Oppegård municipality (the Contracting Authority) shall invest approx. NOK 1 200 000 in the coming years on new construction, development and adaptation of the building portfolio. The investment projects will vary from 300 m² to 10 000 m² and the contract cost is expected to be up to approx. NOK 200 000 000. Most of the assignments will be new buildings and the projects could have different organisation and enterprise and contract forms. The mentioned projects will lead to an increased need for engineering design services and Oppegård municipality thus invites tenderers to an open tender contest for a framework agreement for engineering design services. The estimated value of the engineering design services included in the framework agreement is NOK 100 000 000.
Frist
Fristen for mottak av tilbud var 2017-07-07.
Anskaffelsen ble publisert 2017-06-06.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2017-06-06) Gjenstand Anskaffelsens omfang
Tittel: Consultative engineering and construction services
Referansenummer: 17/2511
Kort beskrivelse:
Oppegård municipality (the Contracting Authority) shall invest approx. NOK 1 200 000 in the coming years on
new construction, development and adaptation of the building portfolio.
The investment projects will vary from 300 m² to 10 000 m² and the contract cost is expected to be up to approx. NOK 200 000 000. Most of the assignments will be new buildings and the projects could have different organisation and enterprise and contract forms.
The mentioned projects will lead to an increased need for engineering design services and Oppegård municipality thus invites tenderers to an open tender contest for a framework agreement for engineering design services.
The estimated value of the engineering design services included in the framework agreement is NOK 100 000 000.
Oppegård municipality (the Contracting Authority) shall invest approx. NOK 1 200 000 in the coming years on
new construction, development and adaptation of the building portfolio.
The investment projects will vary from 300 m² to 10 000 m² and the contract cost is expected to be up to approx. NOK 200 000 000. Most of the assignments will be new buildings and the projects could have different organisation and enterprise and contract forms.
The mentioned projects will lead to an increased need for engineering design services and Oppegård municipality thus invites tenderers to an open tender contest for a framework agreement for engineering design services.
The estimated value of the engineering design services included in the framework agreement is NOK 100 000 000.
Oppegård municipality (the Contracting Authority) shall invest approx. NOK 1 200 000 in the coming years on
new construction, development and adaptation of the building portfolio.
The investment projects will vary from 300 m² to 10 000 m² and the contract cost is expected to be up to approx. NOK 200 000 000. Most of the assignments will be new buildings and the projects could have different organisation and enterprise and contract forms.
The investment projects will vary from 300 m² to 10 000 m² and the contract cost is expected to be up to approx. NOK 200 000 000. Most of the assignments will be new buildings and the projects could have different organisation and enterprise and contract forms.
The mentioned projects will lead to an increased need for engineering design services and Oppegård municipality thus invites tenderers to an open tender contest for a framework agreement for engineering design services.
The estimated value of the engineering design services included in the framework agreement is NOK 100 000 000.
The assignments include all the necessary disciplines for preparing a feasibility study, a complete
preliminary project with calculations, tender documentation for a turnkey and execution contract, detailed engineering design services,
applications/basic material for the relevant public authorities, as well as being a coordinator for
safety, health and the working environment (SHA) in the engineering design phase, in accordance with the builder regulations. This will be for
building projects such as new buildings (e.g. schools, nurseries, sports halls,
swimming pools), as well as renovation and/or expansions to existing buildings (e.g. schools,
nursing homes).
The contracting authority would like tenders for engineering design services and the engineering design group shall cover the following disciplines
(possibly from sub-suppliers):
- Engineering design group manager (PGL)
- Architect (ARK)
- Responsible applicant (SØK)
- Plan process, including regulation work
- Construction engineering (RIB)
- Building Physics (RIBFy)
- HVAC and sanitation and climate engineering (RIV)
- Electronics (RIE)
Tender documentation over EEA Page 4 of 12
- Fire safety (RIBR)
- Coordinator for engineering design services (KP)
- Landscape architect (LARK)
- Interior architect (IARK)
- Geo engineering and engineering geology (GEO)
- Water and wastewater engineering (RIVA)
- Acoustics (RIA)
- Historical conditions
- Environment (RIM)
- Integrated technical building installations (RITB)
Emphasis is put on the fact that the investment budgets always depend on the annual grants and can vary in the total volume in the contract period. The estimates are not binding for the Contracting Authority. One of the characteristics of a framework agreement is that the concrete assignments and assignment volume are not concretised when the framework agreement is signed. These premises are the actual core in the terms for parallel framework agreements. Call-offs will take place as and when the contracting authority's needs materialise and it involves both parties being aware of this prerequisite and a risk that the extent can deviate — both positively and negatively. Tenderers must be aware that changes in financial and/or political framework terms can lead to the estimated assignment volume being increased/reduced.
Emphasis is put on the fact that the investment budgets always depend on the annual grants and can vary in the total volume in the contract period. The estimates are not binding for the Contracting Authority. One of the characteristics of a framework agreement is that the concrete assignments and assignment volume are not concretised when the framework agreement is signed. These premises are the actual core in the terms for parallel framework agreements. Call-offs will take place as and when the contracting authority's needs materialise and it involves both parties being aware of this prerequisite and a risk that the extent can deviate — both positively and negatively. Tenderers must be aware that changes in financial and/or political framework terms can lead to the estimated assignment volume being increased/reduced.
