The capacity at Bekkelaget treatment facility shall be expanded to double capacity. After the expansion has been carried out, there will be the capacity to receive waste water from 490,000 person equivalents (pe) and, including rain water/melted snow, the facility shall be able to treat approx. 85 million m3 sewage water per annum. Incoming waste water with a flow of up to 3.5 m³/s will be able to be treated biologically in a total of eight bio-basins, of which four basins are new. An increasing flow of the sewage amounts over 3.5 m3/s up to 7.0 m³/s will be treated with direct precipitation over new primary settling basins and lead directly to a new emission pipeline. The new emission pipeline was installed in the Midgardsormen project. At times of heavy precipitation amounts above 7.0 m³/s, the waste water will be lead to this emission pipeline via a seiving station, which was established in the mentioned project. The sludge treatment will be completed with two new rotten tanks, a new sludge building and a new fat station. Some alterations will be made in the existing sludge building and parts of the dewatering and heat recovery equipment shall be replaced. The biogas that is produced will be led into the existing gas processing for upgrading to fuel quality. A new torch will be applicable. The contract comprises all electro technical installations in the expanded sewage treatment plant at Bekkelaget, and includes the following: New net stations will be established (transformers 11/0,4kV) in the sludge building and traverse hall in the rock plant. New main distributing frames will be erected in the sludge installation and traverse hall. Distributions in hall 0 are fed from the main distributing frame/transformer in Midgardsormen. Distributions, boards (MCC) frequency converters, cabling for building installations and processes are included in the electro contract. Conduit paths shall be galvanised, mounted on media beams in access routes and on floor mounted ‘commuters’ in the halls. Stainless steel pipes are used for cables that are individually fed from cable risers to process units and components. Light fixtures with LED are used for general lighting and floodlights are mounted to illuminate vaults in the halls. The lighting equipment is mounted with consideration to simplified maintenance. In halls and larger rooms, lighting is controlled in sections via CRM. In small rooms, lighting is controlled directly by movement sensors. Every third lighting fixture shall be connected to the central emergency lighting and controlled by access control/CRM. A photoluminescent guiding system and marking lights shall be installed, connected to the central emergency lighting in escape routes. The current backup power generator in the rock plant will be retained, it will be expanded with new protection for UBRA. Externally, a new backup power generator will be installed. Interruption free electricity supply (UPS) is being established in the rock plant for i.a. CRM. A complete fire alarm system will be installed. Aspiration detectors are used in halls, access routes and point detectors in mechanical rooms and distributions/boards. ITV shall be installed for monitoring of process and traffic in the plant. Access control will be installed for ports, access in to the plant, switchboard room and CRM room. Communication in the rock plant is under evaluation.
Frist
Fristen for mottak av tilbud var 2017-01-05.
Anskaffelsen ble publisert 2016-11-30.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2016-11-30) Gjenstand Anskaffelsens omfang
Tittel: Electrical engineering installation works
Antall eller omfang:
New net stations will be established (transformers 11/0,4kV) in the sludge building and traverse hall in the rock plant.New main distributing frames will be erected in the sludge installation and traverse hall. Distributions in hall 0 are fed from the main distributing frame/transformer in Midgardsormen.Distributions, boards (MCC) frequency converters, cabling for building installations and processes are included in the electro contract.Conduit paths shall be galvanised, mounted on media beams in access routes and on floor mounted ‘commuters’ in the halls. Stainless steel pipes are used for cables that are individually fed from cable risers to process units and components.Light fixtures with LED are used for general lighting and floodlights are mounted to illuminate vaults in the halls. The lighting equipment is mounted with consideration to simplified maintenance. In halls and larger rooms, lighting is controlled in sections via CRM. In small rooms, lighting is controlled directly by movement sensors.Every third lighting fixture shall be connected to the central emergency lighting and controlled by access control/CRM.A photoluminescent guiding system and marking lights shall be installed, connected to the central emergency lighting in escape routes.The current backup power generator in the rock plant will be retained, it will be expanded with new protection for UBRA.Externally, a new backup power generator will be installed.Uninterrupted power supply (UPS) is being established in the rock plant for i.a. CRM.A complete fire alarm system will be installed. Aspiration detectors are used in halls, access routes and point detectors in mechanical rooms and distributions/boards.ITV shall be installed for monitoring of process and traffic in the plant.Access control will be installed for ports, access in to the plant, switchboard room and CRM room.Communication in the rock plant is under evaluation.The estimated contract volume is approx. 70 000 000 NOK.70 000 000
