An ITB Coordinator shall be provided in this assignment, H145, who will be responsible for ITB coordination. The ITB Coordinator will be a part of the project's completion group and will report to the Project Manager for completion. Coordination and quality assurance are significant assignments for the ITB Coordinator, whilst each of the contract parties will ensure that the integration of their deliveries with the other technical installations is in accordance with the contractual specifications. The project intends to follow: — NS 6450:2016 Commissioning and trial operation of technical building installations, — NS 3935:2011 Integrated technical building installations (ITB), — ‘Guidelines for Systematic Completion’, issued by BA2015. The assignments will mostly be for the project's final phases with production and completion. See the tender invitation for further information.
Frist
Fristen for mottak av tilbud var 2017-02-20.
Anskaffelsen ble publisert 2017-01-05.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2017-01-05) Gjenstand Anskaffelsens omfang
Tittel: Building consultancy services
Referansenummer: 2016/14186
Kort beskrivelse:
An ITB Coordinator shall be provided in this assignment, H145, who will be responsible for ITB coordination. The ITB Coordinator will be a part of the project's completion group and will report to the Project Manager for completion. Coordination and quality assurance are significant assignments for the ITB Coordinator, whilst each of the contract parties will ensure that the integration of their deliveries with the other technical installations is in accordance with the contractual specifications.
The project intends to follow:
— NS 6450:2016 Commissioning and trial operation of technical building installations,
— NS 3935:2011 Integrated technical building installations (ITB),
— ‘Guidelines for Systematic Completion’, issued by BA2015.
The assignments will mostly be for the project's final phases with production and completion.
See the tender invitation for further information.
An ITB Coordinator shall be provided in this assignment, H145, who will be responsible for ITB coordination. The ITB Coordinator will be a part of the project's completion group and will report to the Project Manager for completion. Coordination and quality assurance are significant assignments for the ITB Coordinator, whilst each of the contract parties will ensure that the integration of their deliveries with the other technical installations is in accordance with the contractual specifications.
The project intends to follow:
— NS 6450:2016 Commissioning and trial operation of technical building installations,
— NS 3935:2011 Integrated technical building installations (ITB),
— ‘Guidelines for Systematic Completion’, issued by BA2015.
The assignments will mostly be for the project's final phases with production and completion.
See the tender invitation for further information.
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
An ITB Coordinator shall be provided in this assignment, H145, who will be responsible for ITB coordination. The ITB Coordinator will be a part of the project's completion group and will report to the Project Manager for completion. Coordination and quality assurance are significant assignments for the ITB Coordinator, whilst each of the contract parties will ensure that the integration of their deliveries with the other technical installations is in accordance with the contractual specifications.
An ITB Coordinator shall be provided in this assignment, H145, who will be responsible for ITB coordination. The ITB Coordinator will be a part of the project's completion group and will report to the Project Manager for completion. Coordination and quality assurance are significant assignments for the ITB Coordinator, whilst each of the contract parties will ensure that the integration of their deliveries with the other technical installations is in accordance with the contractual specifications.
The project intends to follow:
— NS 6450:2016 Commissioning and trial operation of technical building installations,
— NS 3935:2011 Integrated technical building installations (ITB),
— ‘Guidelines for Systematic Completion’, issued by BA2015.
The assignments will mostly be for the project's final phases with production and completion.
See the tender invitation for further information.
An ITB Coordinator shall be provided in this assignment, who will be responsible for ITB coordination. The ITB Coordinator will be a part of the project's completion group and will report to the Project Manager for completion. Coordination and quality assurance are significant assignments for the ITB Coordinator, whilst each of the contract parties will ensure that the integration of their deliveries with the other technical installations is in accordance with the contractual specifications.
An ITB Coordinator shall be provided in this assignment, who will be responsible for ITB coordination. The ITB Coordinator will be a part of the project's completion group and will report to the Project Manager for completion. Coordination and quality assurance are significant assignments for the ITB Coordinator, whilst each of the contract parties will ensure that the integration of their deliveries with the other technical installations is in accordance with the contractual specifications.
The ITB standard establishes the term ITB manager. In PNN we use the term ITB Coordinator for the position, which largely has the same assignments.
— The ITB Coordinator shall check that the interfaces between the different deliveries of the technical systems are in accordance with the building project's specifications, both technically and functionally. It is up to the ITB Coordinator to verify that the necessary communication/transmission of signals and data between the technical systems is possible in a cost efficient and future-orientated way, so that the building's specified functions are fulfilled.
— The ITB Coordinator shall check that the interfaces between the different deliveries of the technical systems are in accordance with the building project's specifications, both technically and functionally. It is up to the ITB Coordinator to verify that the necessary communication/transmission of signals and data between the technical systems is possible in a cost efficient and future-orientated way, so that the building's specified functions are fulfilled.
— The ITB Coordinator shall ensure that each contract party gets information that details the requirements that apply for connecting to other technical installations. Each contract party must work in sufficient resources for interface clarification, implementation and testing in their tender.
— The ITB Coordinator shall ensure that each contract party gets information that details the requirements that apply for connecting to other technical installations. Each contract party must work in sufficient resources for interface clarification, implementation and testing in their tender.
— The ITB Coordinator will participate in the Completion Forum. This consists of the integrators from each of the contractors, as well as the ITB Coordinator, consultant engineers and the completion planner. See the tender invitation for further information.
