triggered, the workers start immediately, the works shall be completed with the completion deadline for quay 1 (9.3.2018).
Moss ferry dock is part of the ferry route Moss-Horten and has 2 ferry quays that shall be upgraded. The Contracting Authority consists primarily of replacing the existing ferry bridges with 2 new 12 x 18 standard ferry bridges, and to replace the existing bumpers along Vælebrygga with new. There is also an option in the competition on a new duc d'albe [dolphin].
In the Moss-Horten ferry route, there are seasonal variations in the amount of traffic. In the period that the upgrading occurs, there will only be on quay operative at a time and cooperating gains reduced capacity and higher risk of operational disruptions. The upgrading of the ferry landings shall therefore occur in the periods with the least traffic quantity. Quay 1 shall be upgraded in the period 16.10.2017 — 9.3.2018 and quay 2 in the period 15.10.2018 — 1.3.2019. If the option is triggered, the workers start immediately, the works shall be completed with the completion deadline for quay 1 (9.3.2018).
Totalverdi for anskaffelsen: 43637349.88 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Prosedyre
Tilbudstype: Ikke aktuelt
Referanse Datoer
Sendt dato: 2017-10-09 📅
Publiseringsdato: 2017-10-10 📅
Identifikatorer
Kunngjøringsnummer: 2017/S 194-399499
Refererer til kunngjøring: 2017/S 133-273524
OJ-S-utgave: 194
Gjenstand Anskaffelsens omfang
Kort beskrivelse:
Moss ferry dock is part of the ferry route Moss-Horten and has 2 ferry quays that shall be upgraded. The Contracting Authority consists primarily of replacing the existing ferry bridges with 2 new 12 x 18 standard ferry bridges, and to replace the existing bumpers along Vælebrygga with new. There is also an option in the competition on a new duc d'albe [dolphin].
Moss ferry dock is part of the ferry route Moss-Horten and has 2 ferry quays that shall be upgraded. The Contracting Authority consists primarily of replacing the existing ferry bridges with 2 new 12 x 18 standard ferry bridges, and to replace the existing bumpers along Vælebrygga with new. There is also an option in the competition on a new duc d'albe [dolphin].
2 12 x 18 standard ferry quay bridge,
1 x footbridge in steel),
2 Hydraulic aggregate,
655 lm Ø711 driven steel piles,
150 (850) lm Ø813 driven steel piles,
627 (1262) m3 concrete,
86 (179) tonnes of reinforcement,
12 (13) Fender panels,
2 (4) 50 tonnes of bollard.
Tildeling av kontrakt
Dato for kontraktinngåelse: 2017-09-14 📅
Kilde: OJS 2017/S 194-399499 (2017-10-09)