UBRA, Sub-Project heating, ventilation and sanitation

Oslo kommune, Vann og Avløpsetaten (VAV) [Oslo municipality, The Agency for Water and Sewage Works]

The capacity at Bekkelaget treatment facility shall be expanded to double capacity. After the expansion has been carried out, there will be the capacity to receive waste water from 490 000 person equivalents (pe) and, including rain water/melted snow, the facility shall be able to treat approx. 85 000 000 m³ sewage water per annum.

Frist

Fristen for mottak av tilbud var 2017-01-05. Anskaffelsen ble publisert 2016-12-03.

Hvem? Hva? Hvor?
Anskaffelseshistorikk
Dato Dokument
2016-12-03 Kunngjøring av konkurranse
2017-06-08 Kunngjøring om tildeling av kontrakt
Kunngjøring av konkurranse (2016-12-03)
Gjenstand
Anskaffelsens omfang
Tittel: Plumbing and sanitary works
Antall eller omfang:
The heating, ventilation and sanitation technical installations consist of ventilation, cooling, sprinklers for the new and parts of the old plant, flushing and fire alarms, sanitary installations, heating installations, humidity treatment filters and pressurised air installations for the new part of BRA, as well as external work in the administration building.A new air treatment plant shall be established for the new part of the plant, with a new air intake in the southern escape tunnel with pre-heating via heat from the treated sewage water. Furthermore, a channel system and auxiliary fans shall be established around the plant for distributing air. The air in the fat reception and rooms in the cross hall is to be treated in separate aggregates. The channel system shall include all the necessary supply air/extraction points, regulating damper, fire damper, sound traps and insulation.Acid proof channels for polluted extraction are to be laid to a new bio-filter, which is to be established in a separate niche in the access tunnel. Some channels will need to be altered so that the air is distributed between the old and new bio-filter in the best possible way.The heating installations are to be based on an expansion of the existing water-borne installations, in which heat is provided from a heap pump and oil/gas boiler. After the expansion, the heat production shall be at two temperature levels, high temperature (HT) 70°C and low temperature (LT) 45°C respectively. Each system is to be equipped with accumulator tanks built on site of 75 m3 and 275 m3 respectively, and communication pipes between the tanks. A new electrical boiler of 1,5 MW shall be installed. Heat recovery from blowing machines and pressurised air compressors shall be established and connected to the plant. Furthermore, heat pipes shall be laid to the heat exchangers for heating the mixed sludge, fat and for heating the ventilation. In addition a new heat recovery system shall be assembled for extracting heat from the treated sewage water. The pipe installations shall be complete with the accompanying pumps, valves, insulation, expansion vessels etc.The existing sanitary installations shall be expanded with combined flushing stations/fire stations for the new installations, as well as connection points for new machines. Ordinary sanitary installations shall be installed in the plant, such as toilets, showers, hand basins and slop sinks, as well as emergency and eye showers. The existing hydrophor installations with UV-treatment for treated sewage water shall be expanded. Points for high pressure flushing shall be established in hall 0 and the fat reception.The existing pressurised air installations that provide instrument air shall be expanded.Sprinkler installations are to be established with water fog in the access tunnel to the fat reception. The sprinkler installations shall be supplied from a separate water intake from a manhole on the outside through the tunnel system. Separate fire stations with options to connect to the fire service shall be established.A new air treatment plant, with separate aggregates for a workshop and laboratory shall be established for the administration building's expansion. In addition the laboratory is to be equipped with special extraction. The existing heating and sanitary installations are to be expanded to cover the new parts. The new areas are to be heated with radiators and underfloor heating.The estimated contract volume is approx. 80 000 000 NOK.80 000 000
Vis mer
Totalverdi for anskaffelsen: 80 000 000 💰
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Blikkenslager og rørleggerarbeid 📦

Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet

Oppdragsgiver
Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Regionalt eller lokalt byrå/kontor
Navn på tildelende myndighet: Oslo kommune, Vann og Avløpsetaten (VAV) [Oslo municipality, The Agency for Water and Sewage Works]
Postadresse: Herslebs gate 5
Postnummer: 0506
Poststed: Oslo
Kontakt
E-post: postmottak@vav.oslo.kommune.no 📧
Telefon: +47 02180 📞

Referanse
Datoer
Sendt dato: 2016-12-03 📅
Innleveringsfrist: 2017-01-05 📅
Publiseringsdato: 2016-12-06 📅
Identifikatorer
Kunngjøringsnummer: 2016/S 235-429358
OJ-S-utgave: 235