New net stations will be established (transformers 11/0,4kV) in the sludge building and traverse hall in the rock plant.New main distributing frames will be erected in the sludge installation and traverse hall. Distributions in hall 0 are fed from the main distributing frame/transformer in Midgardsormen.Distributions, boards (MCC) frequency converters, cabling for building installations and processes are included in the electro contract.Conduit paths shall be galvanised, mounted on media beams in access routes and on floor mounted ‘commuters’ in the halls. Stainless steel pipes are used for cables that are individually fed from cable risers to process units and components.Light fixtures with LED are used for general lighting and floodlights are mounted to illuminate vaults in the halls. The lighting equipment is mounted with consideration to simplified maintenance. In halls and larger rooms, lighting is controlled in sections via CRM. In small rooms, lighting is controlled directly by movement sensors.Every third lighting fixture shall be connected to the central emergency lighting and controlled by access control/CRM.A photoluminescent guiding system and marking lights shall be installed, connected to the central emergency lighting in escape routes.The current backup power generator in the rock plant will be retained, it will be expanded with new protection for UBRA.Externally, a new backup power generator will be installed.Uninterrupted power supply (UPS) is being established in the rock plant for i.a. CRM.A complete fire alarm system will be installed. Aspiration detectors are used in halls, access routes and point detectors in mechanical rooms and distributions/boards.ITV shall be installed for monitoring of process and traffic in the plant.Access control will be installed for ports, access in to the plant, switchboard room and CRM room.Communication in the rock plant is under evaluation.The estimated contract volume is approx. 70 000 000 NOK.70 000 000
Totalverdi for anskaffelsen: 70 000 000 💰
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Elektroteknisk installasjonsarbeid📦
Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
Oppdragsgiver Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Regionalt eller lokalt byrå/kontor
Navn på tildelende myndighet: Oslo kommune, Vann og Avløpsetaten (VAV) [Oslo municipality, The Agency for Water and Sewage Works]
Postadresse: Herslebs gate 5
Postnummer: 0506
Poststed: Oslo
Kontakt
E-post: postmottak@vav.oslo.kommune.no📧
Telefon: +47 02180📞
The capacity at Bekkelaget treatment facility shall be expanded to double capacity. After the expansion has been carried out, there will be the capacity to receive waste water from 490,000 person equivalents (pe) and, including rain water/melted snow, the facility shall be able to treat approx. 85 million m3 sewage water per annum.
The capacity at Bekkelaget treatment facility shall be expanded to double capacity. After the expansion has been carried out, there will be the capacity to receive waste water from 490,000 person equivalents (pe) and, including rain water/melted snow, the facility shall be able to treat approx. 85 million m3 sewage water per annum.
Incoming waste water with a flow of up to 3.5 m³/s will be able to be treated biologically in a total of eight bio-basins, of which four basins are new. An increasing flow of the sewage amounts over 3.5 m3/s up to 7.0 m³/s will be treated with direct precipitation over new primary settling basins and lead directly to a new emission pipeline. The new emission pipeline was installed in the Midgardsormen project. At times of heavy precipitation amounts above 7.0 m³/s, the waste water will be lead to this emission pipeline via a seiving station, which was established in the mentioned project.
Incoming waste water with a flow of up to 3.5 m³/s will be able to be treated biologically in a total of eight bio-basins, of which four basins are new. An increasing flow of the sewage amounts over 3.5 m3/s up to 7.0 m³/s will be treated with direct precipitation over new primary settling basins and lead directly to a new emission pipeline. The new emission pipeline was installed in the Midgardsormen project. At times of heavy precipitation amounts above 7.0 m³/s, the waste water will be lead to this emission pipeline via a seiving station, which was established in the mentioned project.
The sludge treatment will be completed with two new rotten tanks, a new sludge building and a new fat station. Some alterations will be made in the existing sludge building and parts of the dewatering and heat recovery equipment shall be replaced. The biogas that is produced will be led into the existing gas processing for upgrading to fuel quality. A new torch will be applicable.
