The competition is for the procurement of an engineering design group and a planning consultant. The contract does not include the function engineering design group management (PGL). Instead PGL will be procured in a separate competition. The preliminary project phase will be carried out in 2 stages.. The service in the preliminary project phase shall be carried out in the period 2nd quarter of 2017 — 3rd quarter of 2019. Most of the service will be carried out up until 3rd quarter of 2018, but with an extended preliminary project period due to the expected time for the city planning matter. The matter is expected to be dealt with politically in the 4th quarter of 2019. The contracting authority has an option to extend the contract for the execution phase on the same terms.
Frist
Fristen for mottak av tilbud var 2017-03-22.
Anskaffelsen ble publisert 2017-02-14.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2017-02-14) Gjenstand Anskaffelsens omfang
Tittel: Architectural, construction, engineering and inspection services
Referansenummer: 17/00097
Kort beskrivelse:
The competition is for the procurement of an engineering design group and a planning consultant. The contract does not include the function engineering design group management (PGL). Instead PGL will be procured in a separate competition.
The preliminary project phase will be carried out in 2 stages..
The service in the preliminary project phase shall be carried out in the period 2nd quarter of 2017 — 3rd quarter of 2019. Most of the service will be carried out up until 3rd quarter of 2018, but with an extended preliminary project period due to the expected time for the city planning matter. The matter is expected to be dealt with politically in the 4th quarter of 2019.
The contracting authority has an option to extend the contract for the execution phase on the same terms.
The competition is for the procurement of an engineering design group and a planning consultant. The contract does not include the function engineering design group management (PGL). Instead PGL will be procured in a separate competition.
The preliminary project phase will be carried out in 2 stages..
The service in the preliminary project phase shall be carried out in the period 2nd quarter of 2017 — 3rd quarter of 2019. Most of the service will be carried out up until 3rd quarter of 2018, but with an extended preliminary project period due to the expected time for the city planning matter. The matter is expected to be dealt with politically in the 4th quarter of 2019.
The contracting authority has an option to extend the contract for the execution phase on the same terms.
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
Referanse Datoer
Sendt dato: 2017-02-14 📅
Innleveringsfrist: 2017-03-22 📅
Publiseringsdato: 2017-02-16 📅
Startdato: 2017-05-02 📅
Sluttdato: 2019-09-27 📅
Identifikatorer
Kunngjøringsnummer: 2017/S 033-060811
OJ-S-utgave: 33
Tilleggsinformasjon
The tenders will be opened by 2 employees from Omsorgsbygg Oslo KF.
Gjenstand Anskaffelsens omfang
Kort beskrivelse:
The competition is for the procurement of an engineering design group and a planning consultant. The contract does not include the function engineering design group management (PGL). Instead PGL will be procured in a separate competition.
The preliminary project phase will be carried out in 2 stages..
The service in the preliminary project phase shall be carried out in the period 2nd quarter of 2017 — 3rd quarter of 2019. Most of the service will be carried out up until 3rd quarter of 2018, but with an extended preliminary project period due to the expected time for the city planning matter. The matter is expected to be dealt with politically in the 4th quarter of 2019.
The service in the preliminary project phase shall be carried out in the period 2nd quarter of 2017 — 3rd quarter of 2019. Most of the service will be carried out up until 3rd quarter of 2018, but with an extended preliminary project period due to the expected time for the city planning matter. The matter is expected to be dealt with politically in the 4th quarter of 2019.
The contracting authority has an option to extend the contract for the execution phase on the same terms.
The competition is for the procurement of an engineering design group and a planning consultant. See the attached performance description in annex 1 for further details on the assignment.
Option for an extension of the assignment for the execution phase after the approved KS2.
The contract does not include the function engineering design group management (PGL). Instead PGL will be procured in a separate competition.
Background:
KVU and KS1 were the decision basis for the city council matter 1088/16, in which a decision was made to implement the preliminary project phase for a new large city emergency doctor surgery. The documents indicate an investment need of approx. 4 000 000 000 NOK. Omsorgsbygg has the builder role (operative executor) in the project.
KVU and KS1 were the decision basis for the city council matter 1088/16, in which a decision was made to implement the preliminary project phase for a new large city emergency doctor surgery. The documents indicate an investment need of approx. 4 000 000 000 NOK. Omsorgsbygg has the builder role (operative executor) in the project.
As Omsorgsbygg was not involved in the process before the KVU and KS1, Omsorgsbygg carried out an independent assessment in autumn 2016 of the matter's actual sides, with assistance from Metier AS.