Gjenstand
Anskaffelsens omfang
Kort beskrivelse:
The capacity at Bekkelaget treatment facility shall be expanded to double capacity. After the expansion has been carried out, there will be the capacity to receive waste water from 490 000 person equivalents (pe) and, including rain water/melted snow, the facility shall be able to treat approx. 85 000 000 m³ sewage water per annum.
Vis mer
Incoming waste water with a flow of up to 3,5 m³/s will be able to be treated biologically in a total of eight bio-basins, of which four basins are new. An increasing flow of the sewage amounts over 3,5 m³/s up to 7,0 m³/s will be treated with direct precipitation over new primary settling basins and lead directly to a new emission pipeline. The new emission pipeline was installed in the Midgardsormen project. At times of heavy precipitation amounts above 7,0 m³/s, the waste water will be lead to this emission pipeline via a seiving station, which was established in the mentioned project.
Vis mer
The sludge treatment will be completed with 2 new rotten tanks, a new sludge building and a new fat station. Some alterations will be made in the existing sludge building and parts of the dewatering and heat recovery equipment shall be replaced. The biogas that is produced will be led into the existing gas processing for upgrading to fuel quality. A new torch will be applicable.
Vis mer
The contract comprises all heating, ventilation and sanitation technical installations in the expanded sewage treatment plant at Bekkelaget, and includes the following:
The heating, ventilation and sanitation technical installations consist of ventilation, cooling, sprinklers for the new and parts of the old plant, flushing and fire alarms, sanitary installations, heating installations, humidity treatment filters and pressurised air installations for the new part of BRA, as well as external work in the administration building.
Vis mer
A new air treatment plant shall be established for the new part of the plant, with a new air intake in the southern escape tunnel with pre-heating via heat from the treated sewage water. Furthermore, a channel system and auxiliary fans shall be established around the plant for distributing air. The air in the fat reception and rooms in the cross hall is to be treated in separate aggregates. The channel system shall include all the necessary supply air/extraction points, regulating damper, fire damper, sound traps and insulation.
Vis mer
Acid proof channels for polluted extraction are to be laid to a new bio-filter, which is to be established in a separate niche in the access tunnel. Some channels will need to be altered so that the air is distributed between the old and new bio-filter in the best possible way.
Vis mer
The heating installations are to be based on an expansion of the existing water-borne installations, in which heat is provided from a heap pump and oil/gas boiler. After the expansion, the heat production shall be at two temperature levels, high temperature (HT) 70°C and low temperature (LT) 45°C respectively. Each system is to be equipped with accumulator tanks built on site of 75 m
Vis mer
The existing sanitary installations shall be expanded with combined flushing stations/fire stations for the new installations, as well as connection points for new machines. Ordinary sanitary installations shall be installed in the plant, such as toilets, showers, hand basins and slop sinks, as well as emergency and eye showers. The existing hydrophor installations with UV-treatment for treated sewage water shall be expanded. Points for high pressure flushing shall be established in hall 0 and the fat reception.
Vis mer
The existing pressurised air installations that provide instrument air shall be expanded.
Sprinkler installations are to be established with water fog in the access tunnel to the fat reception. The sprinkler installations shall be supplied from a separate water intake from a manhole on the outside through the tunnel system. Separate fire stations with options to connect to the fire service shall be established.
Vis mer
A new air treatment plant, with separate aggregates for a workshop and laboratory shall be established for the administration building's expansion. In addition the laboratory is to be equipped with special extraction. The existing heating and sanitary installations are to be expanded to cover the new parts. The new areas are to be heated with radiators and underfloor heating.
Vis mer
Antall eller omfang:
The heating, ventilation and sanitation technical installations consist of ventilation, cooling, sprinklers for the new and parts of the old plant, flushing and fire alarms, sanitary installations, heating installations, humidity treatment filters and pressurised air installations for the new part of BRA, as well as external work in the administration building.
Vis mer
A new air treatment plant shall be established for the new part of the plant, with a new air intake in the southern escape tunnel with pre-heating via heat from the treated sewage water. Furthermore, a channel system and auxiliary fans shall be established around the plant for distributing air. The air in the fat reception and rooms in the cross hall is to be treated in separate aggregates. The channel system shall include all the necessary supply air/extraction points, regulating damper, fire damper, sound traps and insulation.
Vis mer
Acid proof channels for polluted extraction are to be laid to a new bio-filter, which is to be established in a separate niche in the access tunnel. Some channels will need to be altered so that the air is distributed between the old and new bio-filter in the best possible way.
Vis mer
The heating installations are to be based on an expansion of the existing water-borne installations, in which heat is provided from a heap pump and oil/gas boiler. After the expansion, the heat production shall be at two temperature levels, high temperature (HT) 70°C and low temperature (LT) 45°C respectively. Each system is to be equipped with accumulator tanks built on site of 75 m
Vis mer
The existing sanitary installations shall be expanded with combined flushing stations/fire stations for the new installations, as well as connection points for new machines. Ordinary sanitary installations shall be installed in the plant, such as toilets, showers, hand basins and slop sinks, as well as emergency and eye showers. The existing hydrophor installations with UV-treatment for treated sewage water shall be expanded. Points for high pressure flushing shall be established in hall 0 and the fat reception.
Vis mer
The existing pressurised air installations that provide instrument air shall be expanded.
Sprinkler installations are to be established with water fog in the access tunnel to the fat reception. The sprinkler installations shall be supplied from a separate water intake from a manhole on the outside through the tunnel system. Separate fire stations with options to connect to the fire service shall be established.
Vis mer
A new air treatment plant, with separate aggregates for a workshop and laboratory shall be established for the administration building's expansion. In addition the laboratory is to be equipped with special extraction. The existing heating and sanitary installations are to be expanded to cover the new parts. The new areas are to be heated with radiators and underfloor heating.
Vis mer
The estimated contract volume is approx. 80 000 000 NOK.
Referansenummer: 125/2016
Utførelsessted
Hovedsted eller utførelsessted: Oslo.