The sludge treatment will be completed with two new rotten tanks, a new sludge building and a new fat station. Some alterations will be made in the existing sludge building and parts of the dewatering and heat recovery equipment shall be replaced. The biogas that is produced will be led into the existing gas processing for upgrading to fuel quality. A new torch will be applicable.
The contract comprises all electro technical installations in the expanded sewage treatment plant at Bekkelaget, and includes the following:
New net stations will be established (transformers 11/0,4kV) in the sludge building and traverse hall in the rock plant.
New main distributing frames will be erected in the sludge installation and traverse hall. Distributions in hall 0 are fed from the main distributing frame/transformer in Midgardsormen.
Distributions, boards (MCC) frequency converters, cabling for building installations and processes are included in the electro contract.
Conduit paths shall be galvanised, mounted on media beams in access routes and on floor mounted ‘commuters’ in the halls. Stainless steel pipes are used for cables that are individually fed from cable risers to process units and components.
Light fixtures with LED are used for general lighting and floodlights are mounted to illuminate vaults in the halls. The lighting equipment is mounted with consideration to simplified maintenance. In halls and larger rooms, lighting is controlled in sections via CRM. In small rooms, lighting is controlled directly by movement sensors.
Light fixtures with LED are used for general lighting and floodlights are mounted to illuminate vaults in the halls. The lighting equipment is mounted with consideration to simplified maintenance. In halls and larger rooms, lighting is controlled in sections via CRM. In small rooms, lighting is controlled directly by movement sensors.
Every third lighting fixture shall be connected to the central emergency lighting and controlled by access control/CRM.
A photoluminescent guiding system and marking lights shall be installed, connected to the central emergency lighting in escape routes.
The current backup power generator in the rock plant will be retained, it will be expanded with new protection for UBRA.
Externally, a new backup power generator will be installed.
Interruption free electricity supply (UPS) is being established in the rock plant for i.a. CRM.
A complete fire alarm system will be installed. Aspiration detectors are used in halls, access routes and point detectors in mechanical rooms and distributions/boards.
ITV shall be installed for monitoring of process and traffic in the plant.
Access control will be installed for ports, access in to the plant, switchboard room and CRM room.
Communication in the rock plant is under evaluation.
Antall eller omfang:
New net stations will be established (transformers 11/0,4kV) in the sludge building and traverse hall in the rock plant.
New main distributing frames will be erected in the sludge installation and traverse hall. Distributions in hall 0 are fed from the main distributing frame/transformer in Midgardsormen.
Distributions, boards (MCC) frequency converters, cabling for building installations and processes are included in the electro contract.
Conduit paths shall be galvanised, mounted on media beams in access routes and on floor mounted ‘commuters’ in the halls. Stainless steel pipes are used for cables that are individually fed from cable risers to process units and components.
Light fixtures with LED are used for general lighting and floodlights are mounted to illuminate vaults in the halls. The lighting equipment is mounted with consideration to simplified maintenance. In halls and larger rooms, lighting is controlled in sections via CRM. In small rooms, lighting is controlled directly by movement sensors.
Light fixtures with LED are used for general lighting and floodlights are mounted to illuminate vaults in the halls. The lighting equipment is mounted with consideration to simplified maintenance. In halls and larger rooms, lighting is controlled in sections via CRM. In small rooms, lighting is controlled directly by movement sensors.
Every third lighting fixture shall be connected to the central emergency lighting and controlled by access control/CRM.
A photoluminescent guiding system and marking lights shall be installed, connected to the central emergency lighting in escape routes.
The current backup power generator in the rock plant will be retained, it will be expanded with new protection for UBRA.
Externally, a new backup power generator will be installed.
Uninterrupted power supply (UPS) is being established in the rock plant for i.a. CRM.
A complete fire alarm system will be installed. Aspiration detectors are used in halls, access routes and point detectors in mechanical rooms and distributions/boards.
ITV shall be installed for monitoring of process and traffic in the plant.
Access control will be installed for ports, access in to the plant, switchboard room and CRM room.
Communication in the rock plant is under evaluation.
The estimated contract volume is approx. 70 000 000 NOK.
Referansenummer: 124/2016
Utførelsessted
Hovedsted eller utførelsessted: Oslo.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten:
Requirement:
The tenderer's tax affairs shall be in order in relation to payment of tax and VAT.