— The ITB Coordinator will participate in the Completion Forum. This consists of the integrators from each of the contractors, as well as the ITB Coordinator, consultant engineers and the completion planner. See the tender invitation for further information.
Varighet: 36 måneder
Beskrivelse av opsjoner:
An assistant ITB Coordinator shall be offered as an option. An assistance ITB Coordinator shall be offered as an option to complete the ITB assignments if needed.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten:
The tenderer is required to have a legally established company.
Documentation:
Company Registration Certificate, foreign companies are required to have a corresponding certificate as prescribed by the laws of the country where the business is registered.
Økonomisk og finansiell stilling:
Satisfactory solidity and the financial capacity to fulfil the assignment/contract are required.
Documentation:
Credit evaluation/rating, not older than 6 months, based on the last known accounting figures.
The rating shall be carried out by an officially certified credit rating institution. The contracting authority reserves the right to obtain your credit evaluation.
Teknisk og faglig kapasitet:
Tenderers must have a secure implementation ability (capacity).
Considerable experience is required from similar assignments and projects, including experience from testing and commissioning control plants, technical installations or process installations.
Documentation:
Overview of the number of employees in the company, divided between administration and production. Companies with only one employee, who can fulfil this assignment, must enclose a written contract entered into with a different company, verifying that this company will take over the contractual obligations in the event of illness/death.
Overview of the number of employees in the company, divided between administration and production. Companies with only one employee, who can fulfil this assignment, must enclose a written contract entered into with a different company, verifying that this company will take over the contractual obligations in the event of illness/death.
Reference from a maximum of 5 reference projects with information on the contracting authority, the project's size, the assignment's value/nature, date of execution.
Prosedyre
Tidspunkt for mottak av tilbud: 11:00
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Tilbudets gyldighetsperiode: 3 måneder
Dato for åpning av tilbud: 2017-02-20 📅
Tidspunkt for åpning av tilbud: 12:00
Sted: The Directorate of Public Construction and Property (Statsbygg), by the reception on the 7th floor, Biskop Gunnerus' gt. 6, 0155 Oslo.
Tilleggsinformasjon: Public.
Utfyllende informasjon Klageinstans
Navn: Oslo Tingrett
Poststed: Oslo
Land: Norge 🇳🇴
Kilde: OJS 2017/S 005-007960 (2017-01-05)
Kunngjøring om tildeling av kontrakt (2017-07-11) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
An ITB Coordinator shall be provided in this assignment, who will be responsible for ITB coordination.
The ITB Coordinator will be a part of the project's completion group and will report to the Project Manager for completion.
Coordination and quality assurance are significant assignments for the ITB Coordinator, whilst each of the contract parties will ensure that the integration of their deliveries with the other technical installations is in accordance with the contractual specifications.
The project intends to follow:
— NS 6450:2016 Commissioning and trial operation of technical building installations,
— NS 3935:2011 Integrated technical building installations (ITB),
— ‘Guidelines for Systematic Completion’, issued by BA2015.
The assignments will mostly be for the project's final phases with production and completion.
See the tender invitation for further information.
An ITB Coordinator shall be provided in this assignment, who will be responsible for ITB coordination.
The ITB Coordinator will be a part of the project's completion group and will report to the Project Manager for completion.
Coordination and quality assurance are significant assignments for the ITB Coordinator, whilst each of the contract parties will ensure that the integration of their deliveries with the other technical installations is in accordance with the contractual specifications.
The project intends to follow:
— NS 6450:2016 Commissioning and trial operation of technical building installations,
— NS 3935:2011 Integrated technical building installations (ITB),
— ‘Guidelines for Systematic Completion’, issued by BA2015.
The assignments will mostly be for the project's final phases with production and completion.
See the tender invitation for further information.
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Prosedyre
Tilbudstype: Ikke aktuelt
Referanse Datoer
Sendt dato: 2017-07-11 📅
Publiseringsdato: 2017-07-13 📅
Identifikatorer
Kunngjøringsnummer: 2017/S 132-271289
Refererer til kunngjøring: 2017/S 005-007960
OJ-S-utgave: 132
Gjenstand Anskaffelsens omfang
Kort beskrivelse:
An ITB Coordinator shall be provided in this assignment, who will be responsible for ITB coordination.
The ITB Coordinator will be a part of the project's completion group and will report to the Project Manager for completion.
Coordination and quality assurance are significant assignments for the ITB Coordinator, whilst each of the contract parties will ensure that the integration of their deliveries with the other technical installations is in accordance with the contractual specifications.
Coordination and quality assurance are significant assignments for the ITB Coordinator, whilst each of the contract parties will ensure that the integration of their deliveries with the other technical installations is in accordance with the contractual specifications.
— The ITB Coordinator shall check that the interfaces between the different deliveries of the technical systems are in accordance with the building project's specifications, both technically and functionally. It up to the ITB Coordinator to verify that the necessary communication/transmission of signals and data between the technical systems is possible in a cost efficient and future-orientated way, so that the building's specified functions are fulfilled.
— The ITB Coordinator shall check that the interfaces between the different deliveries of the technical systems are in accordance with the building project's specifications, both technically and functionally. It up to the ITB Coordinator to verify that the necessary communication/transmission of signals and data between the technical systems is possible in a cost efficient and future-orientated way, so that the building's specified functions are fulfilled.
— The ITB Coordinator will participate in the Completion Forum. This consists of the integrators from each of the contractors, as well as the ITB Coordinator, consultant engineers and the completion planner.