Juridisk, økonomisk, finansiell og teknisk informasjon
Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten:
The tenderer's tax affairs shall be in order in relation to payment of tax and VAT.
Documentation:
— Tax and VAT certificate, not older than 6 months. The certificate can be ordered and downloaded from Altinn. If this is not possible, it can be ordered from the tax collector or the Norwegian Tax Administration.
Foreign tenderers must provide certificates from equivalent authorities to the Norwegian authorities.
Tenderers shall be a legally established company.
— Norwegian companies: Company Registration Certificate.
— Foreign companies: Proof that the company is registered in a trade index or business register as prescribed by the law of the country where the tenderer is established.
Økonomisk og finansiell stilling:
Requirement:
The tenderer must have the financial capacity to carry out the assignment/contract.
Documentation:
— The company's last three Annual Financial Statements including notes, the board's Annual Reports and Audit Reports, as well as new information of relevance to the company's fiscal figures.
Teknisk og faglig kapasitet:
Requirement:
Tenderers shall have experience from equivalent work, including sites of an equivalent nature as regards extent, complexity and value.
Documentation:
— An overview of work carried out in the last 5 years, together with testimonials of satisfactory execution of the most important work.
The testimonials should state the value, time frame and place the work was carried out and indicate whether the work was professionally executed and properly completed. The authority/contracting authority in question shall, if necessary, send the testimonials directly to the contracting authority.
Vis mer
A contact person and contact information for the contracting authority shall be provided. VAV reserves the right to contact the contracting authority.
The supplier shall have a good ability to fulfil the contract.
— A statement of the tenderer's average workforce and the number of employees in the administrative management during the last 3 years.
Tenderers shall have a good and well-functioning HSE and quality assurance system.
— Certificates issued by independent bodies that confirm that the tenderer fulfils certain quality assurance standards, for example ISO 9001. The contracting authority will also accept other documentation of equivalent quality assurance measures presented by tenderers.
Vis mer
Kontraktutførelse
Personalets navn og faglige kvalifikasjoner

Prosedyre
Minste antall kandidater: 3
Største antall kandidater: 5
Objektive utvelgelseskriterier: Qualification requirements.
Språk
Andre språk: Norwegian.

Oppdragsgiver
Identitet
Nasjonalt registreringsnummer: 971185589
Kontakt
Kontaktpunkt: Espen Erland
Adresse til kjøperprofilen: https://kgv.doffin.no/ctm/Supplier/CompanyInformation/Index/3225 🌏
URL for dokumenter: https://kgv.doffin.no/ctm/Supplier/Documents/Folder/149704 🌏

Referanse
Datoer
Startdato: 2017-06-01 📅
Sluttdato: 2020-07-15 📅
Identifikatorer
Referansenummer tildelt av oppdragsgiver: 125/2016
Kilde: OJS 2016/S 235-429358 (2016-12-03)
Kunngjøring om tildeling av kontrakt (2017-06-08)
Gjenstand
Anskaffelsens omfang
Kort beskrivelse: The competition has been cancelled.
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Felles innkjøpsordliste (CPV)
Tilleggs-CPV: Maskiner for avløpsrensing 📦
Utførelsessted
NUTS-region: Norge 🏙️

Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Ikke aktuelt
Tildelingskriterier
Laveste pris

Oppdragsgiver
Identitet
Navn på tildelende myndighet: Oslo kommune, Vann- og avløpsetaten
Kontakt
Internettadresse: https://www.oslo.kommune.no/?lang=no_NO 🌏

Referanse
Datoer
Sendt dato: 2017-06-08 📅
Publiseringsdato: 2017-06-10 📅
Identifikatorer
Kunngjøringsnummer: 2017/S 110-222508
Refererer til kunngjøring: 2016/S 235-429358
OJ-S-utgave: 110

Utfyllende informasjon
Klageinstans
Navn: Oslo kommune, Vann- og avløpsetaten
Poststed: Oslo
Land: Norge 🇳🇴
Kilde: OJS 2017/S 110-222508 (2017-06-08)