Documentation:
— Tax and VAT certificate, not older than six months. The certificate can be ordered and downloaded from Altinn. If this is not possible, it can be ordered from the tax collector or the Norwegian Tax Administration
Foreign tenderers must provide certificates from equivalent authorities to the Norwegian authorities.
Tenderers shall be a legally established company.
— Norwegian companies: Company Registration Certificate.
— Foreign companies: Proof that the company is registered in a trade index or business register as prescribed by the law of the country where the tenderer is established.
Økonomisk og finansiell stilling:
Requirement:
The tenderer must have the financial capacity to carry out the assignment/contract.
Documentation:
— The company's last three Annual Financial Statements including notes, the board's Annual Reports and Audit Reports, as well as new information of relevance to the company's fiscal figures.
Teknisk og faglig kapasitet:
Requirement:
Tenderers shall have experience from equivalent work, including sites of an equivalent nature as regards extent, complexity and value.
Documentation:
— An overview of work carried out in the last five years, together with testimonials of satisfactory execution of the most important work.
The testimonials should state the value, time frame and place the work was carried out and indicate whether the work was professionally executed and properly completed. The authority/contracting authority in question shall, if necessary, send the testimonials directly to the contracting authority.
The testimonials should state the value, time frame and place the work was carried out and indicate whether the work was professionally executed and properly completed. The authority/contracting authority in question shall, if necessary, send the testimonials directly to the contracting authority.
A contact person and contact information for the contracting authority shall be provided. VAV reserves the right to contact the contracting authority.
The supplier shall have a good ability to fulfil the contract.
— A statement of the tenderer's average workforce and the number of employees in the administrative management during the last 3 years.
Tenderers shall have a good and well-functioning HSE and quality assurance system.
— Certificates issued by independent bodies that confirm that the tenderer fulfils certain quality assurance standards, for example ISO 9001. The contracting authority will also accept other documentation of equivalent quality assurance measures presented by tenderers.
— Certificates issued by independent bodies that confirm that the tenderer fulfils certain quality assurance standards, for example ISO 9001. The contracting authority will also accept other documentation of equivalent quality assurance measures presented by tenderers.
Kontraktutførelse
Personalets navn og faglige kvalifikasjoner ✅
Prosedyre
Minste antall kandidater: 3
Største antall kandidater: 5
Objektive utvelgelseskriterier: Qualification Requirements.
Språk
Andre språk: Norwegian.
Kunngjøring om tildeling av kontrakt (2017-08-18) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
The contract comprises all electro technical installations in the expanded sewage treatment plant at Bekkelaget, and includes the following:
New net stations will be established (transformers 11/0,4kV) in the sludge building and traverse hall in the rock plant.
New main distributing frames will be erected in the sludge installation and traverse hall. Distributions in hall 0 are fed from the main distributing frame/transformer in Midgardsormen.
Distributions, boards (MCC) frequency converters, cabling for building installations and processes are included in the electro contract.
The contract comprises all electro technical installations in the expanded sewage treatment plant at Bekkelaget, and includes the following:
New net stations will be established (transformers 11/0,4kV) in the sludge building and traverse hall in the rock plant.
New main distributing frames will be erected in the sludge installation and traverse hall. Distributions in hall 0 are fed from the main distributing frame/transformer in Midgardsormen.
Distributions, boards (MCC) frequency converters, cabling for building installations and processes are included in the electro contract.
Totalverdi for anskaffelsen: 72 270 750 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Felles innkjøpsordliste (CPV)
Tilleggs-CPV: Maskiner for avløpsrensing📦 Utførelsessted
NUTS-region: Norge
🏙️
Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Ikke aktuelt
Oppdragsgiver Identitet
Navn på tildelende myndighet: Oslo kommune, Vann- og avløpsetaten
Kontakt
Internettadresse: http://www.vav.oslo.kommune.no🌏
Referanse Datoer
Sendt dato: 2017-08-18 📅
Publiseringsdato: 2017-08-19 📅
Identifikatorer
Kunngjøringsnummer: 2017/S 158-328076
Refererer til kunngjøring: 2016/S 233-425704
OJ-S-utgave: 158
Gjenstand Anskaffelsens omfang
Kort beskrivelse: Electrical installations in the new section of Bekkelaget treatment plant.
Beskrivelse av opsjoner: Option on visitor centre.