E6 Finneidstraumen, road contract, includes construction of the new E6 in Fauske kommune. Less than 900 metres of new European Road shall be built including complete infrastructure with cable and pipeline work. The contract comprises blasting and establishment of troughs, as well as establishment of Water and Sewage ditches in rock/uncompacted materials. Preparation of fillings, superstructures and associated road equipment. In addition to construction of the road, insitu cast concrete retaining walls shall be established on the north side of the maelstrom. The retaining wall s under 200 metres long. Guidelines on main quantities: Blasting: 40,000 pfm3 Filling works: 10,000 pam3. Excavation Steel core piles: 420 m Structural steel: 465 tonnes Concrete: 1,400 m³ Membrane, Topeka 4S 1,109 m³ Bridge railings, approx. 280 m. Bridge stores: 5 Bridge joint: approx. 14 m. Dehumidifiers: 2.
Frist
Fristen for mottak av tilbud var 2017-09-05.
Anskaffelsen ble publisert 2017-07-11.
Kunngjøring av konkurranse (2017-07-11) Gjenstand Anskaffelsens omfang
Tittel: Construction work
Referansenummer: 17/42326
Kort beskrivelse:
E6 Finneidstraumen, road contract, includes construction of the new E6 in Fauske kommune. Less than 900 metres of new European Road shall be built including complete infrastructure with cable and pipeline work.
The contract comprises blasting and establishment of troughs, as well as establishment of Water and Sewage ditches in rock/uncompacted materials. Preparation of fillings, superstructures and associated road equipment.
In addition to construction of the road, insitu cast concrete retaining walls shall be established on the north side of the maelstrom. The retaining wall s under 200 metres long.
Guidelines on main quantities:
Blasting: 40,000 pfm3
Filling works: 10,000 pam3.
Excavation
Steel core piles: 420 m
Structural steel: 465 tonnes
Concrete: 1,400 m³
Membrane, Topeka 4S 1,109 m³
Bridge railings, approx. 280 m.
Bridge stores: 5
Bridge joint: approx. 14 m.
Dehumidifiers: 2.
E6 Finneidstraumen, road contract, includes construction of the new E6 in Fauske kommune. Less than 900 metres of new European Road shall be built including complete infrastructure with cable and pipeline work.
The contract comprises blasting and establishment of troughs, as well as establishment of Water and Sewage ditches in rock/uncompacted materials. Preparation of fillings, superstructures and associated road equipment.
In addition to construction of the road, insitu cast concrete retaining walls shall be established on the north side of the maelstrom. The retaining wall s under 200 metres long.
Guidelines on main quantities:
Blasting: 40,000 pfm3
Filling works: 10,000 pam3.
Excavation
Steel core piles: 420 m
Structural steel: 465 tonnes
Concrete: 1,400 m³
Membrane, Topeka 4S 1,109 m³
Bridge railings, approx. 280 m.
Bridge stores: 5
Bridge joint: approx. 14 m.
Dehumidifiers: 2.
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsvirksomhet📦
Tilleggs-CPV: Bygge- og anleggsarbeid i forbindelse med Veibru📦 Utførelsessted
NUTS-region: Nordland
🏙️
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Laveste pris
A tender conference will be held 22.8.2017 at 10:00, meet at Fauske traffic station, Follaveien 91 10:00, with subsequent site inspection.
Gjenstand Anskaffelsens omfang
Kort beskrivelse:
E6 Finneidstraumen, road contract, includes construction of the new E6 in Fauske kommune. Less than 900 metres of new European Road shall be built including complete infrastructure with cable and pipeline work.
The contract comprises blasting and establishment of troughs, as well as establishment of Water and Sewage ditches in rock/uncompacted materials. Preparation of fillings, superstructures and associated road equipment.
In addition to construction of the road, insitu cast concrete retaining walls shall be established on the north side of the maelstrom. The retaining wall s under 200 metres long.
Guidelines on main quantities:
Blasting: 40,000 pfm3
Filling works: 10,000 pam3.
Excavation
Steel core piles: 420 m
Structural steel: 465 tonnes
Concrete: 1,400 m³
Membrane, Topeka 4S 1,109 m³
Bridge railings, approx. 280 m.
Bridge stores: 5
Bridge joint: approx. 14 m.
Dehumidifiers: 2.
Blasting: Approx. 4,000 pfm3
Bulk moving of soil: Approx. 37,000 pam3
Bulk moving of blasted stone: Approx. 42,000 pfm3
Concrete retaining wall:
Reinforcement: Approx. 280 tonne
Concrete: approx. 1,800 m³.
Tilleggsinformasjon:
A tender conference will be held 22.8.2017 at 10:00, meet at Fauske traffic station, Follaveien 91 10:00, with subsequent site inspection.