Omsorgsbygg has, with assistance from Metier, prepared a governing document for the preliminary phase document. The governing document provides an overview of the central conditions of the project and shall clarify the project's aim, frameworks and prerequisites, see annex 5.
Omsorgsbygg has, with assistance from Metier, prepared a governing document for the preliminary phase document. The governing document provides an overview of the central conditions of the project and shall clarify the project's aim, frameworks and prerequisites, see annex 5.
Omsorgsbygg would like to carry out the preliminary project phase in 2 stages:
— Stage No 1 involves updating programme documents and carrying out a sketch document (with the subsequent new calculations and uncertainty analysis). This is to ensure a sufficiently ‘mature’ project before the engineering design services are started at preliminary project level. This is planned to be carried out in the 3rd quarter of 2017.
— Stage No 1 involves updating programme documents and carrying out a sketch document (with the subsequent new calculations and uncertainty analysis). This is to ensure a sufficiently ‘mature’ project before the engineering design services are started at preliminary project level. This is planned to be carried out in the 3rd quarter of 2017.
— Stage No 2, with ordinary preliminary project work, starts, according to the plan in the 4th quarter of 2017, with the expected completion during the 3rd quarter of 2018. When the preliminary project, including the governing document for the construction phase, has been prepared and KS2 has been carried out, a decision can be made on commissioning the construction phase.
— Stage No 2, with ordinary preliminary project work, starts, according to the plan in the 4th quarter of 2017, with the expected completion during the 3rd quarter of 2018. When the preliminary project, including the governing document for the construction phase, has been prepared and KS2 has been carried out, a decision can be made on commissioning the construction phase.
The completion date in the KVU document is set to 2022. Omsorgsbygg considers that 2023 is now more realistic than 2022, based on the current uncertainty regarding, amongst other things, the development process. However, if the development work can be done quicker than what Omsorgsbygg assumes in this first analysis, the completion date can also be earlier.
The completion date in the KVU document is set to 2022. Omsorgsbygg considers that 2023 is now more realistic than 2022, based on the current uncertainty regarding, amongst other things, the development process. However, if the development work can be done quicker than what Omsorgsbygg assumes in this first analysis, the completion date can also be earlier.
See the tender documentation and annexes for further information.
Beskrivelse av opsjoner:
The contracting authority has an option to extend the contract for the execution phase on the same terms.
The service in the preliminary project phase shall be carried out in the period 2nd quarter of 2017 — 3rd quarter of 2019. Most of the service will be carried out up until 3rd quarter of 2018, but with an extended preliminary project period due to the expected time for the city planning matter. The matter is expected to be dealt with politically in the 4th quarter of 2019.
The service in the preliminary project phase shall be carried out in the period 2nd quarter of 2017 — 3rd quarter of 2019. Most of the service will be carried out up until 3rd quarter of 2018, but with an extended preliminary project period due to the expected time for the city planning matter. The matter is expected to be dealt with politically in the 4th quarter of 2019.
The completion date in the KVU document is set to 2022. Omsorgsbygg considers that 2023 is now more realistic than 2022, based on the current uncertainty regarding, amongst other things, the development process. However, if the development work can be done quicker than what Omsorgsbygg assumes in this first analysis, the completion date can also be earlier.
The completion date in the KVU document is set to 2022. Omsorgsbygg considers that 2023 is now more realistic than 2022, based on the current uncertainty regarding, amongst other things, the development process. However, if the development work can be done quicker than what Omsorgsbygg assumes in this first analysis, the completion date can also be earlier.
Utførelsessted
Hovedsted eller utførelsessted: Oslo.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten: The tenderer shall be a legally established company.
Kontraktutførelse
Vilkår for kontraktoppfyllelse: See the tender documentation and annexes.
Prosedyre
Tidspunkt for mottak av tilbud: 11:00
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Tilbudets gyldighetsperiode: 3 måneder
Dato for åpning av tilbud: 2017-03-22 📅
Tidspunkt for åpning av tilbud: 12:00
Sted: Omsorgsbygg Oslo KF [Oslo municipality, the Municipal Undertaking for Social Service Buildings], Sommerrogata 1, 0255 Oslo.
Tilleggsinformasjon: The tenders will be opened by 2 employees from Omsorgsbygg Oslo KF.