Beskrivelse av fornyelser: 1 year + 1 year.
Prosedyre
Antall deltakere som skal vurderes: 3
Tidspunkt for mottak av tilbud: 12:00
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Tilbudets gyldighetsperiode: 2017-09-08 📅
Dato for åpning av tilbud: 2017-07-07 📅
Tidspunkt for åpning av tilbud: 12:00
Utfyllende informasjon Klageinstans
Navn: Oppegård kommune
Postadresse: PB 510
Poststed: Kolbotn
Postnummer: 1411
Land: Norge 🇳🇴
Telefon: +47 66819090📞 Tjeneste hvor informasjon om klageprosedyren kan innhentes
Navn: Klagenemnda for offentlige anskaffelser
Postadresse: Postboks 439 Sentrum
Poststed: Bergen
Postnummer: 5805
Telefon: +47 55597500📞
E-post: post@kofa.no📧
Faks: +47 55597599 📠
Internettadresse: http://www.kofa.no/🌏
Kilde: OJS 2017/S 108-218724 (2017-06-06)
Kunngjøring om tildeling av kontrakt (2017-09-28) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
Oppegård municipality (the Contracting Authority) shall invest approx. 1 200 000 000 NOK in the coming years on new construction, development and adaptation of the building portfolio.
The investment projects will vary from 300 m
The mentioned projects will lead to an increased need for engineering design services and Oppegård municipality thus invites tenderers to an open tender contest for a framework agreement for engineering design services.
The estimated value of the engineering design services included in the framework agreement is 100 000 000 NOK.
Oppegård municipality (the Contracting Authority) shall invest approx. 1 200 000 000 NOK in the coming years on new construction, development and adaptation of the building portfolio.
The investment projects will vary from 300 m
The mentioned projects will lead to an increased need for engineering design services and Oppegård municipality thus invites tenderers to an open tender contest for a framework agreement for engineering design services.
The estimated value of the engineering design services included in the framework agreement is 100 000 000 NOK.
Totalverdi for anskaffelsen: 100 000 000 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Prosedyre
Tilbudstype: Ikke aktuelt
Referanse Datoer
Sendt dato: 2017-09-28 📅
Publiseringsdato: 2017-09-30 📅
Identifikatorer
Kunngjøringsnummer: 2017/S 188-386202
Refererer til kunngjøring: 2017/S 108-218724
OJ-S-utgave: 188
Gjenstand Anskaffelsens omfang
Kort beskrivelse:
Oppegård municipality (the Contracting Authority) shall invest approx. 1 200 000 000 NOK in the coming years on new construction, development and adaptation of the building portfolio.
The investment projects will vary from 300 m
The estimated value of the engineering design services included in the framework agreement is 100 000 000 NOK.
The assignments include all the necessary disciplines for preparing a feasibility study, a complete preliminary project with calculations, tender documentation for a turnkey and execution contract, detailed engineering design services, applications/basic material for the relevant public authorities, as well as being a coordinator for safety, health and the working environment (SHA) in the engineering design phase, in accordance with the builder regulations. This will be for building projects such as new buildings (e.g. schools, nurseries, sports halls, swimming pools), as well as renovation and/or expansions to existing buildings (e.g. schools, nursing homes).
The assignments include all the necessary disciplines for preparing a feasibility study, a complete preliminary project with calculations, tender documentation for a turnkey and execution contract, detailed engineering design services, applications/basic material for the relevant public authorities, as well as being a coordinator for safety, health and the working environment (SHA) in the engineering design phase, in accordance with the builder regulations. This will be for building projects such as new buildings (e.g. schools, nurseries, sports halls, swimming pools), as well as renovation and/or expansions to existing buildings (e.g. schools, nursing homes).
The contracting authority would like tenders for engineering design services and the engineering design group shall cover the following disciplines (possibly from sub-suppliers):
o Engineering design group manager (PGL);
o Architect (ARK);
o Responsible applicant (SØK);
o Plan process, including regulation work;
o Construction engineering (RIB);
o Building Physics (RIBFy);
o HVAC and sanitation and climate engineering (RIV);
o Electronics (RIE).
Tender documentation over EEA Page 4 of 12:
o Fire safety (RIBR);
o Coordinator for engineering design services (KP);
o Landscape architect (LARK);
o Interior architect (IARK);
o Geo engineering and engineering geology (GEO);
o Water and wastewater engineering (RIVA);
o Acoustics (RIA);
o Historical conditions;
o Environment (RIM);
o Integrated technical building installations (RITB);
o BIM Coordinator;
o Technical drawer;
o Secretary/document processing/other assistance consultant services.
Tildeling av kontrakt
Dato for kontraktinngåelse: 2017-09-06 📅
Kilde: OJS 2017/S 188-386202 (2017-09-28)