Utførelsessted
Hovedsted eller utførelsessted: Fauske Municipality.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten:
The tenderer is required to have the general qualifications for the offered works. The tenderer must have the necessary expertise and experience, technically, professionally, in organisational terms and administratively.
See the tender documentation for a further description.
Prosedyre
Tidspunkt for mottak av tilbud: 12:00
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Tilbudets gyldighetsperiode: 2017-11-05 📅
Dato for åpning av tilbud: 2017-09-05 📅
Tidspunkt for åpning av tilbud: 12:00
Sted: The Norwegian Public Roads Administration Northern Region/the Regional Road Office.
Dreyfushammarn 31-33
Bodø.
Tilleggsinformasjon: Tenderers.
Tilleggsinformasjon (2017-08-23) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
E6 Finneidstraumen, road contract, includes construction of the new E6 in Fauske kommune. Less than 900 metres of new European Road shall be built including complete infrastructure with cable and pipeline work.
The contract comprises blasting and establishment of troughs, as well as establishment of Water and Sewage ditches in rock/uncompacted materials. Preparation of fillings, superstructures and associated road equipment.
In addition to construction of the road, insitu cast concrete retaining walls shall be established on the north side of the maelstrom. The retaining wall s under 200 metres long.
In addition to construction of the road, insitu cast concrete retaining walls shall be established on the north side of the maelstrom. The retaining wall s under 200 metres long.
Guidelines on main quantities:
Blasting: Approx. 4 000 pfm3
Bulk moving of soil: Approx. 37 000 pam3
Bulk moving of blasted stone: Approx. 42 000 pfm3
Concrete retaining wall:
Reinforcement: Approx. 280 tonne
Concrete: approx. 1 800 m
E6 Finneidstraumen, road contract, includes construction of the new E6 in Fauske kommune. Less than 900 metres of new European Road shall be built including complete infrastructure with cable and pipeline work.
The contract comprises blasting and establishment of troughs, as well as establishment of Water and Sewage ditches in rock/uncompacted materials. Preparation of fillings, superstructures and associated road equipment.
In addition to construction of the road, insitu cast concrete retaining walls shall be established on the north side of the maelstrom. The retaining wall s under 200 metres long.
In addition to construction of the road, insitu cast concrete retaining walls shall be established on the north side of the maelstrom. The retaining wall s under 200 metres long.
Guidelines on main quantities:
Blasting: Approx. 4 000 pfm3
Bulk moving of soil: Approx. 37 000 pam3
Bulk moving of blasted stone: Approx. 42 000 pfm3
Concrete retaining wall:
Reinforcement: Approx. 280 tonne
Concrete: approx. 1 800 m
Metadata for kunngjøring
Dokumenttype: Tilleggsinformasjon
Amendment of the description. The guidelines on main quantities were for the bridge project.
Gjenstand Anskaffelsens omfang
Kort beskrivelse:
Blasting: Approx. 4 000 pfm3
Bulk moving of soil: Approx. 37 000 pam3
Bulk moving of blasted stone: Approx. 42 000 pfm3
Concrete: approx. 1 800 m
Kilde: OJS 2017/S 161-333469 (2017-08-23)
Tilleggsinformasjon (2017-08-29) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
E6 Finneidstraumen, bridge, road contract, includes construction of the new E6 in Fauske kommune. Less than 900 metres of new European Road shall be built including complete infrastructure with cable and pipeline work.
The contract comprises blasting and establishment of troughs, as well as establishment of Water and Sewage ditches in rock/uncompacted materials. Preparation of fillings,superstructures and associated installations are also part of the works.
In addition to construction of the road, insitu cast concrete retaining walls shall be established on the north side of the maelstrom. The retaining wall s under 200 metres long.
Guidelines on main quantities:
Blasting: Approx. 4 000 pfm3
Bulk moving of soil: Approx. 37 000 pam3
Bulk moving of blasted stone: Approx. 42 000 pfm3
Concrete retaining wall:
Reinforcement: Approx. 280 tonne
Concrete: approx. 1 800 m3.
E6 Finneidstraumen, bridge, road contract, includes construction of the new E6 in Fauske kommune. Less than 900 metres of new European Road shall be built including complete infrastructure with cable and pipeline work.
The contract comprises blasting and establishment of troughs, as well as establishment of Water and Sewage ditches in rock/uncompacted materials. Preparation of fillings,superstructures and associated installations are also part of the works.
In addition to construction of the road, insitu cast concrete retaining walls shall be established on the north side of the maelstrom. The retaining wall s under 200 metres long.
E6 Finneidstraumen, bridge, road contract, includes construction of the new E6 in Fauske kommune. Less than 900 metres of new European Road shall be built including complete infrastructure with cable and pipeline work.
The contract comprises blasting and establishment of troughs, as well as establishment of Water and Sewage ditches in rock/uncompacted materials. Preparation of fillings,superstructures and associated installations are also part of the works.