Utfyllende informasjon Klageinstans
Navn: Omsorsbygg Oslo KF
Poststed: Oslo
Land: Norge 🇳🇴
Kilde: OJS 2017/S 033-060811 (2017-02-14)
Kunngjøring om tildeling av kontrakt (2017-07-07) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
The competition is for the procurement of an engineering design group and a planning consultant. The contract does not include the function engineering design group management (PGL). Instead PGL will be procured in a separate competition.
The preliminary project phase will be carried out in 2 stages.
The service in the preliminary project phase shall be carried out in the period 2nd quarter of 2017 — 3rd quarter of 2019. Most of the service will be carried out up until 3rd quarter of 2018, but with an extended preliminary project period due to the expected time for the city planning matter. The matter is expected to be dealt with politically in the 4th quarter of 2019.
The contracting authority has an option to extend the contract for the execution phase on the same terms.
The competition is for the procurement of an engineering design group and a planning consultant. The contract does not include the function engineering design group management (PGL). Instead PGL will be procured in a separate competition.
The preliminary project phase will be carried out in 2 stages.
The service in the preliminary project phase shall be carried out in the period 2nd quarter of 2017 — 3rd quarter of 2019. Most of the service will be carried out up until 3rd quarter of 2018, but with an extended preliminary project period due to the expected time for the city planning matter. The matter is expected to be dealt with politically in the 4th quarter of 2019.
The contracting authority has an option to extend the contract for the execution phase on the same terms.
Totalverdi for anskaffelsen: 62 250 000 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Referanse Datoer
Sendt dato: 2017-07-07 📅
Publiseringsdato: 2017-07-11 📅
Identifikatorer
Kunngjøringsnummer: 2017/S 130-267119
Refererer til kunngjøring: 2017/S 033-060811
OJ-S-utgave: 130
Gjenstand Anskaffelsens omfang
Kort beskrivelse:
The preliminary project phase will be carried out in 2 stages.
KVU and KS1 were the decision basis for the city council matter 1088/16, in which a decision was made to implement the preliminary project phase for a new large city emergency doctor surgery. The documents indicate an investment need of approx. NOK 4 billion. Omsorgsbygg has the builder role (operative executor) in the project.
KVU and KS1 were the decision basis for the city council matter 1088/16, in which a decision was made to implement the preliminary project phase for a new large city emergency doctor surgery. The documents indicate an investment need of approx. NOK 4 billion. Omsorgsbygg has the builder role (operative executor) in the project.
Omsorgsbygg has, with assistance from Metier, prepared a governing document for the preliminary phase document. The governing document provides an overview of the central conditions i the project and shall clarify the project's aim, frameworks and prerequisites, see annex 5.
Omsorgsbygg has, with assistance from Metier, prepared a governing document for the preliminary phase document. The governing document provides an overview of the central conditions i the project and shall clarify the project's aim, frameworks and prerequisites, see annex 5.
— Stage no. 1 involves updating programme documents and carrying out a sketch document (with the subsequent new calculations and uncertainty analysis). This is to ensure a sufficiently ‘mature’ project before the engineering design services are started at preliminary project level. This is planned to be carried out in the 3rd quarter of 2017.
— Stage no. 1 involves updating programme documents and carrying out a sketch document (with the subsequent new calculations and uncertainty analysis). This is to ensure a sufficiently ‘mature’ project before the engineering design services are started at preliminary project level. This is planned to be carried out in the 3rd quarter of 2017.
— Stage no. 2, with ordinary preliminary project work, starts, according to the plan in the 4th quarter of 2017, with the expected completion during the 3rd quarter of 2018. When the preliminary project, including the governing document for the construction phase, has been prepared and KS2 has been carried out, a decision can be made on commissioning the construction phase.
— Stage no. 2, with ordinary preliminary project work, starts, according to the plan in the 4th quarter of 2017, with the expected completion during the 3rd quarter of 2018. When the preliminary project, including the governing document for the construction phase, has been prepared and KS2 has been carried out, a decision can be made on commissioning the construction phase.
Prosedyre Tildelingskriterier
Kvalitetskriterium (navn): The proposed personnel's competence and experience, with relevance to the assignment.
Kvalitetskriterium (vekting): 60
Kvalitetskriterium (navn): Assignment comprehension
Kvalitetskriterium (vekting): 20
Vekting av pris: 20
Tildeling av kontrakt
Dato for kontraktinngåelse: 2017-05-12 📅
Oppdragsgiver Kontakt
Kontaktpunkt: Øyvind Høin
Kilde: OJS 2017/S 130-267119 (2017-07-07)